Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Usability of Expert System Integrated With GIS in Blasting Operations

    By U. Gorkhan Akkaya, N. Enver

    Geographic information system (GIS) is one of the most accurate and useful tools to help decision – making for decision-makers. As to expert systems, it provides solutions to the problems faced by mim

    Jan 1, 2013

  • ISEE
    Mining Industry and US Government Cooperative Research: Lessons Learned and Benefits to the Mining Industry

    By Robert Martin, Brian W. Stump, David P. Anderson, W Scott Philips

    Since 1994, various mines in the US have cooperated with research scientists at the Los Alamos and Lawrence Livermore National Laboratories to address issues related to verification of the Comprehensi

    Jan 1, 1997

  • ISEE
    A Holistic Approach to Wall Control Blasting at Yellowstone Talc Mine

    By Tom Barry, Kameron Ray, Dr. Gavin Yuill

    Imerys Talc, Yellowstone Mine in Montana faces significant geotechnical challenges such as poor wall quality and local instabilities. These instabilities are driven primarily by the characteristics of

    Jan 1, 2016

  • ISEE
    Experience with and benefits from the use of 3D Stereophotogrammetry for blast design and control

    By Peter Moser, Mark Ganster, Andreas Gaich

    Surveying of a bench face before blasting is a pre-requisite for a proper blast planning and for a satisfying blasting result both in terms of safety and fragmentation. When surveying a bench face, pr

    Jan 1, 2007

  • ISEE
    Lafarge Exshaw Finer Fragmentation Study

    By Jean-Guy Levaque, Robert Ethier, Ron J. Elliot

    This paper presents data gathered during a comprehensive study on the impact of improvements to fragmentation in a major Limestone quarrying operation. The full impacts of gains in fragmentation are t

    Jan 1, 1999

  • ISEE
    Relationship between peak particle acceleration, velocity and displacement of blast vibration

    By Ruilin Yang

    The following simple equations are frequently used within the blast vibration community;PPA f PPV v = 2p · , PPV f PPD d = 2p · ,a f PPV PPA 2p = , and v f PPD PPV 2p = where, PPA is the peak particle

    Jan 1, 2012

  • ISEE
    Journal: 100 Years / SCIENTIFIC AMERICAN New York November 24, 1906 / BLASTING OUT A REEF IN NEW YORK HARBOR.

    By Robert Hopler

    Some few years ago, when the cruiser “Brooklyn” was passing through the fairway to the southwest of the Battery, the ship being fully equipped with stores, etc., and therefore at her maximum draft, sh

    Jan 1, 2007

  • ISEE
    Explosive Destruction of an Underground Reinforced Concrete Bunker – Computer Hydrocode Simulation

    By Dale Preece

    A carefully designed and controlled in-place destruction experiment was performed on a concrete bunker buried in 4.27 m (14 ft.) of soil. The objective was to determine if the explosive charges would

    Jan 1, 2006

  • ISEE
    Top Hammer Drilling-The Way Things Work

    By William D. Hissem

    For those blasthole applications which require the use of holes ranging from 1” to 5.5” in diameter, the use of top hammer drills has been the equipment of choice for several generations of drillers.

    Jan 1, 1998

  • ISEE
    Analysis of Marine Blast-Induced Ground Vibrations in the Sudeste Port Project

    By Eraldo Florêncio, Paulo Couceiro, Manuel Lopez Cano

    Specialized marine blasting techniques were required to deepen and widen the access channel and turning basin of the Sudeste Port Terminal in Rio de Janeiro, Brazil. This terminal has been designed to

    Jan 1, 2018

  • ISEE
    Garbage Plug Demolition Using a Low Detonation Velocity Explosive in “Presa Mixcoac” Dam, in Mexico City

    By Enrique Albarrán, Julian Hernández

    "In 1942 The “Presa Mixcoac” dam was built, along with 15 other dams, to control the rain fall waterin the mountains west of Mexico City. Mexico City’s population at that time was around 1.5 millionpe

    Jan 1, 2016

  • ISEE
    Explosive Detection Recovery and Disposal

    By Robert McClure

    The detection, recovery and disposal of commercial explosives and explosive waste has always carried a level of risk and requires specialized equipment and technical expertise. Improperly stored, disc

    Jan 1, 2015

  • ISEE
    Explosive Energy In Blast Design Optimization

    By Deepak Vidyarthi

    This paper deals with the significance of Explosive Energy in the optimization of blast design parameters, and the benefits emerging out of it. It is based on the original work done by the author in d

    Jan 1, 2006

  • ISEE
    The History and Development of Permissible Explosives for Underground Coal Mining (99bcf922-54c7-4892-afa2-e6992e96fe29)

    By Robert B. Hopler

    First, a definition: “an explosive is called a permissible explosive when it is similar in all respects to the sample that passed certain tests by the national Bureau of Mines, and when it is used in

    Jan 1, 1995

  • ISEE
    The Effects of Short Delay Times on Rock Fragmentation

    By Joseph Nawrocki, Margaret Hettinger, Dr. Catherine Johnson

    "Optimized rock fragmentation is essential for minimizing downstream costs to mining operations.Photographic fragmentation analysis, vibration monitoring, and high-speed video all providemeasurements

    Jan 1, 2016

  • ISEE
    Investigations of Shock Tunnel Dynamics and Energy Realization (a197a97d-a574-4dd6-b892-bc2dba4e791b)

    By Joshua Hoffman, Braden Lusk, Kyle Perry

    This study explores how different geometries affect the shock tunnel’s performance and is broken down into three phases. Phase 1: Open arena testing in which theoretical energies produced by the deton

    Jan 1, 2009

  • ISEE
    Uses for Blasting Instrumentation - Practical Applications

    By Cam Thomas, Steve Bernard

    Various types of blasting instrumentation can be used in the field to analyze conditions before, during and after a blast, and to indicate what changes need to be made. When different types of measure

    Jan 1, 2012

  • ISEE
    Measuring Underground Face Drilling and Blasting

    By Thomas Barkley

    Recent developments in hardware and software have made accurate measurement of Underground Face (Development) Drilling a reality. New and compact laser profiling equipment makes it possible to measure

    Jan 1, 2003

  • ISEE
    Blast Designs and Instant Diagnostics Using the SVC500 Digital, High-Speed Smart Video Camera System

    By Bruce Vandenberg, Andy Battfay, Don Lake, Steve Conway, Jeff Yorsz

    "High-speed motion pictures are an invaluable resource for blasting analysis. Whether processed by the human eye or a computer, this imagery can provide important insight into a blast and its effects.

    Jan 1, 1994

  • ISEE
    Choosing the Correct Bulk Loading Equipment Can Help Optimize Your Blasting Program

    By R Tom Watts

    The blasting industry has changed more in the last five years than in any period to date. The equipment utilized to load boreholes has changed in response to more precise blasting products and program

    Jan 1, 2000