Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Numerical Analysis of the Rock Cutting Process Based on a Two-parameter Description of Tensile Strength using the Weibull Theory

    By M. Gimpel, R. Galler, T. Antretter, H. Kargl, R. Tichy, W. Ecker, M. J. Mikl-Resch, G. Pittino

    "A computational method based on a continuum-mechanical approach to simulate rock cutting is developed and evaluated. The aim is to obtain the local loading acting at the cutting pick during operation

    Jan 1, 2015

  • CIM
    Numerical Analysis of the Rock Cutting Process and the Loading of Cutting Tools

    By M. Gimpel, R. Galler, T. Antretter, H. Kargl, M. Mikl-Resch, R. Tichy, W. Ecker, G. Pittino

    "A computational method based on a continuum-mechanical approach to simulate rock cutting is developed and evaluated. The aim is to obtain the local loading acting at the cutting pick during operation

    Jan 1, 2015

  • CIM
    Insurability of Unknown Postclosure Liabilities

    By C. Kunze

    ABSTRACT Although closure sureties cover works that are carried out during the existence of a mining company, certain liabilities are not known when the surety is established and become apparent only

    Jan 1, 2013

  • CIM
    Maintenance Control at Algoma's Macleod Mine

    By C. A. Campbell

    "There has been a significant reduction in maintenance hours and improved performance by maintenance crews at the MacLeod mine since the introduction of a Maintenance Control system which includes the

    Jan 1, 1973

  • CIM
    Refractory Performance and Campaign Life Extension of the Reverberatory Furnace at HBMS in Flin Flon

    By J. M. Cooper

    The HBMS reverb furnace in Flin Flon was originally designed in the late 1920s. Throughout the decades campaign life has been increased due to operational practices, technological changes and brick qu

    Jan 1, 2007

  • CIM
    Current Status of the Pebble Creek (North Meager) Geothermal Project, Southwestern British Columbia

    By Mory Ghomshei

    Pebble Creek Geothermal Power project is associated with a massive recent volcanic eruption in Southwestern British Columbia Canada. Slim holes drilled to depths 1100 m in the prospect area, show very

    Aug 1, 2013

  • CIM
    The Operation of a 30kt/A Copper L-Sx-Ew Plantproject in the DR Congo

    By Wei Wang

    The SMCO copper plant is located in DR Congo, and was designed by China NERIN Engineering Co., Ltd. The process is a typical hydrometallurgical plant with Leach-SX-EW, with the project treating the ox

    Jan 1, 2014

  • CIM
    Geochemical Exploration for Uranium in the Grenville Province of Ontario

    By W. B. Coker

    A helicopter-mounted lake-sediment and lake-water survey was carried out over Grenville rooks in the Renfrew area (parts of Renfrew and Lanark counties) during four days of October, 1975. In the cours

    Jan 1, 1977

  • CIM
    Mechanochemical Processing of Enargite: From Arsenic Elimination to Nanocopper Production

    By A. Zorkovská, S. Castro, P. Baláž, Z. Bujnáková

    Enargite (Cu3AsS4) belongs among refractory copper minerals with very low hydrometallurgical extractability of copper. An application of enargite leaching in acid solutions leads to simultaneous disso

    Jan 1, 2012

  • CIM
    Research into a New Method to Define the ?Three Zones? Above a Thick Coal Seam Mines Byfull-Height Extraction

    By Zhiqiang Wang

    This paper mainly focuses on the method of ?three-zone? definition (a caving zone, a fissure zone and a curve subsidence zone) for full height cutting in a thick seam. Based on criteria of a caving zo

    Aug 1, 2013

  • CIM
    Recovery of Copper from Printed Circuit Boards Using Ammoniacal Alkaline Solution

    By M. Tanaka, T. Oishi, K. Koyama, S. Alam

    "A novel hydrometallurgical process for copper recovery from waste printed circuit boards has been proposed, which consists of selective leaching of copper metal as Cu(I) by Cu(II) in ammoniacal alkal

    Jan 1, 2012

  • CIM
    Research on Combined Green Depressants for Flotation Separation of Lead from Copper

    By Jianwen Yang, Yucai Zhou, Yanhong Dong, Daixiong Chen

    "The study of combined depressants for flotation separation of lead from copper has been carried out to solve the copper-lead separation problem. Test results show that the depressant of CMC (Carboxyl

    Jan 1, 2016

  • CIM
    Gravity Gold Concentration at Newmont Mining

    The process of gold recovery by gravity concentration is incorporated in the metal recovery flowsheet at seven Newmont Mining Corporation owned mining operations in Australia, North America and Africa

    Jan 1, 2011

  • CIM
    Designing lanterns for the efficient lighting of mine roadways—An experimental approach

    By N. C. Karmakar, Y. V. Rao, M. Aruna

    No one can properly work without sufficient light and this is especially so in mines where conditions are difficult. Artificial lighting is very important for the night shift to provide a safe and eff

    Jan 1, 2005

  • CIM
    And where are we going? Comminution, flotation and gravity separations

    By J. A. Finch

    In this paper, the author offers a personal view of what the next 30 years holds for mineral processing. Restating that mineral processing will remain a vibrant industry in raw material production, gr

    Jan 1, 1998

  • CIM
    Fracture Mechanics in the Design, Manufacture and Maintenance of Mining Equipment

    By H. W. Wevers

    Fatigue failure and accompanying brittle failure occurs frequently in heavy mining equipment. This paper discusses how fracture mechanics can be applied as a tool for crack control and crack managemen

    Jan 1, 1977

  • CIM
    Classifying Variability of Material Properties in Mine Waste Rock

    By N. A. Beier, R. Amos, Smith. L., C. Atherton, D. R. Barsi, D. Blowes, D. C. Sego

    "Waste rock is one of the most abundant materials at mine sites and must be properly characterized and managed to limit acid rock drainage and other harmful byproducts. An experimental waste rock pile

    Jan 1, 2019

  • CIM
    Principal developments in the automatic control of mineral processing systems

    By A. Galip Ulsoy

    This review paper is intended to provide, the mineral process engineer with an introduction to the concepts, terminology and practice of mineral process control. It also provides an extensive sampling

    Dec 1, 1981

  • CIM
    The Future of Environmental Regulation: Saskatchewan’s Move to Results-Based Regulation

    By K. M. Murphy, M. B. Wittrup

    ABSTRACT The Saskatchewan Ministry of Environment recognizes the importance of environmental protection as an important contributor to Saskatchewan’s economy, with the environmental performance of ind

    Jan 1, 2012

  • CIM
    Post-Pillar Design for Overhand Cut and Fill Mining in Moderate to High Stress Conditions – A Case Study

    By M. Yao, D. Thibodeau

    "Selective mining, such as post pillar cut and fill, is used in large, flat, irregularly shaped ore bodies where ground stability is to be maintained. This selective mining is used to open the stope t

    Jan 1, 2015