Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Understanding Soils Reports - Presented At A Structural Engineers Association Of Northern California Continuing Education Seminar On Foundations/Excavations, March 1984
By Loring A. Wyllie
Preparation, understanding and use of soils reports must be a team effort to be fully effective. The soils engineer must know what is to be built and exactly where. The structural engineer and owner m
Jan 1, 1986
-
An Investigation of Grouted Pile Capacity Using Instrumented Pile Load Tests
By Hayel M. El-Naggar, Sherif A. Akl
Although grouted piles have been used for several decades since the idea was proposed in the 1970s, their design is mostly based on experience and unpublished proprietary methods. There is little rese
Jan 1, 2018
-
Piling Projects Constructed With Vinyl Polymer Support Fluid In Glasgow, Scotland
By Derek J. Lennon
Ground conditions in central Glasgow generally comprise loose granular deposits overlying stiffer soils. CFA piling would normally be preferred for urban sites in these ground conditions, but flightin
Jan 1, 2006
-
Use Of Helical Piles Set Into Soft Rock For 1500-Ton Screw Press Foundation
By David C. Kraft
A major manufacturer and user of machine tools had the need to install a screw press machine at its plant site with the following design load requirements: (1) Vertical Compression Live Load = 2000 ki
Jan 1, 2003
-
Monitoring Settlements Of A Vacuum Tower Atlas Refining Co., Shrevesport, La
By Antal Partos
ATLAS Processing Company Shrevesport, LA initiated a major plant expansion in 1980. SITE Engineers, Inc. provided engineering consultation regarding the foundation of the vacuum unit. Four test boring
Jan 1, 1992
-
Report On An Instrumented Continuous Flight Auger Test Pile At Ascot.
By Peter O. Wilkinson
Ascot Racecourse in the UK is a major international venue for horseracing. The racecourse is being redeveloped to provide entirely new public facilities. The development includes the construction of a
Jan 1, 2006
-
Use Of The Observational Method (Best Way Out) To Allow Driven Pile Installation In Chalk - Introduction:
By Paul Morrison
The paper describes the design process, trial testing and contract pile installation of 772 precast concrete piles at a site in Surrey, South East England. Recommendations on how to improve the desig
Jan 1, 2000
-
Case History Of The Support Of Excavation System At The Dulles Automated People Mover (DAPM) Tunnels And Stations
By Marlion T. McQuinn
This paper will discuss the design, construction, and performance of the support of excavation on the Dulles East and West Automated People Mover Tunnels and Station projects. The elements of the sys
Jan 1, 2006
-
Thornton Road, Listerhills, Bradford
By B. C. Slocombe
A large derelict inner city site was regenerated for use as a distribution warehouse. Difficult topography and soils conditions required the adoption of a combination of specialist geotechnical proces
Jan 1, 1989
-
Tied-Down Boat Section Construction
By Romano J. Micciche
One of the largest scale uses of a multiple, high-strength steel bar tiedown system is described. Tiedowns were installed to resist hydrostatic uplift forces acting on a section of the Interstate High
Jan 1, 1994
-
Video Inspection Of Rock Sockets For A Piling Project
By Ali Ameli
Design loads are limited for piles relying upon toe stresses in rock due to uncertainty about the rock quality over the whole pile diameter because of rock mass properties or construction effects. Th
Jan 1, 2006
-
Time Dependent Open-End Pipe Pile Capacity Assessment By Dynamic And Quasi-Static Methods
By Derrick D. Dasenbrock
Three piers of a new river bridge are supported on 1.067 m diameter open-end steel pipe piles. At time of drive, and after pile re-strikes, high-strain dynamic capacity values at plan tip elevations,
Jan 1, 2006
-
Auger-Cast Piles Founded In Compressible Bearing Stratum
By Alfred H. Brand
New York City contains extensive deep deposits of glacial lake varved silt and clay, often overlain by organic soil. An 18 story building was proposed for Manhattan's upper East Side in one such
Jan 1, 2003
-
Impact And Ramifications Of Setup For Pile Foundations
By Cory G. Rice
A significant portion of the piling industry has long felt relying on soil setup to gain the required capacity is a complexity that would rather not be dealt with. Instead, the pile are driven to the
Jan 1, 1992
-
Instrumentation Of Construction Vibrations
By Mark R. Svinkin
Construction vibrations may adversely affect surrounding buildings and their effects range from human discomfort and disturbance of sensitive devices to visible structural damage. There is no unique c
Jan 1, 2002
-
Driven Pile Foundation Design And Construction Genentech Hall - UCSF Mission Bay Campus
By Robert E. Fosse
Driven 14-inch-square concrete piles were used as the foundations of Genentech Hall at the new University of California, San Francisco Mission Bay Campus. The five-story, steel eccentrically-braced fr
Jan 1, 2002
-
Design And Construction Of The Sutong Bridge Foundations
By Robert B. Bittner
The Sutong Bridge across the lower Yangtze River in China will have, when completed, the longest span (1,088 m) and the highest towers (306 m) of any cable stayed span in the world. The foundations fo
Jan 1, 2005
-
Gallery Towers, Melbourne: Successful Approach To Difficult Piling Contract Management
By Mario Aiezza
This paper outlines the results of a relationship developed during the design and construction of the foundations for the Gallery Towers project in Melbourne. Both the builder and the piling contracto
Jan 1, 2002
-
Drilling And Dewatering In An Urban Environmentprivate - Project Description And Location
By Joel Moskowitz
In 1990, the United States General Services Administration (GSA) issued a contract for design and construction of a new federal court building in New York City. Mueser Rutledge Consulting Engineers (M
Jan 1, 1996
-
Capitol Area East End Complex Blocks 171 Through 174 Sacramento, California: A Case History Involving The Application Of APGD And APG Piling Methods ? Introduction
By Brian R. Zuckerman
The Capitol Area East End Complex is currently being constructed under contract with the State of California Department of General Services on two sites adjacent to the grounds of the California State
Jan 1, 2002