Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Errata - Performance Of A Large Diameter Drilled Pier

    By A. J. Partos

    Table 4, Page 311 Table 4 Experimental Parameters from Straight Line Interpretation of Mohr Failure Envelope [ ]

    Jan 1, 1991

  • DFI
    Innovative Non Encroaching Retaining Wall

    By Dino Kartofilis, Rick Deschamps, Giovanni (John) Bonita

    "Anew condominium complex in Arlington, Va., presented some formidable constraints. One was the requirement for a permanent retaining wall to support a 48.5-ft (15-m) cut and an existing 16- story bui

    Jan 1, 2009

  • DFI
    Mini-Pile Design and Construction Methods Change to Mitigate Soil Loss through Glacial Till (db8ff9fc-ef1a-44d4-9e2e-ad6c00fcf7e5)

    By Cassandra A. Wetzel

    "Rock socketed mini-piles are a desirable foundation alternative when design capacity is more than 40 tons and there is limited access. In this case history mini-piles were designed to support between

    Jan 1, 2017

  • DFI
    Secant Pile Top-Down Construction for a Drainage Channel in Puerto Rico: An OPA Finalist

    By Bill Shea, Gordon King

    "For a drainage channel built in San Juan, Puerto Rico, a value engineering (VE) proposal incorporating a secant pile top-down approach saved time and facilitated construction work on the larger flood

    Jan 1, 2012

  • DFI
    Foundation Construction Challenges At 100 11th Avenue In Manhattan - Osterberg Cell Load Test In Mica Schist

    By Cem Altuntas

    This paper is the second in a series of two describing the design and construction of a foundation for a major high-rise real estate development on the west side of Manhattan, N.Y. The foundation memb

    Jan 1, 2008

  • DFI
    Elimination of Environmental Footprint: LVCC Expansion - Foundation Installation

    By Zachary Q. Maassen

    Upon approval from the Las Vegas Convention and Visitors Authority (LVCVA), Turner/Martin Harris, A Joint Venture began construction on the estimated $860 million expansion for the Las Vegas Conventio

    Jan 1, 2019

  • DFI
    Concrete Piles Driven In A Coral Sand

    By L. D. Johnson

    12 groups of 12 precast prestressed (PCPS) piles were driven in the lagoon of Kwajalein Island to support a dry dock. Pre-construction investigation of the calcareous coral sands and static pile loeid

    Jan 1, 1993

  • DFI
    Cooperative Effort Overcomes Problems With Pier And Cofferdam Construction Caused By Rock Slope

    By Herbert F. ?Buck? Darling

    A bridge replacement project in Rochester, NY, encountered difficulties when it was determined that rock below one pier was sloping downward toward the river at an angle of 42 degrees versus anticipat

    Jan 1, 2013

  • DFI
    Structural Evaluation of Thermal Integrity Profile Results of Transmission Foundations

    By Ryan Weaver, Travis Coleman

    The drilled shafts that support transmission lines and substations have been increasingly subject to testing to assess the integrity of placed concrete. Cross-hole Sonic Logging (CSL) has been used, b

    Jan 1, 2019

  • DFI
    Deep-Sea Quay Wall for Offshore Wind Energy Terminal on Maasvlakte 2 Rotterdam – NL

    By Patrick van der Schaaf

    "During 2016, foundation piling works were completed to allow for the construction of a production and storage/handling terminal in Rotterdam. It is there that steel foundations will be produced for o

    Jan 1, 1900

  • DFI
    Quality Control of Production Pile Installations for US-90 Replacement Bridge Over St. Louis Bay

    By Kevin Kuhl

    With the destruction of the US-90 Bridge spanning St. Louis Bay by Hurricane Katrina, the State of Mississippi awarded its first major design-build contract in order to have a completed four-lane brid

    May 11, 2007

  • DFI
    The Use of Rigid Inclusions to Support Large Spans

    By Michael Shedlosky, Sonia Sorabella Swift, Nina Carney, David Tarasovic

    Rigid inclusions were used to support roadway fills and mechanically stabilized earth (MSE) walls for the South Capitol Street Corridor project. The first phase of this two-phase, nearly $1 billion pr

    Jan 1, 2019

  • DFI
    Determining Length Of Pile Foundation By Analyzing Response To Lateral Hammer Impact

    By Vivek Samu, Murthy Guddati

    A new method called Effective Dispersion Analysis of Reflections (EDAR) was recently developed to effectively analyze the dispersive waves generated from lateral impact to piles. This paper presents t

  • DFI
    Behavior of Instrumented Deep Anchored and Strutted Diaphragm Wall in Soft Rock

    By Amr Al Degwe, Walid Jaber

    "INTRODUCTIONNSCC International Ltd. carried out the enabling works and constructed the foundation system for the Emirates Pearl Tower and Bab El Qasr Hotel in Abu Dhabi. Emirates Pearl Tower is a joi

    Jan 1, 2017

  • DFI
    Geotechnical Monitoring Of Deep Shoring Adjacent To Train Infrastructure

    By Jakub Szary

    Excavation and shoring adjacent to the above-grade Gilmore train station and elevated guideway was undertaken in 2019. A perimeter secant pile cut-off wall was constructed to a depth 37 m (121 ft) bel

    Sep 1, 2022

  • DFI
    Case History: Comparison of CSL Results to Physical Observations

    By David S. Graham, Paul J. Axtell

    Crosshole Sonic Logging (CSL) non-destructive integrity testing identified anomalous readings near the base of a 6.5-foot diameter drilled shaft rock socket. The anomaly was confirmed to be a defect b

    Jan 1, 2019

  • DFI
    Data Management Guide Specification

    By Laurel E. Blackman

    The DFI Project Information Management Systems (PIMS) Committee cooperated with the US Army Corps of Engineers (USACE) to develop a specification for PIMS used on USACE projects. Once completed the Co

    Jan 1, 2021

  • DFI
    The Impact Geotechnical Data Management Systems May Have on Risk Allocation for Differing Site Conditions in Construction Contracts

    By Steven M. Henderson, Zachary D. Jones

    The risk of allocation in construction contracts is a primary concern for all parties. For contracts involving subsurface construction the allocation of site condition risk is critical. In the past on

    Jan 1, 2017

  • DFI
    Simplifying the Design of Laterally Loaded Piles for Waterfront Structures

    By Amanda R. Parry, Chris R. Pray

    Predicting and modeling the soil structure interaction of laterally loaded piles with significant unbraced lengths is one of the challenges faced in designing many waterfront structures. Designers of

    Sep 8, 2021

  • DFI
    Trench Cutter - The Multi Purpose Solution

    By Alexander Blatt, Franz-Werner Gerressen

    Power Point Presetation at DFI 2022

    Sep 1, 2022