Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Risk-Cost-Benefit Analysis of Early Warning Technologies Impact for Wall Failure Risk Management in Surface MinesBy J Joy, A Bye, G V. Kizil
This paper presents an application of the newly developed risk-cost-benefit (RCB) framework to support risk management decisions for the selection of wall monitoring technologies at an open cut mine s
Sep 18, 2012
-
The Evolution of Diamond Drilling Practices at Olympic DamBy J Taylor, A Dubowik
To increase the efficiency and improve the quality of diamond drilling at Olympic Dam, mine geologists have adapted and modified common practices in order to overcome the challenges imposed by such a
Aug 18, 2014
-
New Methods for the Control of Autogenous Grinding CircuitBy Jamsa-Jouneia SL, Lahteenmaki S
Sophisticated control systems require sufficient and reliable information from the process to be controlled. At the Pyhasalmi concentrator two novel measurements, a particle size indicator (PSI) and
Jan 1, 1993
-
Optimisation of the Peak Gold Mine’s Processing Plant through Advanced Process ControlBy J Hartog, V Beehan, D Beeson
Treating an ore blend from five different deposits at Newgold’s Peak Gold Mine (PGM) has always been a challenge due to the inherent variability between each of the orebodies.Operating the processing
Sep 1, 2014
-
Case Study on the Remediation of a Remote Acid Mine Drainage Site in South Africa With Emphasis on Low Cost Measures and Cost Benefit AssessmentsBy N Swiegelaar
Loubert Witbank is a defunct coal mine situated near Ermelo in South Africa. Mining ceased in 1992, and within a short period acidic decant occurred, with a significant impact on the regional catchmen
Jan 1, 2003
-
Mine to Mill Reconciliation - Three Case StudiesBy J T. Carswell, N A. Schofield
Fluctuations in periodic reconciliations between the mine and the mill are an expected and common experience in mining and processing operations. These fluctuations are caused in part by errors in the
Nov 20, 2012
-
Developments in Mineral Processing TechnologyBy Greenhalgh L. P H
The opportunities offered by an increasingly volatile world invite the international consultant or engineering services contractor to broaden attitudes, diversify interests, expand capabilities, retai
Jan 1, 1993
-
Chinese Non-Ferrous MetalsDURING the four years, 1922, 1923, 1924, and 1925, China produced the following quantities of non-ferrous metals and ores: Antimony Products - 67,869 (long) tons. The production for 1925 was 20,869 to
Jan 1, 1927
-
Improvement of blast efficiency at Rio Tinto Borates and Lithium Mine in California, USABy J Furtney, W Fu, D Nutakor, A Brose
Rock blasting outcomes are often a shared responsibility of both the mine operations group and the mine geotechnical group. From an operational logistics and planning perspective, blasting concerns in
Jun 22, 2022
-
Discovery of the Johnston Range Gold Deposits by Reconnaisance Multi-Element Laterite GeochemistryBy Brigden J. F, Birrell
A regional geochemical exploration programme commenced in July 1983, based upon low-density sampling of lateritic duricrust over parts of the Yilgarn Block of Western Australia. This resulted in r
Jan 1, 1988
-
Extending Drill and Blast Limits - The Carpathia ExperienceMining the Carpathia orebody at the Ardlethan tin mine in the late 1970s involved an innovative approach to underground mining which stretched the limits of drilling and blasting techniques. Holes of
Jan 1, 2008
-
Development in Cut and Fill Mining at ISA MineBy Jansen N
Production from the narrow, high grade silver-lead-zinc orebodies below 15 level commenced in mid 1985.Geological, mining research and recent mining experience determined that a mechanised drill, fire
Jan 1, 1985
-
Improved forged grinding media performance with carbon content greater than 1.0%By R Bose, M Bovell, G Cheong
Grinding media is a major consumable in mineral processing and therefore decreasing costs associated with its consumption is regularly considered a key goal for the minerals processing industry. Grind
Aug 29, 2018
-
The Design, Installation and Commissioning of an Absorption Refrigeration System at Gwalia Gold Mine in Western AustraliaBy J deVries, A Broodryk, P Kyselica, K McLean
Gwalia gold mine is located close to the town of Leonora in the Goldfields region of Western Australia, some 830 km from Perth. The mine is wholly owned by St Barbara Ltd, an Australian Securities Exc
Aug 31, 2015
-
Support Appropriate for Dynamic Loading and Large Static Loading in Block Cave Mining OpeningsBy W D. Ortlepp
Seismicity associated with deep block cave mining operations in hard rock can give rise to dynamic loading of the mining openings. A description is given of the source and damage mechanisms associated
Jan 1, 2000
-
An Assessment Of Vehicles Used In Underground Trackles Mining Operations At Cobar Mines Pty. LtdBy Palmer W. T
The successful re-opening of the Cobar min- eral field was dependent upon the success- ful introduction of highly productive, low cost mining. Mechanised cut and fill stop- ing with incline access wa
Jan 1, 1973
-
Exclusion Zone Calculation for Underground Explosives StorageBy M B. Lovitt
At present there exist few engineering calculations and principles to determine exclusion zones for personnel in the vicinity of underground explosive storage areas. This paper is written to encourage
Mar 24, 2014
-
Improving the Reliability of Stream Diversion Designs in Mine Closure Plans Using a Morphological ToolBy S Tjerry, S Szylkarski, B Willis-Jones, I Dubinski
Achieving relinquishment of mining sites is becoming increasingly difficult, with a study by Byrne (2013) estimating that out of a set of 73 mining and metals sites around the world, less than ten per
Jun 28, 2016
-
Conversion of a Pelletising Induration Furnace from a Haematite to Magnetite FeedBy R Jones
OneSteel Whyalla’s grate-kiln-cooler pelletising plant was commissioned in 1968 processing haematite feed from the local South Middleback Ranges mining area. The existence of a magnetite resource bene
Jul 11, 2011
-
Developing a TSF design concept – experience helps but numbers don’t lieBy L D. Munro, S A. Jackson
This paper provides a logical approach to developing a TSF design concept through: • Identifying key properties of tailings and containment structures; • Reviewing underlying principles for effective
Jul 1, 2021