Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Challenges and Lessons Learned from Shoring Design of 2nd / Broadway Metro Station
By Babak Mamaqani, Pirooz Barar
Regional Connector Transit Corridor (RCC) is part of the Los Angeles metro expansion project under construction which adds three new stations into the system. PB&A was responsible for the design of th
Jan 1, 2019
-
Jet Grouting for Groundwater Cutoff at Tie-in between Existing Tunnel and New Construction
By Aaron Evans, Chu E. Ho, Tom Richards
"This paper describes an innovative case history of using jet grouting to form a groundwater cutoff wall at the interface of a cut-and-cover construction and an existing tunnel. The design of the jet
Jan 1, 2016
-
Cutter Soil Mixing and Augered-Cast-In-Place Piling Close to the Gulf of Mexico
By Justin Simmons, Michael Arnold, Bob Faulhaber
"In order to remodel an existing beach resort on the Gulf of Mexico, an existing three story structure, founded on stepped tapered piles, was to be replaced by a ten-story building with service rooms
Jan 1, 2017
-
Helix Deflection Effect on Load Settlement Behavior of Pile with Increasing Stress Level
By Adnan A. Malik, Tadashi Maejima, Jiro Kuwano
"Previous studies revealed that the helix deflection reduced the end bearing capacity of screw pile in dense ground even if the installation process is completed with minimal soil disturbance. The ult
Jan 1, 2017
-
Metro Rome Line “C” - Artificial Ground Freezing Application for the Underpass of the Existing Metro Station San Giovanni - Line “A”
By Giulia M. B., Ferruccio Cribari, Alessandro Bertero, Eliano Romani, Roberto Sorge, Francesca Casini
"The use of Artificial Ground Freezing (AGF) to form earth support and seepage control barrier systems has had applications worldwide. These cover a variety of construction problems, including the for
Jan 1, 2016
-
Installation of Secant Pile Wall in Rock Adjacent to Fragile Building
By Chu E. Ho, Alfredas Daugiala, Nicola Ebanks
"The construction of an ancillary structure for the new Second Avenue Subway Line in Manhattan, New York City involved a deep excavation in highly variable rock conditions adjacent to a fragile masonr
Jan 1, 2016
-
Change In Bearing Capacity Of Bored Steel H Piles Enclosed In Soil-Cement Columns With Overburden Pressure - Synopsis
By Tomio Tsuchiya
A construction method of bored steel H piles enclosed in soil-cement columns was developed by modifying steel H piles from the driven pile method and soil-cement walls from the earth retaining wall me
Jan 1, 1996
-
Refurbishment Of A Piled Commercial Building With A Single Level Basement For A 70% Increase In Floor Area
By Henry H. Tayler, Eric Sturel
1 Triton Square was originally a six-storey building with a one-level basement located within a commercial development near Euston, London. It was designed and constructed in the 1990s and the foundat
May 1, 2022
-
Guideline for Interpretation of Nondestructive Integrity Testing of Augered Cast-In-Place and Drilled Displacement Piles
"1 INTRODUCTIONThe use of nondestructive testing (NDT) methods to evaluate the integrity of Augered Cast-in-Place (ACIP) and Drilled Displacement (DD) piles has been a subject of significant debate am
Jan 1, 2016
-
Foundation Innovations Ensure Successful Bridge Replacement
By Mark S. Greenleaf, Alec D. Smith, Mary Vittoria-Bertrand, Heather B. Scranton, Jean Louis Z. Locsin
"Rhode Island’s new $163.7 million, 2,265 ft (690 m) long, four-lane Sakonnet River Bridge sits just south of the existing bridge in Portsmouth/Tiverton. The bridge, a critical transportation system l
Jan 1, 2015
-
Design Build of the New NY Bridge Foundations
By Leykam Chris J., Jacobs Scott. A.
"Construction of the New NY Bridge over the Hudson River 25 miles north of New York City is one of the largest civil infrastructure projects presently underway in the United States (formerly Tappan Ze
Jan 1, 2016
-
Steel H-Piles For A 11.7-Mile Long Rail Rapid Transit Project
By Jeongbok Seo
The Dulles Corridor Metrorail Project (DCMP) involves the design and construction of a 23.1-mile extension of the Washington Metropolitan Area Transit Authority (WMATA) rail system. The initial 11.7-m
Jan 1, 2010
-
Case Study: The Use Of Post Tensioned Piles For Wind Turbine Foundations
By Amr Sallam, Ahmad Mohamed, Mohamed Alrowaimi
Renewable energy, in the form of wind and solar, has emerged as main source of energy in the modern society. The wind industry has substantially grown over the last two decades to become a key player
-
Design and Construction of Permanent Sheet and Pipe Pile Basement Walls with the Press-in Piling Method
By Takefumi Takuma, Tsunenobu Nozaki, Masashi Nagano
Using sheet piles and pipe piles for permanent earth retaining is one of the most economical methods for constructing basement walls since they can also work as temporary shoring during construction.
Jan 1, 2019
-
The Use of DSM Columns to Control Heavy Haul Railway Embankment Stability
By Kim Chan, Bryn Thomas, Ben Dening
"Increased rail capacity is required into Kooragang Coal Terminal near Newcastle, NSW, Australia to relieve rail traffic congestion and improve management of train arrivals. An additional arrivals tra
Jan 1, 2015
-
Assessment of the Durability of Cementitious Barrier Materials
By Stephan A. Jefferis, Adrian H. Bath
"This paper draws together some themes on the durability of barrier systems, and particularly cementitious systems. For contaminated land and water retaining structures, durability can be poorly addre
Jan 1, 2016
-
Rehabilitation of an Existing Mechanically Stabilized Earth Wall Using Soil Nails
By Daniel A. Thome, Robert C. Janke
"Installation of permanent soil nails through distressed mechanically stabilized earth retaining walls is a cost effective and aesthetically pleasing solution when using the appropriate equipment and
Jan 1, 2005
-
Three-Dimensional (3D) Limit Equilibrium Method (LEM) Comparative Study of a Landslide Case Study Supported with Piles
By Terence Ma, Seok hyeon Chai, Jeff Lam, Thamer Yacoub, Brigid Cami, Sina Javankhoshdel
The Limit Equilibrium (LE) analysis of pile-supported geotechnical structures normally assumes a constant shear force for the pile instead of considering the non-linear capacity of the pile which is r
Sep 8, 2021
-
Bored Pile Construction Challenges in Highly Variable Limestone for a Supertall Building
By Seth K. Martin, Tony Nichlany, Alan R. Poeppel, Konstantinos Syngros
"This paper presents a case study on bored pile construction in challenging karst conditions below a supertall building in Kuala Lumpur. Innovative design and construction techniques helped keep the p
Jan 1, 2016
-
The Impact Geotechnical Data Management Systems May Have on Risk Allocation for Differing Site Conditions in Construction Contracts
By Steven M. Henderson, Zachary D. Jones
The risk of allocation in construction contracts is a primary concern for all parties. For contracts involving subsurface construction the allocation of site condition risk is critical. In the past on
Jan 1, 2017