Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Wharf Reconstruction At Gasps Sandy Beach - HistoricPort Gaspé is located on the back side of Gaspé bay and is protected by a natural sand barrier with a length of 2,5 km, from which it got its name, Gaspé Sandy Beach (1). Since 1904 the Gaspé regi
Jan 1, 1987
-
Bearing Capacity Of Footings And Piles - A Delusion? - DFI Annual Meting, October 14-16,1999, Dearborn, Michigan - SummaryBy Bengt H. Fellenius
The bearing capacity equation?"the triple N formula"? is now about 50 years old. It was developed from theory of plastic resistance of metal to a cone being pressed into the surface of the metal, supe
Jan 1, 1999
-
Slurry Walls In Building Construction - Urban ConditionsBy Louis Donolo
New buildings in today's urban environment, especially in down-town areas, invariably involve the construction of multiple level basements. Used for parking, storage and commercial space, these u
Jan 1, 1987
-
The Use Of A Reverse Circulation Diaphragm Walling Technique To Form A Plastic Cut-Off Wall Around Sizewell B Power StationBy H. F. Cowie
Britain's first pressurised water reactor (PWR) Nuclear Power Station is now under construction at Sizewell on the Suffolk coast. A linear cut-off wall was proposed to ensure that the drawdown of
Jan 1, 1989
-
Wanapum Dam Repaired Using Post-Tensioning AnchorsBy Rick Deschamps, Brian Barkauskas, Aled Hughes, Abigail Stein
In central Washington, six miles south of the small town of Vantage, the flow of the Columbia River is harnessed by the Wanapum Dam which is part of the Priest Rapids Hydroelectric Project owned and o
Jan 1, 2018
-
The Synergy Between Theory And Practice In Geo-EngineeringBy Bas R. Hemmen
GeoBrain is a facility at GeoDelft with the purpose to provide society with all relevant geo-engineering knowledge and experience in a structured way. On the basis of the available knowledge and exper
Jan 1, 2006
-
Anchored Hollow Bar Tangent Pile System For UnderpinningBy Marco D. Boscardin, Benjamin H. MacKinney, Kenneth R. Allard, Kenneth A. Pidgeon, Adriane G. Boscardin
This paper presents a case history for a unique application of a system of vertical micropiles with horizontal soil nail bracing and shotcrete facing for underpinning. The system was used to support a
Oct 1, 2022
-
Capacity Of Piles And Settlement Of Pile FoundationsBy M. Mets
Pile foundations have been used in Estonia since the beginning of 1960's. To evaluate the capacity of piles nearly 2,500 pile tests and 1,800 pile loading tests Have been carried out. The pile fo
Jan 1, 2000
-
The Final Piece of the Puzzle: Re-Design Of Grouted Closures for a Dam Cutoff WallBy Daniel P. Stare, Lucian P. Spiteri, Christopher M. Hallahan, James C. Myers
Buckeye Lake Dam was substantially remediated between 2015 and 2018 as a result of unacceptable dam safety performance. A permanent seepage cutoff, consisting primarily of a soil mixed cutoff wall (SM
Jan 1, 2019
-
Mini-Piling And Soil Anchors ? IntroductionBy Martin C. Jones
This paper outlines the development of small diameter grouted piling, to deal with foundation problems in difficult soils conditions and in very restricted access areas. A number of applications are o
Jan 1, 1987
-
Design and Construction of the Summit Senior Care Facility into the Side of an Unstable California HillsideBy Patrick O. Shires, Harry W. Schnabel
With stable building sites becoming scarce in the greater San Francisco Bay Area, the new Summit Senior Care Facility is being built into the side of an unstable hillside adjacent to the San Ramon Reg
Jan 1, 2018
-
Stresses And Settlement In Soil Due To Axially Loaded Piles And Pile Group - Synopsis :By Virendra Singh
The load settlement behaviour of single pile or pile group may be obtained using computer based methods such as the finite or boundary element techniques. An alternative method of obtaining the vertic
Jan 1, 1996
-
A Theoretical Study Of Underpinning Of Rigid Circular Foundations By Piles ? SynopsisBy M. Makarchian
Existing buildings sometimes experience excessive settlement under their design loads, or due to increased foundation loading, if a change of building use is required. One of the oldest and widely num
Jan 1, 1996
-
Spring Constants of Belled Caissons for Seismic Retrofit of an Existing Critical Structure in a Seismically Active AreaBy David E. Albus, Ahmadreza Mortezaie, Bidjan Ghahreman
The structural evaluation of seismic performance of an existing hospital in Long Beach, California, required spring constants of foundation elements. The structure included support by deep foundation
Jan 1, 2018
-
Vertical And Lateral Load Tests On Driven And Cast-In-Place Piles ? SynopsisBy G. Price
The Building Research Establishment installed a base load cell in a driven cast-in-place pile prior to it being tested under vertical load. The monitored base loads were found to be significantly less
Jan 1, 2010
-
Test Pile Program Carrier Pier And South Wharf Naval Station Puget Sound Everett, WashingtonBy David G. Winter
The first test pile for the carrier pier and south wharf at NAVSTA Puget Sound was driven on December 27, 1989, and the final pile was tested on February 26, 1990. Implementation and modification of t
Jan 1, 1990
-
Diaphragm Walls And Barrettes For Top-Down Construction: A Project ReportBy Bjöm Böhle
Top-down construction (or cut and cover construction) is providing important advantages when comparing with conventional construction techniques for commercial developments with deep basements, underg
Jan 1, 2006
-
Longitudinal Splitting Of Precast Reinforced Concrete Piles During Driving ? SynopsisBy B. B. Broms
The high transverse tensile stresses that develop in precast concrete piles during driving have been investigated experimentally from pile load tests and theoretically using the finite element method
Jan 1, 2010
-
The Design And Formation Of Bored Displacement Piles - A United Kingdom PerspectiveBy David J. Baxter
Use of bored displacement piles has experienced significant growth in the UK piling market sector, largely due to their environmental advantages over other piling methods and through cost benefits. Bo
Jan 1, 2006
-
Numerical Modelling of a Deep Excavation Shoring for Replacement of Control Structure at a DamBy Lok M. Sharma, Deep K. Khatri, Bradfield. Brett
"A shored enclosure was required to access a control structure upstream below the dam of a deep lake. The shoring involves the interaction of the structure, soil, and water and the loads imposed inclu
Jan 1, 2017