Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Linear Friction Welding Of Ti-5AL-5V-5Mo-3Cr

    By X. Cao, J. J. Jonas, Wanjara. P., J. Gholipour, E. Dalgaard

    The linear friction welding (LFW) behaviour of near-ß titanium alloy Ti-5Al-5V-5Mo-3Cr (Ti- 5553) was investigated. Microhardness measurements were performed in order to evaluate the mechanical proper

    Jan 1, 2010

  • CIM
    Summary of industrial minerals in Saskatchewan

    By Paul Guliov

    Potash dominates the industrial mineral scene in Saskatchewan accounting for 44% of total provincial mineral production in 1981. More than 7 million tonnes of potash have been produced annualy in rece

    Jan 1, 1984

  • CIM
    Geotechnical Design Of The Roby Pit, Lac Des Iles Mine

    By David Stone

    North American Palladium is the owner/operator of the Lac des Iles mine located 115 km north of Thunder Bay, Ontario. The mine has produced an average of 65,000 ounces of palladium since 1994. Lac de

    May 1, 2001

  • CIM
    Improving the Energy Efficiency of Mine Fan Assemblages

    By E. De Souza

    Energy associated with ventilating an underground operation comprises a significant portion of a mine operation's base energy demand and is consequently responsible for a large percentage of the

    Aug 1, 2013

  • CIM
    Geology of the Trout Lake molybdenum deposit, B.C.

    By H. Craig Boyle, Craig H. B. Leitch

    "The Trout Lake stockwork molybdenum deposit is located in the Selkirk Mountains of British Columbia, 50 km southeast of Revelstoke. The property is being explored by a joint venture between Newmont E

    Jan 1, 1983

  • CIM
    A Comparison of Bubble Rise Velocity Profile of two Surfactants to Explain Gas Holdup Data

    By A. A. Rafiei, J. A. Finch

    A previous study comparing n-pentanol and the polyglycol Fl50 showed that the two reagents could give the same gas holdup but with different size bubbles. The finding implies that bubble rise velocity

    Jan 1, 2009

  • CIM
    Effect of Reheating Schedules on the Hot Working Behavior of Az31 Magnesium Alloy

    By L. Shang

    In conventional continuous hot rolling processes, metals are usually reheated to a temperature such that the workpiece will maintain appropriate hot working characteristics as it proceeds through the

    Jan 1, 2006

  • CIM
    Automated Shovel Tooth Wear Monitoring with Machine Vision

    By Matthew A. Baumann

    Tooth wear on mining shovels presents a challenge for productivity. A shovel with worn teeth suffers from increased digging forces, longer fill times, and an increased likelihood of lost or broken tee

    May 1, 2011

  • CIM
    Highland Valley Copper's in-pit crushing and conveying system

    By M. D. Scott

    "Highland Valley Copper recently installed a semi-mobile in-pit crushing and conveyor system designed to feed both the Bethlehem and Lornex concentrators with a feed averaging 120000 tonnes per day. T

    Jan 1, 1988

  • CIM
    The measurement of exhaust temperatures on operating underground diesel equipment

    By D. B. Stewart

    This paper reports on an investigation undertaken to determine the exhaust gas temperatures of operating underground mining equipment. The effectiveness of platinum catalytic purifiers is discussed. F

    Jan 1, 1979

  • CIM
    Development of a Technology to Process Antimonite Gold-Bearing Ore

    By S. V. Ulianov, A. Y. Senchenko, A. A. Shvets, A. V. Aksenov

    Development of an efficient technology to process complex ores containing gold and antimony as well as silver is described in the paper. The results from the testwork aimed at the valuables recovery b

    Jan 1, 2016

  • CIM
    Detour Lake: Discovery of a World-Class Gold Deposit in Ontario

    By R. Aubertin, G. Panneton, P. Donovan

    The Detour Lake gold project is located in northeastern Ontario, approximately 300 km northeast of Timmins, within the Abitibi greenstone belt in the northwestern portion of the Archean Superior Provi

    Jan 1, 2011

  • CIM
    The Dentonia Flotation Mill

    By W. Holdsworth

    The flotation mill of Dentonia Mines, Limited, at Greenwood, B.C., went into operation on April 20th, 1934, and by October 11th a total of 15,000 tons of ore had been treated. It is intended in this p

    Jan 1, 1935

  • CIM
    Designing of the Grinding and Classification Systems for Increasing the Concentrate Iron Grade in 4th Production Plant at Golgohar Mining and Industrial Company

    By Jamal Jafari, Abbas Sam

    "The concentration of the fourth production line at Golgohar includes 66% iron with Blaine number of 500 cm2/g. For pelletizing process, the feed iron grade should be greater than 68% with minimum Bla

    Jan 1, 2016

  • CIM
    Mechanical Properties of High Copper Containing Al-Cu-Si Cast Alloys at Elevated Temperature

    By S. Bozorgi, K. Anders

    "The automotive applications of heat treatable AlCu cast alloys are designed for performance at high temperature, which can be improved using specially alloying element as well as different heat treat

    Jan 1, 2018

  • CIM
    Grain Refinement of B206 Aluminum ? Copper Alloy

    By N. Dahata

    Earlier research has indicated that an addition of titanium master alloy to aluminum alloys, results in improved fillability, grain refinement and finer pores. B206 alloy differs from other alloys use

    Jan 1, 2007

  • CIM
    A Method of Determining Recoverable Iron in Mixed Magnetite-Hematite Orebodies

    By P. E. Cavanagh

    "The Davis tube test has been used for many years as a laboratory method for determining the magnetic iron re-coverable from a magnetite iron orebody. This paper de-scribes a method for determining th

    Jan 1, 1968

  • CIM
    Phase Relations and Activities of Arsenic and Antimony in the Cu-O-As and Cu-O-Sb SYSTEMS at 1523 K

    By L. Voisin, K. Yamaguchi, D. G. Mendoza, K. Ltagaki

    The behavior of arsenic and antimony in the Cu-0 system was thermodynamically investigated to understand their elimination during a blister-making stage in copper smelting. Firstly, the phase relation

    Jan 1, 2007

  • CIM
    Physiochemical Properties of Cryolite-Silica Melts

    By S Sokhanvaran

    Electrodeposition of silicon from a cryolite based electrolyte at a relatively low temperature (1000°C) is a promising approach to generate high purity silicon. In order to obtain fundamental data per

    Jan 1, 2011

  • CIM
    Preliminary Models for Basalt Evolution in the La Grande Greenstone Belt

    By B. Rivard, D. Francis

    A layered Archean magma chamber is exposed at the base of the Yasinski segment of the La Grande greenstone belt. This intrusive complex lies beneath a sequence of mafic volcanics and is underlain by g

    Jan 1, 1984