Search Documents

  • AIME
    Design Of Permanent Block Stopping To Resist Strata Convergence

    By R. E. Ray, J. W. Stevenson, J. A. Berry

    Conventional concrete block plastered with a cementitious coating is the most common material used in the construction of permanent stoppings to direct airflow in underground mines in the US. All mine

    Jan 1, 1986

  • TMS
    Thermal Analysis of Curaua Fiber Reinforced Polyester Matrix Composites

    By Ailton da Silva Ferreira

    Thermoset polymers, like the polyester, become harder with increasing temperature owing to molecular crosslink formation, which is a thermal benefit for composite matrix applications. Natural lignocel

    Jan 1, 2010

  • SAIMM
    A Study Of Dissolution Of Dense Lime In Molten Slags Under Static Conditions

    By M. P. Brungs, S. Haji Amini

    Static dissolution of CaO into a CaO-SiO2-Al2O3slag and slags with additional fluxing agents (fluorspar, nepheline syenite and ilmenite) was studied. The slag was packed into dense CaO crucibles and h

    Jan 1, 2004

  • AUSIMM
    A Team Approach to Optimising a Mining Method - Bench Stoping in the Silver/Lead/Zinc Orebodies at Mount Isa

    By Jarc H

    The steeply dipping silver/lead/zinc orebodies at Mount Isa mine have been extracted most recently by a combination of cut-and-fill and open stoping methods. Bench stoping was first used at Mount Isa

    Jan 1, 1992

  • AUSIMM
    Design and Construction of the Yarra River Crossing

    By R Blair

    The Domain and Burnley Tunnels, which are major features of the Melbourne City Link Project, are MelbourneÆs first road tunnels. They are 1.6 km and 3.5 km in length respectively and are being constru

    Jan 1, 1999

  • SME-ICGCM
    Effect of Roof Convergence on Stability of Underground Mine Seal Subjected to Explosion loading - Numerical Approach

    By Rajagopala Reddy Kallu

    After the Sago and Darby No. 1 mine incidents, the new regulatory standards for the design of mine seals in underground coal mines of the United States require the mine seals to withstand higher explo

    Jan 1, 2007

  • SAIMM
    Challenges Associated With Further Development Of The Waterberg Coalfield

    By L. Jeffrey

    The Waterberg Coalfield has vast potential to become a significantmining and industrial centre in South Africa. Its future developmenthinges on a number of critical decisions that must be made jointly

    Jan 1, 2005

  • ISEE
    Blast Optimization of Hard Ores at Phu Kham Open Pit

    By Wayne Rogers, Kell Monro, Arthur Pacunana

    The Phu Kham Copper-Gold Operation (PKM) is a large-scale open pit mine located in northern Laos. It was developed and is operated by Phu Bia Mining Limited (PBM) a Lao-registered subsidiary company o

    Jan 1, 2018

  • NIOSH
    RI 8535 Treatment of Florida Surface Waters for Use in Phosphate Beneficiation

    By D. A. Stanley

    The Bureau of Mines conducted laboratory-scale experiments to determine whether or not surface waters with a high organic content could be purified sufficiently to be used to replace the natural high-

    Jan 1, 1981

  • AUSIMM
    Validation and Application of Filtration Theory to Plate and Frame Pressure Filtration - From Laboratory to Full Scale

    Validation and Application of Filtration Theory to Plate and Frame Pressure Filtration - From Laboratory to Full Scale

    Sep 13, 2010

  • DFI
    Amsterdam North South Line Metro - Construction Of Deep Diaphragm Walls For Three Underground Stations.

    By Theo. A. M. Salet

    The historic centre of one of the most beautiful cities in Northern Europe -Amsterdam - is being excavated to accommodate the new North/South metro line. This new line is due for completion in 2012, a

    Jan 1, 2006

  • DFI
    Settlement & Vibration Monitoring For Transmission Line Foundation Installation: A Case History

    By R. Heath Forbes

    The route of a new, 4-mile long, electrical transmission line passed through residential neighborhoods and commercial areas of a small town in the South Carolina Coastal Plain. The new line consisted

    Jan 1, 2011

  • SAIMM
    Finite Element Modelling Of Electric Currents In Ac Submerged Arc Furnaces

    By I. Mc Dougall

    Finite element models were generated of two submerged arc furnaces of different geometries. A 48MW circular furnace and a 68MW 6-in-line rectangular furnace were studied. The electrodes, raw material,

    Jan 1, 2007

  • AIME
    Secondary Recovery and Pressure Maintenance - Waterflood Calculations for Multiple Sets of Producing Wells

    By S. A. Hovanessian

    The method of characteristics which reduces the Buckley-Leverett mnlineur, partial differential equation to two first-order, linear differential equations is applied to the solution of a waterffood re

  • SME
    Nacimiento Lake Tap

    By Clay Haynes

    In 2005, Black & Veatch Corporation began designing a raw water conveyance system for San Luis Obispo County from Lake Nacimiento to the city of San Luis Obispo. The first element of the water transfe

    Jan 1, 2008

  • SME-ICGCM
    Geology, Ground Control, and Mine Planning at Bowie Resources, Paonia, CO

    By Collin Stewart

    Bowie Resources maintains one of the most pro-active ground control programs in the U.S. mining industry today. Its guiding philosophy is that everyone in the organization, from the miners at the fac

    Jan 1, 2006

  • SAIMM
    Reduction Kinetics Of Manganese Oxide From HC FeMn Slags

    By M. Tangstad, D. Lu, G. Tranell, S. Gaal, J. Safarian

    The kinetics of MnO reduction from high carbon ferromanganese slag was investigated using a sessile drop technique at 1600 ºC. The effects of reductant type, ambient atmosphere and slag composition on

    Jan 1, 2007

  • SAIMM
    Ferro Silicon Operation At IMFA ? A Critical Analysis

    By Dhananjaya Senapati, E. V. S. Uma Maheswar, C. R. Ray

    Carbothermic process of Ferro Silicon production is primarily a slag-less process. However, slag formation is observed in the regular operation as experienced by almost all the Ferro Silicon Producers

    Jan 1, 2007

  • AUSIMM
    Pilot-Scale Study of Deep Cone Thickener for Phosphatic Clay Dewatering

    Pilot-Scale Study of Deep Cone Thickener for Phosphatic Clay Dewatering

    Sep 13, 2010

  • CIM
    Mining strategy for the Retreat Zone at Noranda’s Bell-Allard mine

    By D. Ouellet, G. Gagnon, B. Simser, V. Falmagne

    The mining sequence at Noranda’s Bell- Allard mine calls for two mining fronts retreating toward a central pillar known as the Retreat Zone between pyramids A and C. It is clear from numerical modelli

    Jan 1, 2004