Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    In-Situ Study On Improvement Of Soft Ground Using Stone Columns For Railway Embankment

    By Kishore Kumar B., Eswaran Prasad C R, Srini Naik B., Ramakrishna Raju N

    The authors through this paper intend to introduce the non-vibro technique of ground improvement by stone column, being used for the first time in India under the Western Dedicated freight Corridor in

    Nov 1, 2022

  • DFI
    Using Pile Reinforcement To Mitigate Multimodal Slope Failures: A 3D Lem Case Study

    By Javankhoshdel Yacoub

    Piles are often used to reinforce slopes as they increase the available restoring force when calculating the factor of safety against sliding. In this paper, a 3D model of a slope containing multiple

    Oct 1, 2022

  • DFI
    Emergency Stabilization to Maintain CN Rail Service

    By Rick Deschamps

    "Fountain Slide is located approximately 10 mi (16 km) northeast of Lillooet, British Columbia, Canada, within the Coastal Mountain Range, and has been locally active since the 1970s. The project site

    Jan 1, 2017

  • DFI
    Design and Construction of Nysted Offshore Wind Farm, Denmark

    By Jørn Thomsen, Christoffer Brodbaek

    "As governments increasingly accord high priority to sustainable energy, policymakers are finding that wind energy has a long track record as a proven alternative to conventional energy supply.Over th

    Jan 1, 2009

  • DFI
    Mooring Bridge Caissons During Construction Using Jetted-In Driven Plate Anchors

    By Osama A. Safaqah

    Driven plate anchors can be used to hold in place large bridge caissons during floating construction. Their small size and simple method of installation make them a very cost effective alternative to

    Jan 1, 2013

  • DFI
    Vertical Load Carrying Capacity Of Concrete Expanded Base Piles

    By Mustapha Zergoun

    This paper presents the results of load tests to assess the vertical load carrying capacity of concrete expanded base piles, or pressure injected footings, for various projects located near Vancouver,

    Jan 1, 2004

  • DFI
    Self Hardening Slurry Wall Installation By Hydromill At The Herbert Hoover Dike ? An Innovative Solution

    By Mario Mauro

    In 2007 the US Army Corps of Engineers classified the Herbert Hoover Dike in Florida as a Dam Safety Action Classification (DSAC) 1 dam, and started the implementation of one of the largest dam rehabi

  • DFI
    Deep Excavation with Well Point Dewatering in Soft Soil

    By Mihir B. Roy

    "Coal transported by rail for Thermal Power Plant in Haldia, West Bengal, India, was to be received and stored in Coal Complex comprising of Wagon Tippler, Track Hopper, Junction Houses and network of

    Jan 1, 2015

  • DFI
    Washington Avenue Tunnel Project: Fortifying Aging Underground Infrastructure

    By Andrew R. Klaetsch, Peter W. Deming

    "The Washington Avenue tunnel in Kingston, NY was completed in 1912 to convey combined storm water and sanitary sewage. Over a mile in length, the tunnel was driven almost entirely in bedrock, with th

    Jan 1, 2016

  • DFI
    Design Equations For Laterally Loaded Piles Embedded In Sand

    By T. G. Davies

    The paper presents design equations for singly laterally loaded piles embedded in sand. These equations were obtained from a comprehensive nonlinear analysis of free and fixed head piles subjected to

    Jan 1, 2010

  • DFI
    Case History: Drilled Shaft Foundation System in Cemented Soils, Las Vegas, Nevada

    By Rouzbeh Afsharhasani, Moses Karakouzian, Brandon Kluzniak

    "The Vegas High Roller is the centerpiece of a new development parcel adjacent to the Las Vegas Strip. At a height of 550 feet, the High Roller is currently the tallest observation wheel in the world.

    Jan 1, 2017

  • DFI
    Capitol Complex Phase 1 Expansion

    By Eric S. Lindquist, Charles A. Luxford

    The State of Texas recently adopted a master plan to expand the existing Capitol Complex in Austin. Phase 1 of this expansion will add two new State office buildings and five levels of underground par

  • DFI
    Removal of the Former San Francisco-Oakland Bay Bridge Foundation Caisson E3 by Mechanical Means and Explosives

    By Michael Gebman, Jack Gerwick

    "With the opening of the new San Francisco-Oakland Bay Bridge East Span, the former bridge and its caisson foundations are being demolished. Caisson foundations are in the path of a future shipping ch

    Jan 1, 2016

  • DFI
    “Value Engineering” — Four Case Histories

    By Maral Papazian Bedian

    "Case 2. 100th Street Bus Depot: Elimination of Deep Caissons in Favor of Spread FootingsThe PROJECTThe 100th Street Bus Depot is a new five-story bus terminal for the New York City Metropolitan Trans

    Jan 1, 2003

  • DFI
    Meadowlands Megaproject: 9,000 Piles and Counting

    By Ronald D. Boyer

    "Early in the design stage of Meadowlands Xanadu, the client’s project director informed me that “after construction, nobody is going to come to Xanadu to see the foundations.” My response was, “Well,

    Jan 1, 2009

  • DFI
    Large Diameter Auger Cast Piles At Audi Field, Dc United's New Soccer Stadium

    By Christophe H. Locussol

    D.C. United, the professional soccer team located in Washington, D.C., completed a 20,000 seat capacity stadium in July 2018 named Audi Field. The project initially considered a foundation system cons

  • DFI
    Tower Leg Foundation Assessments with Frequency Response and Impedance Profiling Techniques

    By Huw Williams

    "Power companies are always looking to increase the carrying capacity of existing transmission lines, and the preferred method is to string heavier capacity conductor lines. However this results in hi

    Jan 1, 2005

  • DFI
    Jet Grouting at the West Toronto Diamond Grade Separation Project

    By Jim Bruce, Naresh Gurpersaud

    "The West Toronto Diamond project, under construction since 2006 and due to be complete in 2015, is a rail-to-rail grade separation project in the heart of urban Toronto. Once complete, a depressed co

    Jan 1, 2017

  • DFI
    Seismic Stability Analysis of Seepage Control Measures for Levees in Central Valley, California

    By Zia Zafir

    "Levees in the central valley of California are primarily for flood control purposes and thus are subjected to infrequent hydraulic loading. The primary concern for these levees is their instability d

    Jan 1, 2016

  • DFI
    Effects of Installation Parameters of Drilled Displacement Piles on In Situ Stress Conditions in Stiff Clays

    By Alexander Scheuermann, Martin D. Larisch, David J. Williams

    "Drilled displacement piles (DDP) have been used around the world for decades as foundation elements for structures and embankments. Typically the pile toes are designed to penetrate into stiff or den

    Jan 1, 1900