Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Narrow vein mine design at the Hoyle Pond mine

    By John G. Henning

    The Hoyle Pond underground mine is located in the Porcupine Gold Camp, 18 km east of downtown Timmins. Since the initiation of production in 1985, the operation has produced in excess of 1.9 million o

    Oct 1, 2004

  • CIM
    Subaqueous Deposition of Acid Generating Tailings into an Acidic Lake Environment: Pilot Column Test Results

    By Linda C. M. Elliot, Liangxue Liu

    "The deposition of tailings under water is considered to be one of the most environmentally promising and potentially cost effective methods to reduce or eliminate acid mine drainage from tailings. On

    Jan 1, 1997

  • CIM
    Replacement of Classification Screens with Cyclones in the McArthur River Uranium Mine Grinding Circuit

    By Ken Dyck, Chuck Edwards

    "Cameco's McArthur River is the world's largest high grade uranium mine. Production started in late 1999. Cameco carried out the engineering design and construction management for the McArthur River p

    Jan 1, 2004

  • CIM
    Geostatistical simulation of optimum mining elevations for nickel laterite deposits (b9d9907f-58af-4f31-a4f0-796631528f37)

    By J. A. McLennan, J. M. Ortiz

    Nickel laterite deposits are typically formed from tropically weathered mafic-to-ultramafic complexes. The resulting nickel concentration is found within soil horizons and is mineable with regular doz

    Jan 1, 2006

  • CIM
    Grinding Calculations Related to the Application of Large Rod and Ball Mills

    By C. A. Rowland Jr

    "I. INTRODUCTIONFred C. Bond's ""Third Theory of Comminution"" (1) was published in 1952. The mathematical statement of the Third Theory is the well-known Bond Formula:where W - Kw H per short tonWl -

    Jan 1, 1972

  • CIM
    The Evolution of Falcon Continuous Concentrators at Tantalum Mining Corporation of Canada

    By Claude Deveau

    "With ever decreasing feed grades, finer mineralogy and increased demand for product, it became obvious that a major step in equipment performance was required to reduce operating costs and increase p

    Jan 1, 2000

  • CIM
    Nevsun Resources NSU ? TSX & AMEX Mission: To build a mining company taking exploration discoveries into production

    TABAKOTO / SEGALA ? Annual gold production approximately 100,000 oz ? Debt free ? Unhedged ? Combined surface reserves 949,000 oz ? Combined 9 year life Tabakoto open pit reserve 568,000 oz (3.4

    May 1, 2006

  • CIM
    Comparing the Behaviour of Modeled Paste in 2D and 3D, using Both Simplified and Complex Stope Geometries

    By Ryan L. Veenstra

    This paper presents a modelling study of a cemented paste backfill in an underground stope. The model was developed to help provide a better understanding of what is happening in the stope during the

    Jun 1, 2012

  • CIM
    UNIFLOT SP129 - Copper Sulphide Collector

    By S. Auger, S. McDonald, K. Ward

    "This preliminary paper provides a summary of lab and mill flotation investigations into the copper collector at two Canadian operations. The orebodies illustrated in these studies both contain mainly

    Jan 1, 1992

  • CIM
    Towards a Worldwide Network of Education in Mineral Engineering

    By Hans de Ruiter

    "Delft University of Technology, RWTH Aachen, Helsinki University of Technology and Imperial College established the Federation of European Mineral Programs (FEMP) in 1999 as a legal body to coordinat

    Jan 1, 2004

  • CIM
    100 Years of Blowing Bubbles for Profit

    By Jan E. Nesset

    It is just over 100 years since the practice of blowing small bubbles into a mixture of ground ore and water revolutionized the mining industry, resulting in uneconomic deposits becoming highlyprofita

    Jan 1, 2009

  • CIM
    Stope Sequence Optimization for Narrow Vein, Long Term Mine Planning

    By André van Wageningen

    Long term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos

    Oct 1, 2004

  • CIM
    Tyrethane for Screening Fabrication

    By S. L. Aaroe

    "TYRETHANE PRODUCTSTyrethane® is the family brand name which has been adopted by The W. S. Tyler Company of Canada, Limited to identify its polyurethane products. Since we have been manufacturing Wove

    Jan 1, 1976

  • CIM
    Cyclone modelling: A review of present technology

    By L. R. Plitt, A. A. Turak, B. C. Flintoff

    "Since the publication of empirical cyclone models by Lynch and Rao in 1975 and by Plitt in 1976, the technical literature on this subject has consisted primarily of reports of applications, with only

    Jan 1, 1987

  • CIM
    Commissioning of a Brownfield CDS Plant: Victories and Pitfalls (48th Annual Canadian Mineral Processors Operators Conference)

    By N. Romani, R. Provost

    "Commissioning of a circulating dry scrubber (CDS) plant was recently completed at an existing facility in Québec, Canada. The CDS plant treats the sulphur dioxide off-gas emitted from rotary kilns i

    Jan 1, 2016

  • CIM
    In Situ Synchrotron Radiation Diffraction during Compression of a ZKQX Alloy

    By K. U. Kainer, A. Stark, D. Tolnai, M. Hehenberger, C. L. Mendis, N. Schell, N. Hort

    Samples of an as extruded Mg-6Zn-0.6Zr-0.4Ag-0.2-Ca (wt.%) alloy was compressed at room temperature and at 250°C. The in situ deformation tests were performed at the P07 (HEMS) beamline of PETRA III,

    Jan 1, 2014

  • CIM
    A Queuing Network Model for Shovel-Truck-Crusher Systems in Open-pit Mining

    By Jiwen Zhang

    Abstract Due to the blocking nature at the crusher station, straightforward application of queuing theory cannot give realistic results on the performance of a shovel-truck-crusher system. A new queu

    Oct 1, 2009

  • CIM
    A Queuing Network Model for Shovel-Truck-Crusher Systems in Open-pit Mining

    By Jiwen Zhang

    Due to the blocking nature at the crusher station, straightforward application of queuing theory cannot give realistic results on the performance of a shovel-truck-crusher system. A new queuing networ

    Oct 1, 2009

  • CIM
    The Pebble Copper-Gold-Molybdenum Porphyry, Alaska

    By John G. Payne

    The Pebble deposit contains three contiguous zones. In the Pebble West zone, granodiorite stocks intrude gently warped volcanosedimentary rocks that had been intruded by diorite sills and two felsic i

    May 1, 2006

  • CIM
    Flash Flotation Circuit Design Considerations

    "The first SkimAir flash flotation cell was installed in Outokumpu’s Hammaslahti Copper Concentrator in 1982 to prevent overgrinding of soft sulphides in the milling circuit. Since this first installa

    Jan 1, 2017