Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    An Analytical Approach For Diagnosing and Solving Blasting Complaints

    By Douglas Rudenko

    Have you ever had a neighbor complain about a blast one day, but says the next day’s blast was better, even though the Peak Particle Velocity (PPV) increased? How about neighbors that complain about a

    Jan 1, 2000

  • ISEE
    Modeling of Dynamic Break in Underground Ring Blasting

    By Troy Williams, Chris Preston, Ian Lipchak

    "Underground blasting operations are challenging from the standpoint of the distribution of explosivesenergy representative of ring blasting. Energy from both shock and pressure regimes of commerciale

    Jan 1, 2016

  • ISEE
    Vibration Control Blasting for Low Stability Final Wall

    By Greg Wyartt

    In the Pilbara region of Western Australia, an iron ore mine is undertaking a high wall cut-back to improve stability and allow access to deeper ore deposits. Several sections of the wall have been cl

    Jan 1, 2018

  • ISEE
    Modeling Effect of Delay Scatter on Peak Particle Velocity of Blast Vibration Using a Multiple Seed Waveform Vibration Model

    By R Yang, M Lownds

    This paper reports studies showing the effects of delay scatter on the peak particle velocity (PPV) of blast vibration using a multiple seed wave (MSW) vibration model developed in recent years. The c

    Jan 1, 2011

  • ISEE
    CEE BEE ZERO TWO Construction to Destruction - A Case Study

    By Deepak Vidyarthi

    This paper deals with various measures adopted in protecting a conveyor duct (named after a Conveyor Belt that was numbered as ‘02’) housing a 1600 mm (63 inches) belt conveyor system in a large, heav

    Jan 1, 2008

  • ISEE
    Production Blasting with Electronic Delay Detonators at Peak Quarry

    By H G. Bosmare, G Bedser, C V. B Cunningham

    Peak Quany has achieved substantial improvements to its bottom lie by giving close attention to blasting practice, and in pr@icnlar by introducing electronic delay detonators for routine production bl

    Jan 1, 1998

  • ISEE
    Laser Profiling and Computer Aided Blast Design using the Criterion Survey System and Win-Profile Analysis Software (b3a04a88-253a-4339-a3ec-70b988aee07d)

    By Steve Colburn

    The CRITERION Survey Systems utilize both theodolite mounted and hand held reflectorless distance meters. These are eye safe, easy-to-use, and specifically designed to endure the harsh environments ch

    Jan 1, 1997

  • ISEE
    "Suppression of Dust Generation during Blast Demolition of ConcreteColumns"

    By Chulgi Suk, Hoon Park, Hyonsoo Kim, Hakman Kim, Sangho Cho

    Dust emission from blast demolition and other construction activities can be a nuisance; it is widely recognized that fine particles less than 10 µm in equivalent diameter (called PM10) may cause heal

    Jan 1, 2016

  • ISEE
    Using Explosive Risk Assessment Tools for Emergency Operations Planning

    By Dean Nichols, Matt Ortel

    Explosive accidents in the United States have brought increased attention to emergency operation plans (EOP) at all facilities that manufacture, transport, or store hazardous materials – particularly

    Jan 1, 2016

  • ISEE
    Improved Coal Extraction Using Signature Hole Analysis and Electronic Detonators at the Knight Mine

    By Stuart Brashear, Eddie Colburn

    The Birmingham Coal and Coke – Knight Mine is a single seam coal mine in central Alabama. As pit development progressed in 2013, concerns over increasing vibration levels resulted in modifications to

    Jan 1, 2015

  • ISEE
    Tunnel blast drill hole surveying – Benefits and Methodologies

    By G. Adderley, A. Wetherelt

    The problems of poor drilling in underground operations have been highlighted on many occasions. Incorrect collaring and poor angular deviation can all lead to an increased block size, dilution, over-

    Jan 1, 2009

  • ISEE
    Experience with the change from cartridged to bulk site sensitized emulsion products.

    By Peter Moser, G. Reihholf

    Holcim, one of the world's leading suppliers of cement, aggregates and concrete, has set up a few years ago a working group “Quarry” in order to optimize the performance of its central European quarry

    Jan 1, 2006

  • ISEE
    The Assessment of Environmental Impacts of Blasting During The Construction of A Metro Tunnel

    By Ali Kahriman, Abdulkadir Karadogan, Umit Ozer, Mehmet Aksoy, Kagan Ozdemir, Adiguzel Deniz

    This paper presents the results of ground vibration measurements induced by blasting during the construction of the Istanbul Kadiköy-Kartal metro tunnel which has been driven at a depth of approximate

    Jan 1, 2007

  • ISEE
    Measuring and Analysing Percussive Pulses to Extend Depth in Top-hole Percussion Drilling

    By Gary Cavanough, Stuart Addinell, Hector Parra

    Drilling deep, straight, accurate holes in hard rock to achieve efficient blasting is a challenge for the mining/quarrying industries with short holes normally drilled using “top hole hammer” (THH) an

    Jan 1, 2013

  • ISEE
    Determination of the Dynamic Uniaxial Tensile Strength of Laurentian Granite Using an Explosivesly-Impacted Hopkinson Pressure Bar

    By P D. Katsabanis

    The dynamic tensile strength of geomaterials is known to be highly dependent on the strain rate of the load applied. This is significant in applications where the material is subjected to shock waves

    Jan 1, 2010

  • ISEE
    Blasting Overhangs Close to a Vibration Sensitive Structure

    By R. Franfield

    This paper describes a situation that many drilling and blasting contractors have found themselves in – a client?s fear of the use of explosives. In the summer of 2007 Blasting Services Ltd was asked

    Jan 1, 2009

  • ISEE
    Vibration Spectral Mapping

    By Gordon M. Matheson, Douglas A. Anderson, David K. Miller

    "Traditionally, analysis of vibrations from blasting has been focused on peak particle velocity fordetermining the likelihood of both annoyance and damage. The US Bureau of Mines, in RI 8507,indicated

    Jan 1, 1997

  • ISEE
    Crater Blasting Techniques and Designs in Compacted Soils

    By Patrick D. McLaughlin

    Crater blasting techniques have had relatively little application in the surface mining industry. This is not surprising, considering the geometry required to efficiently use cratering. The more widel

    Jan 1, 1992

  • ISEE
    Need of an International Code on Explosives and ISEE Role in Developing it

    By Roberto Folchi, Hans Wallin

    Having so many norms and technical content of legislation to deal with is a problem that an explo-sives engineer has to face, especially when working at an international level. Each country has its ow

    Jan 1, 2015

  • ISEE
    Presplitting and Controlled Blasting Techniques

    The objective in control blasting is to reduce overbreak to control the final pit wall slope, shaft, drift, ditch, bench, etc. to the final planned excavation limit.

    Jan 1, 1990