Search Documents

  • AUSIMM
    Settling Pond Design and Performance - The Malvern Hills Coal Mine Experience

    By J F. Seale

    The design of the settling pond for the Malvern Hills opencast coal project was based on a primary requirement to control runoff and sediment generated from the immediate 6 ha mine catchment, which in

    Jan 1, 2004

  • SME
    Innovative Mining Systems For Low-Cost Production In Very Thick Alluvial Deposits

    By G. Goellner

    The thick alluvial sand and gravel deposits along the base of the San Gabriel mountain range in Southern California area have been mined for construction aggregates for over 100 years. Encroachment of

    Jan 1, 2004

  • NIOSH
    BOM Bureau of Mines Publications and Articles, 1992-1993

    By Compiled by Staff

    "INTRODUCTIONThe U.S. Bureau of Mines (USBM) was established in the public interest to conclude inquiries and scientific and technologic investigations on mining and the preparation, treatment, and ut

    Jan 1, 1994

  • AUSIMM
    A Case History of Geochemistry and Prospecting in North-West Queensland

    By Branagan D. F

    The geology of the area studied is briefly described, together with the prospecting methods used in the search for copper, lead, zinc and uranium ore bodies.Four prospects, Mt. Corella, Yanasinga, Law

    Jan 1, 1960

  • DFI
    Railroad Bridge Approach Embankment Settlement Mitigation

    By Moi Arzamendi, Jose Ramirez, Kenneth Kniss, Sunil Arora, James Gingery

    Construction of a new approach embankment for a railroad bridge over a river in Southern California required placing up to 12 ft of fill over soft to medium stiff silts and clays along an approximate

    Jan 1, 2018

  • NIOSH
    OFR-28-77 Evaluation Of Current Surface Coal Mining Overburden Handling Techniques And Reclamation Practices

    By Frank Cook

    In this two-year study, an evaluation of mining and reclamation practices at 159 randomly sampled surface coal mines in the United States was conducted. It is concluded that reclamation practices in m

    Jan 1, 1976

  • SME
    TBM Tunneling At The Ashlu Hydropower Project, Squamish, BC

    By Serge Moalli

    The Ashlu Creek Hydro-electric project, located north of Squamish, BC, at the confluence of Ashlu Creek and the Squamish River, comprises a 49 MW run-of-river project and features a 4.08 m diameter, 4

  • NIOSH
    RI 3779 Horizontal Drilling for Oil in Pennsylvania - A Preliminary Report

    By C. W. Elder

    "INTRODUCTION This report describes a method of horizontal drilling in an oil-producing formation underlying a 400-acre, approximately square plot of land in the Franklin Heavy oil field in Sugar Cree

    Sep 1, 1944

  • SME
    Diversity of Spontaneous Vegetation on Post-Industrial Sites - Importance in Reclamation Process

    By G. Wozniak, R. Rostanski, H. Pfanz, G. Aschan, E. Sierka

    "Industrial wasteland is a typical element of the landscape of all the industrialised regions in Europe. There are many examples from Poland as well as from other European countries that post-industri

    Jan 1, 2005

  • CIM
    Acid Recovery in the Steel and Metallurgical Industry Process Characteristics and Fuel Saving Options

    By F. Baerhold, S. Mitterecker

    "Acid recovery is an important process step in pickling and leaching processes. Pyrohydrolysis in spray roasters and fluidized beds is a well-established technology to recover hydrochloric acid, but t

    Jan 1, 2016

  • CIM
    Selecting the Correct Cyanide Destruction Process for Your Operation

    By R. Agius, A. Nacu

    "Adoption of the International Cyanide Management Code, regulatory requirements and community concerns have increased the need to implement suitable cyanide destruction processes at gold operations to

    Jan 1, 2017

  • SME
    Evaluation Of Materials And Technologies Used In Mine Shafts Reclamation In Former Uranium Ore Mines In Eastern Germany - Development Of A Technical Guideline

    By F. Schreiter

    The Ore Mountains in Germany have a history of more than 850 years of underground mining activity. This has created a situation where thousands of old mine shafts and adits are due for rehabilitation.

    Feb 27, 2013

  • CIM
    Copper prestrip to copper cyanide

    By S. N. Dixon

    "Maximizing the value of each tonne of processed ore is the goal for all operations. Cyanidation processing of gold-copper ores has been challenging since its first use in 1889. The current practice t

    Jan 1, 2017

  • DFI
    Soil Improvement Technique to Mitigate Extreme Settlements on Deep Compressible Deposits in the Bogota Valley

    By Roger A. Archabal, Omar A. Conte, Gustavo Langoni

    This international case study focuses on the rigorous geotechnical interaction and results of a soil improvement program utilized to mitigate consolidation settlements of over 1.5 m [5.0 ft]. The extr

    Jan 1, 2018

  • SME
    Microtunnels vs. EPB Risk-Based Selection

    By Michelle L. Ramos

    INTRODUCTION The Ballard Siphon was built in 1935 and consists of two 91.4 cm (36-inch) diameter wood-stave pipes. These pipes convey sewer flowsunder the Ship Canal from northwest Seattle and the Ba

  • AIME
    The Assay and Valuation of Gold-Bullion

    By Frederic P. Dewey

    THE Bureau of the Mint of the United States Treasury maintains 13 offices for the purchase of gold-bullion, and this paper describes an investigation to establish the reasonable differences in the ass

    Aug 1, 1909

  • NIOSH
    IC 8266 Review And Evaluation Of Silver-Production Techniques

    By C. H. Schack

    Extractive metallurgy techniques currently employed to recover silver from primary ores and secondary scrap were reviewed and evaluated to identify and delineate metallurgical problems whose resolutio

    Jan 1, 1965

  • CIM
    Spheroidization of a medium carbon HSLA fastener-grade steel

    By P. P. Sinha, D. N. Bhatia, B. R. Ghosh, R. K. Gupta

    Medium carbon, low alloy, high-strength steels containing Ni, Cr, and Mo are used for the fabrication of various types of high-strength fasteners required for launch vehicle structures. Cold heading p

    Jan 1, 2007

  • SME
    Floodplain Aggregate Mining In Western Oregon (2ca5f679-fd59-4011-96c0-926073fa7dc9)

    By E. F. Schnitzer, S. R. Mamoyac, P. J. Wampler

    During 1996 and 1997, Oregon experienced flooding on a scale not seen in many years. Some gravel pits located near rivers experienced erosion and, in several cases, breaches between the gravel pit an

    Jan 1, 1999

  • CIM
    Optimisation des systèmes pelles–camions en utilisant la théorie des files d’attente

    By D. Komljenovic, J. Paraszczak

    "This paper presents the use of queuing theory in truck fleet sizing in open pit mining operations. In the first part, a methodology is developed by which an optimal ratio between the size of shovels

    Jan 1, 2004