Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Calibrating a Caving Model for Sedimentary Deposits-estimation of Load Distribution between Gob and Abutment

    By Thierry Lavoie, Mark K. Larson

    "Engineers at the National Institute for Occupational Safety and Health (NIOSH) and Itasca Consulting Group, Inc., conducted a study to determine the procedure for calibrating a caving model implement

    Jan 1, 2016

  • SME-ICGCM
    Mistakes, Misconceptions, and Key Points Regarding Secondary Roof Support Systems (b87a5324-ac75-480a-90d7-e642733c14a4)

    By Thomas M. Barczak

    Roof support systems are necessary to provide stable mine openings and much research has been conducted to design a variety of roof support systems that will function in various manners to ensure that

    Jan 1, 2001

  • SME-ICGCM
    Geotechnical Challenges and Experiences of Working a Deep and Wide Longwall Face: A Case Study of Adriyala Longwall Project, SCCL

    By Gautam Benerjee, Veera Reddy Boothukuri, Bhattacharjee Ram Madhav, Panigrahi Durga Charan

    "India’s tryst with mechanized longwall coal mining started with the introduction of the first self-advancing powered support longwall (PSLW) face at Moonidih Colliery of Jharia Coalfield in 1978 and

    Jan 1, 2017

  • SME-ICGCM
    Evaluation of Seismic Potential in a Longwall Mine with Massive Sandstone Roof under Deep Overburden

    By Joe Wickline, Mark A. Van Dyke, Wen H. Su

    "Geological factors and mine design contribute to mining-induced seismic activity, and this is especially true in longwall mining. Massive rock units are a key cause of seismic activity due to catastr

    Jan 1, 2017

  • SME-ICGCM
    Design of Roof Bolt Based Breaker Line Support in a Mechanised Depillaring Panel

    By Sahendra Ram, Arnn Kr Singh, Dheeraj Kumar, Rajendra Singh

    "Inherent existence of different rooms (openings) along the extraction line in a depillaring panel provides an easy path for the goaf to encroach the working area. Each of these openings in a mechaniz

    Jan 1, 2016

  • SME-ICGCM
    Research on Coal and Gas Outburst Dynamic System

    By Chaojun Fan, Du Wenzhang, Sheng Li, Hong-Hong Shi

    "Coal and gas outburst is an extremely complex dynamic disaster in coal mine production process which will damage casualties, equipment facilities and disorder the ventilation system by suddenly eject

    Jan 1, 2016

  • SME-ICGCM
    Underground Longwall Mining with the Impact of Disturbed Areas by Abandoned Gateroads and Small Gobs

    By Enguang Zhu, Kangning Zhang, Yang Li

    "Due to the use of outdated mining technology or room and pillar mining process in small coal mines, the coal recovery ratio is only 10% - 25%. In many regions of China: the damage area caused by the

    Jan 1, 2016

  • SME-ICGCM
    Stress Environment of Entry Driven Along Gob-Side through Numerical Simulation Incorporating the Angle of Break

    By Pengfei Wang, Guorui Feng

    "The angle of break is the acute angle created by the coal seam bedding plane and caving line formed by roof strata movement after extraction of a longwall panel. It has a significant influence on str

    Jan 1, 2018

  • SME-ICGCM
    Optimization of Chain Pillars Design in Longwall Mining Method

    By Kazem Oraee, Mehran Gholincjad, Navid Hosseini

    "Chain coal pillars are pans of the structure of longwall mining system that play a significant role in the stability of the entries. With mechanization and developments in the various aspects of the

    Jan 1, 2010

  • SME-ICGCM
    Risk Analysis and Risk Ranking in Tunneling: A Case Study

    By Behdeen Oraee

    Constructing tunnels underground is generally described as a high-risk activity because conditions in the surrounding area tend to be unpredictable. This would and can create unique dangers in every s

    Jan 1, 2014

  • SME-ICGCM
    Shear Testing of 28 mm Hollow Strand "TG" Cable Bolt

    By Naj Aziz, Peter Craig

    "Double shearing tests were carried out on the 28 mm (1 in) hollow strand Jennmar TG cable bolt to gain a better understanding of the shearing behavior of the cable. The first test was limited to a 50

    Jan 1, 2010

  • SME-ICGCM
    Subsidence and Ground Deformation Prediction in North America-A Case Study and New Method Developments

    By Karsten Zimmermann, Peter Cain

    "To receive regulatory approval for a new coal mining operation in North America, extensive investigations of feasibility and potential environmental impacts, including ground deformations, are requir

    Jan 1, 2016

  • SME-ICGCM
    Study of the Backfill Confined Consolidation Law and Creep Constitutive Model under High Stress

    By Zhikai Wang, Wensheng Lyu, Peng Yang

    "To better understand the mechanical behavior of the compression deformation of backfill under high stresses corresponding to large depths, consolidation compression tests were performed for cemented

    Jan 1, 2017

  • SME-ICGCM
    Influence of Mine Layout, Mining Method, and Geology on Down?Dip Coal Barrier Performance at the Solar No. 7 Mine

    By Anthony T. Iannacchione

    The Solar No. 7 and Solar No. 10 mines were designed to prevent mine waters from directly discharging to the surface. In January of 2004, a discharge occurred as the Solar No. 7 mine was in its final

    Jan 1, 2013

  • SME-ICGCM
    Case Studies of Innovative Cable Bolt Technology

    By Ben Mirabile

    Over the past three decades, the U.S. coal mining industry has widely used cable supports to supplement traditional primary bolting systems, especially in difficult ground conditions. However, increas

    Jan 1, 2013

  • SME-ICGCM
    Simulation Test on Accumulation Laws of Paste-Like Slurry in Cavity Goaf of a Coal Mine

    By Boqiang Wu, Ganggang Xu, Xiaodong Wang, Hai Wang, Shibin Zhu

    "Using a paste-like slurry as a filling from the ground surface to the goaf, artificial pillars can be built in the cavity goaf to support the goaf roof to prevent roof collapse and ground subsidence.

    Jan 1, 2018

  • SME-ICGCM
    The Potential of Using Coal Washing Plant Waste As a Backfill in Room and Pillar Mines

    By Anthony (Sam) J. S. Spearing

    Backfilling using coal waste is not a novel means for waste disposal throughout the world; yet, backfilling using a high density (paste) backfill is relatively new, except in Germany and Poland. One o

    Jan 1, 2013

  • SME-ICGCM
    Development and Application of the TT Anti?Friction Washer for Use with Tensioned Roof Bolt Systems

    By Thomas A. Cook

    The effectiveness of tensioned roof bolt systems has been well researched and documented over the years (Stankus, 1990, 1991, 1997; Guo, 1997; Denton, 2000; Su, 2007). Higher and more consistent inst

    Jan 1, 2014

  • SME-ICGCM
    Cemented Coal Gangue-Fly Ash Backfill Technique

    By Baogui Yang, Jie Yang, Anthony Iannacchione

    "The cemented coal gangue-fly ash backfill technique (CGFB) has commonly been used to control subsidence damage caused by underground coal mining. This paper discusses the CGFB backfilling process use

    Jan 1, 2018

  • SME-ICGCM
    Gateroads Layout and Entry Support in a Western Longwall Coal Mine in China

    By WenFeng Li

    Comparing to the coal seams in Eastern China, the coal seams in Western China usually have better geological conditions. Therefore, changes in the conventional gateroads layout are required for the We

    Jan 1, 2013