High Capacity Barrettes In A Region Of Old Underground Quarries
By F. Schlosser
The extension of Montparnasse Station in Paris required the construction of supports of very high unit capacity to support a particularly rigid super-structure. The majority of the site is characteriz
Jan 1, 1989
-
Site Management Towards Pile Execution At Qurashiya Bridge
By Emad W. Shublaq
Contractual site plans are implemented for executing pile foundations (5 x 5) at segmental concrete bridge. Project schedule demands have forced the contractor to find out the most economical procedur
Jan 1, 1992
-
LRFD Resistance Factors for Design of Driven Piles Using the Texas Cone Penetration (TCP) Test
By Rozbeh Moghaddam, William D. Lawson, Priyantha W. Jayawickrama, Hoyoung Seo, James G. Surles
"This study provides calibration of resistance factors (?) for design of driven piles to implement Load and Resistance Factor Design (LRFD) for bridge foundations using Texas Cone Penetration (TCP) Te
Jan 1, 2017
-
A New Method of Quality Control for Construction Joints in Diaphragm Walls
By Nikolaus Schneider
"Abstract: The combination of failure in joints of diaphragm walls and their exposure to water pressure may have far reaching effects ranging from water leakage to the risk of catastrophic loss of sta
Jan 1, 2014
-
Collaborative Alliances – A Sustainable Way Forward For Construction?
By Stefano Trevisani
Abstract The FIEC Sustainability Vision states that “risks should be identified and allocated in a fair manner across the project team from the early stages of the design phase. A partnering approach,
Jan 1, 2014
-
High Stress Pile Testing At Soldier Field
By Michael H. Wysockey
The load test program for the pile foundation at Soldier Field included static and dynamic load tests at four locations around the site. The dynamic tests were run with no knowledge of the static resu
Jan 1, 2002
-
Pile Design, Testing, And Installation For A Gated Dam ? Synopsis
By B. H. Moore
The opportunity to evaluate the pile design procedures used on a major project is an infrequent occurrence. It is even more infrequent that the project involves piles with significant tension and hori
Jan 1, 2010
-
-
Working Platforms In Geotechnical Jobs: Recommendations For Execution And Maintenance
By Gustavo Armijo
Slippery and unstable working platforms spoiled not only by natural weather conditions but also by the effects of the construction process (drilling mud, grout slurry) are among the main sources of ha
Jan 1, 2006
-
Resistance Factors For Lateral Design Of Drilled Shafts Supporting Sound Walls
By Ke Yang
Drilled shafts are widely used as foundation system for sound walls to resist lateral loads. The design method based on the ultimate lateral capacity, such as Broms method, is often used for sound wal
Jan 1, 2007
-
Use Of Non-Invasive Helical Foundations For Urban Forest Canopy Walk Way ? Atlanta Botanical Garden
By David C. Kraft
Helical piles and ground anchors were used to meet critical design and constructability requirements for an urban forest Canopy Walk at the Atlanta Botanical Garden, Atlanta, GA. The 12-foot wide ped
Jan 1, 2011
-
Non-Destructive Testing Of Drilled Shafts and CFA Piles – Current Practice and New Method
By George Piscsalko
"Quality control of drilled shafts and CFA piles is greatly dependent upon the practices of the site personnel. In many applications it is difficult or not possible to fully inspect the shaft prior to
Jan 1, 2014
-
Proof of Bearing Capacity of Anchors on the Example of Innovative Anchor Monitoring System
By Stephan Großwig, Karolina Nycz, Arne Kindler
"Commonly used anchor monitoring systems are mainly based on the use of anchor force meters. However, experience shows that the reliability of the display of force meters lowers over time. Other measu
Jan 1, 2017
-
Installation And Performance Of Interlocking Drilled Shaft And Tieback Shoring System - Summary
By Alec C. Bloem
A 55' deep excavation encompassing almost a city block in London, Ontario required a lateral earth retention system to provide both temporary excavation support and a permanent groundwater cut-of
Jan 1, 1991
-
Different Drilling Techniques in Challenging Geology at Seminole Hard Rock Hotel and Casino
By Michael Arnold, Jonathan Delgado
In 2017, Bauer Foundation Corp. (BFC) was awarded the contract to install the deep foundations for the new 17-story Hotel Tower and the Low Rise Casino Expansion at the Seminole Hard Rock Hotel and Ca
Jan 1, 2018
-
Design And Construction Of Tower Foundations For 345kV Youngheung Marine Transmission Line
By Suk han Jang
This paper describes the tower foundation design and construction experience for the 345kV Youngheung marine transmission line, which has been in commercial operation in Korea since July, 2004. This
Jan 1, 2007
-
Applicability of Wet Grab Sampling to Quality Assurance of Deep Mixing Method
By Masaki Kitazume
"Abstract The wet type and dry type of deep mixing methods have been developed and widely applied for on-land and marine constructions in Japan. The quality assurance (QA) of the methods has been usua
Jan 1, 2014
-
Design Mix Specifications of Plastic Concrete for Dam Cut-Off Diaphragm Walls
By B. Sivarama Sarma, Biswabikash Rout
"Seepage control has to be achieved with plastic concrete cut-off diaphragm walls in dam structures. Materials selected for construction of cut-off walls must be durable, impermeable and have stiffnes
Jan 1, 2017
-
FDOT Method of Independent Separation of Tip and Skin Capacities of Driven Concrete Pile with Embedded Sensors
By Sastry Putcha, Vamshi Vemula, Aneesh Goly, Kumar Allady
Current dynamic testing practice to obtain pile total capacity will not yield optimum capacity due to the strain incompatibility between the side and tip resistances during driving. Superposition of e
Jan 1, 2018
-
Simulation of Brittle Failure of Cement Treated Soil Using Smoothed Particle Hydrodynamics
By Tomohide Takeyama, Yuki Yoshida, Masaki Kitazume
"Abstract A series of centrifuge model tests was conducted to investigate the failure pattern and stability of cement treated clay ground having an unsupported vertical slope. The model ground was sub
Jan 1, 2014