Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Real Cost of Material Handling Problems – And How to Avoid ThemBy T. Holmes
Investigations reveal that the throughput difference between a perfect production day and the average is often on the order of 40%, and that bulk solids handling system deficiencies are the largest (>
Jan 1, 2019
-
Comparision of Two Sizes of FSFs in the Glogów Copper SmelterBy L. Garycki, P. Poks, R. Urbaniak, T. Gabka
In 2016 at Głogów Copper Smelter KGHM Polska Miedź S.A., after shutting down the shaft furnaces new FSF was launched. Currently, it is the only smelter with two direct to blister flash smelting furnac
Jan 1, 2019
-
Minage des zones étroites à la Mine BousquetBy Paul Gauthier
Aujourd?hui, avec un faible prix de l?or sur le marché, les opérateurs miniers doivent revoir leur façon de faire. La méthode de minage «Eureka» permet de réduire les coûts de production et d?accélére
Oct 1, 2001
-
Throughput and Recovery Improvements Following Commissioning of the Mount Milligan MineBy P. Miranda, K. Le, G. Maes, R. Peters
"The Mount Milligan Mine, owned by Thompson Creek Metals Company Inc. (TCM), started operations in September of 2013. It is located between the communities of Fort St. James and Mackenzie and is the f
Jan 1, 2015
-
Barrick Goldstrike Roaster Facility Engineering and Construction of the Goldstrike Roaster FacilityBy Ray Walton, Ron Colquhoun, Ken Thomas, Dwayne Fentie, Barney Burke
"The new Roasting Facility at Barrick’s Goldstrike Mine in Nevada, U.S.A. was developed to process 12,000 tons per day of refractory gold ore. The process consists of crushing, dry grinding, roasting,
Jan 1, 2001
-
Flotation of a Copper-Gold Oxide-Sulphide OreBy T. Chong, R. Pesalj, B. Marchant, Z. Nikic
"The Mount Polley copper/gold project is located in central British Columbia and is currently being developed by Imperial Metals Corporation. Extensive laboratory and pilot plant testing was required
Jan 1, 1991
-
Measurement of Ball Size Distribution in a 8 m x 5 m Primary Mill of Sarcheshmeh Copper MineBy M. Pourkani, M. Karga, Samid Banis, Andre Laplante, G. Langari-Zadeh
"The Sarcheshmeh mine processes 40,000 t/d of ore grading 0.9% Cu and 0.035% Mo. Grinding is effected in single stage ball mills using 80 mm forged steel balls, with an average consumption of 850 g/t.
Jan 1, 1999
-
The Premium Value Defined Growth Independent - Value Creation ? Return On Capital ? Low-Cost Producer ? Return On AssetsBy Phil Keele
Canadian Natural ??Business Approach Efficiency and Execution ?Drive to be the low cost producer ?Focus on exploitation ?Augment exploitation with strategic acquisitions ?Maintain Discipline and
May 1, 2010
-
Leaching Of Copper Flash Furnace Dusts with Weak Acid Bleed and Arsenic Precipitation as Scorodite and Arsenical JarositeBy A. Roca, G. Ríos, I. Ruíz, M. Cruells
Flash Smelting Furnace (FSF) hot dust-laden is cooled in a waste heat boiler (WHB) and then dedusted in electrostatic precipitators (ESP’s) before being treated, together with the Peirce Smith Convert
Jan 1, 2019
-
On Stream Analysis and Computer Process Control Selection at the Thompson Mill, Inco LimitedBy P. Chaddock
The Thompson Mill has a capacity of 15,000 T ID of ore and produces two grades of nickel concentrate, copper concentrate and occasionally graphite concentrate. Up to July of 1985 we processed two dist
Jan 1, 1987
-
Investigation of the deformation mechanism of underground excavations in salt and potash mines using in situ deformation measurementsBy S. Kwon, J. W. Wilson
"In salt and potash mines, the time-dependent deformation mechanism should be clearly understood based on in situ measurements to predict the performance of a mining design. In this study, in situ def
Jan 1, 2002
-
Base Metal Sulfide Mineralization in Lower Carboniferous Strata, Northwest IrelandBy J. M. Gregg, C. J. Persellin, I. D. Somerville, E. A. Atekwana, K. L. Shelton
"Zn-Pb sulfide mineralization at Abbeytown mine and Twigspark quarry comprise the only known car¬bonate-hosted base metal sulfide deposits in the Sligo syncline, northwest Ireland. Limestone sedimenta
Jan 1, 2009
-
Corrélation et mélange dans un système de production minièreBy Jorgen Elbrond, Noel Billette
"La connaissance du niveau de variation de I' alimentation d' une usine minéralurgique est essentielle pour estimer le taux de récupération dans un concentrateur. De plus, il est important d
Jan 1, 1984
-
Vanadium-bearing Magnetite from the Matagami and Chibougamau Mining Districts, Abitibi, Québec, CanadaBy Robert A. Gault, T. Scott Ercit, Mehmet F. Taner
"Abstract -Vanadium mineralization occurs in oxide-rich horizons within the layered gabbro zones of the upper parts of the Bell River Complex, Matagami, Québec and the Lac Doré Complex, Chibougamau, Q
Jan 1, 1998
-
Heavy Mineral Survey of the Syrian Beach Sands, South of Tartous: Their Nature, Distribution and PotentialBy Bassam Kattaa
"Abstract - A heavy mineral survey of beach and dune sands including geochemical analysis for trace elements was undertaken to evaluate the economic potential of the sands and to understand the nature
Jan 1, 2002
-
On-Line Mine ? A New Concept for Improving Mining Economy Through On-Line Mineral AnalysisBy Ilpo O. Auranen
Background: Mines of today are moving ever increasing tonnages of rock. The new ore bodies tend be of lower grade and located deeper in the earth?s crust. The industry?s focus to overcome this ?deep
Oct 1, 2009
-
New Technology Provides Expanded Mine Design OptionsBy Michael J. Kelly
IAMGOLD?s Westwood project is the site for the largest, by volume, bored vent raise in North America. When completed, it will be the fifth largest bored worldwide in a single pass. This paper will re
Oct 1, 2010
-
Robust image segmentation technique for rock fragmentation analysisBy G. K. Mann
Fragmentation analysis of blast or crushed rock material is a time-consuming and costly process. During the last two decades, the mining industry has been investigating image-based analysis systems as
Jan 1, 2006
-
In Situ Monitoring of Cemented Paste Backfill Pressure to Increase Backfilling EfficiencyBy M. W. Grabinsky, B. D. Thompson
ABSTRACT: Use of cemented paste backfill (CPB) offers economic and environmental advantages over other backfill methods. However, many operations have limited knowledge of how their CPB behaves in sit
Jan 1, 2011
-
Fugitive Dust Control at Porcupine Joint Venture – Dome MineBy John Folinsbee, Brian Danyliw, Tony Y. Chong
"Control of fugitive dust has become increasingly important in the mining industry both from a health and safety and environmental standpoint. Mining operations in particular have required improved fu
Jan 1, 2005