Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Groundwater Control For Two-Pass Soft Ground Tunneling

    By Cary Hirner, David Stacey, William A. Rochford

    Design considerations and construction techniques were implemented to address groundwater infiltration from a confined aquifer during the excavation and lining of the Cady Marsh Flood Relief Tunnel. T

    Jan 1, 2007

  • SME
    Design, Testing, and Production of Steel Fiber Reinforced Concrete Segmental Tunnel Lining for the East Side Combined Sewer Overflow Tunnel

    By K. Wongaew, R. F. Cook, J. E. Carlson, T. Cleys, C. R. Smith

    Steel fiber reinforced concrete segmental rings are the final tunnel lining for approximately 85% of the alignment for a 6.706-meter (22-foot) internal diameter tunnel being built as part of the East

    Jan 1, 2007

  • SME
    Design, Construction And Start-Up Of The Ilo Smelter Modernization Project

    By H. Walqui, C. Noriega

    Southern Copper Corporation (SCC) is one of the world’s largest copper companies and is finishing the modernization of the Ilo copper smelter. A single ISASMELTTM furnace will start smelting 1,200,000

    Jan 1, 2007

  • SME
    Minerals Processing 1991

    Microorganisms are finding more use in the mineral industry, with extensive research efforts being reported in 1991. Most of these research efforts were presented in two major meetings, the SME Annual

    Jan 1, 1992

  • SME
    Disc Cutter Performance in Boulder-Laden Ground ? Introduction

    By D. S. Kieffer

    Ground characterized by hard boulders embedded in soft matrix represents one of the most challenging conditions for TBMs, as the cutterhead must cope with the non-optimal conditions of cutting hard bl

    Jan 1, 2008

  • SME
    Data Evaluation for Sustainable Development Indicators

    By S. Möllerherm

    "The evaluation of data and information provided by the existing traditional indicators in sustainability assessments is most important. Therefore the Institute of Mining Engineering I from the RWTH A

    Jan 1, 2005

  • SME
    Evaluating Underground Mining Hazards By Fuzzy FMEA

    By S. K. Oraee

    Managers always look for systems with minimum hazards. The hazards create problems for performance of projects. The largest and most important hazards of working underground mine can be related to he

    Jan 1, 2011

  • SME
    Mojave Sustainability Project – Model For Community Partnerships

    By Neville Slade, Doug Shumway, Dayan Anderson, Joe Siefke, Curtis James

    The Mojave Desert is a particularly fragile ecosystem that faces several significant impacts. These include rapid housing development, overdrafted water supplies and loss of wildlife habitat — all a

    Jan 1, 2005

  • SME
    An Innovation In Machine Tunneling

    By J. Donovan Jacobs

    Many improvements in the art of underground excavation have appeared during the past two decades. These improvements have been both in methods and in machinery and have resulted in more economical con

    Jan 1, 1974

  • SME
    Tunnelling Under Glaciers - Construction Update: Galore Creek Mine Access Tunnel, British Columbia, Canada

    By Dean Brox

    The Galore Creek Mine project is one of the newest major mining projects under development in Canada. The project is located in a very remote area of northwestern British Columbia and is being develop

    Jan 1, 2008

  • SME
    Design of Large and Shallow Caverns of New York Second Avenue Subway

    By Verya Nasri

    The proposed Second Avenue Subway Project in New York City is approximately 8.5 miles long, up to a depth of 120 feet beneath grade and runs the length of the eastern side of the island of Manhattan f

    Jan 1, 2008

  • SME
    In Situ Stress Measurement In A Jointed Basalt: The Suitability Of Five Overcoring Techniques

    By T. A. Rundle, K. Kim, W. M. McCabe, E. C. Gregory

    Overcoring tests were conducted at the Near-Surface Test Facility(NSTF) to assess the suitability of five techniques (U.S. Bureau of Mines borehole deformation gauge (BDG), Commonwealth Scientific and

    Jan 1, 1983

  • SME
    Utilization of Strain Measurements on Shielded Tunnel Boring Machines

    By Brad Murray

    Evaluating the performance of a shielded tunnel boring machine (TBM) can be difficult because the ground cannot be observed directly and in relation to the TBM attitude within the excavation. It is di

    Jan 1, 2008

  • SME
    Steel Fiber Microsilica Shotcrete With Remote Controlled Equipment

    By Galyn Rippentropp, Finn Erik Overlie

    INTRODUCTION The wet shotcreting system utilizing steelfiber microsilica shotcrete with remote controlled equipment (The Robocon System) was developed in Norway 7-8 years ago. Norway was the natura

    Jan 1, 1987

  • SME
    Tying Acceleration And GPS Location Information Together To Create A Mine Management Tool (46eb7fa8-c025-4c28-b865-1393c124ce32)

    By J. Walden, S. Rhoades, R. E. Miller, R. Gibbs, P. Boman

    Accelerometers and pressure transducers mounted in suspension components can be used to monitor the ride of haulage trucks. Presently, it is difficult to tell what caused a jolt to the truck using eit

    Jan 1, 1999

  • SME
    New York City’s Harbor Siphons Water Tunnel

    By Colin Lawrence, Michael S. Schultz

    Due to the planned deepening of the NY Harbor, NYCEDC/NYCDEP is planning to replace two existing water lines between Brooklyn and Staten Island with one deeper water pipe. The crossing, just north of

    Jan 1, 2007

  • SME
    Design And Construction Service Tunnels On Palm Jumeirah Island

    By Ben Hayes, Michael Ryjevski

    The Palm Jumeirah is the smallest of the three Palm Islands (Palm Jumeirah, Palm Jebel Ali and Palm Deira). It is located on the Jumeirah coastal area of the emirate of Dubai, in the United Arab Emira

    Jan 1, 2007

  • SME
    Small Diameter Tunneling?Pipe Jacking Under Leipzig Main Train Station

    By Klaus Rieker

    The main train station of Leipzig in Germany is currently being upgraded from a head station to a partially thru station. In order to achieve this, significant ground improvements are necessary. Soil

    Jan 1, 2008

  • SME
    Warm Springs Ponds: Superfund Success

    By Harry E. Hughes

    A section of the largest Superfund site in the country has become a success story for engineering innovation and for cooperative problem solving. “Superfund site” and “success story” are phrases that

    Jan 1, 1996

  • SME
    Foreign coal is a threat, but US producers are finding ways to compete

    By Steve Kral

    Competition from foreign coal producers could displace as much as 9 Mt/a (10 million stpy) of US coal bound for power plants located near waterways. But, according to a Maryland-based coal consultant,

    Jan 1, 1986