Search Documents

  • SME
    Horizontal Stress And Longwall Headgate Ground Control – Preprint 97-187

    By Thomas P. Mucho, Dennis Dolinar, Christopher Mark

    Horizontal stresses are caused by global plate tectonic forces. During 1995 alone, they were largely responsible for closing two U.S. longwall mines. This paper presents six case histories from Penns

    Feb 24, 1997

  • DFI
    Large Diameter Piles For Deep Foundation Of Orsang Aqueduct - Synopsis

    By A. B. Desai

    The construction of 1144 nos. of piles, each 1.5 m diameter, bored-cast-in-situ type and varying in depths from 6.5 to 23m, has been completed as foundation for 26 piers of 548 m long aqueduct across

    Jan 1, 1996

  • SME
    Carburization Effects On Pig Iron Nugget Making

    By B. Anameric, S. K. Kawatra, K. B. Rundman

    The iron nugget process is an economical, environmentally friendly, cokeless, single-step pig iron making process. Residence time dependent process requirements for production of pig iron nuggets at a

    Jan 1, 2005

  • AUSIMM
    Constraints and Advantages of the Crown Minerals Act and the Resource Management Act

    By A P. Brown

    Access arrangements required with landowners and occupiers; relaxation on size of permits; lack of confidentiality for information provided; one-stop shop under RMA, removal of standing; plethora of c

    Jan 1, 1997

  • NIOSH
    MLA 64-87 - Mineral Resources Of The South Boise Yuba Study Area And Additions, Blaine, Camas, And Elmore Counties, Idaho ? Summary

    By Francis E. Federspiel

    In 1984 and 1985, at the request of the U.S. Forest Service, the U.S. Bureau of Mines examined the 87,720-acre South Boise Yuba study area (formerly known as RARE II Wilderness Recommended area I-4553

    Jan 1, 1987

  • SME
    Bacís Flotation Cell For Gold- And Silver-Beard Pyrite Recovery

    By J. R. Parga

    In mineral processing, poor froth-flotation performance translates into both an enormous loss of revenue and an unnecessary waste of the ore reserve. In this context, Bacís Mining Company developed a

    Jan 1, 2009

  • ISEE
    What We Learned While Determining VOD’s in Underground Small Hole Blasting

    By Scott Rosenthal, Kyle Murphy

    This paper discusses the trials and tribulations of obtaining Velocity of Detonation (VOD) readings in small diameter blast holes in an underground mine. Montana Technological University (Montana Tech

  • SME-ICGCM
    Coal Pillar Design Formulae Review and Analysis

    By Xinzhi Du

    Coal strength is essential to analyze the stability of excavation in coal. It is well known that the strength of coal tested in the laboratory is size-dependent, and different size specimens will prod

    Jan 1, 2008

  • SME
    The Status Of Gold And Silver Leaching Operations In The United States

    By Michael G. Pojar, Peter G. Chamberlain

    Solution mining, primarily by heap leaching, has emerged as an important method for mining gold and silver in the United States. Heap leaching offers many economic and environmental advantages over co

    Jan 1, 1981

  • RMCMI
    Invitation to 1983 RMCMI Meeting

    President Vernal Mortensen, on behalf of 'The RMCMl officers and Executive Board, invites you and your family to attend The 79th Regular Meeting of The Rocky Mountain Coal Mining Institute to

    Jan 1, 1982

  • AUSIMM
    Human Resources Management at Grey River Gold Mining Limited

    Grey River Gold Mining Limited (GRGML) has constructed and largely completed the commissioning of an alluvial gold dredge designed to recover gold from a low grade gold deposit in the Grey River Valle

    Jan 1, 1989

  • SME-ICGCM
    Optimizing Pillar Design In A Multi-Seam Environment

    By R. Kanniganti

    The primary problems of pillar design in seams subject to interaction are due not only to difficulties in predicting loading, but also to the often unsymmetrical nature of the stress fields. The effec

    Jan 1, 1995

  • IOM3
    Regional geochemical mapping of Pt, Pd and Au over an obducted ophiolite complex, Shetland Islands, northern Scotland

    By D. M. A. Flight, G. E. M Hall, P. R. Simpson

    theoretical viewpoints.

    Apr 1, 1994

  • SAIMM
    The Influence Of The Quality Of Ferrosilicon On The Rheology Of Dense Medium And The Ability To Reach Higher Densities - Introduction

    By H A. Myburgh

    The beneficiation of heavy metal oxides, such as iron ore, is usually performed with heavy medium separation in cyclones, static baths and lately with Larcodems. Atomized ferrosilicon is most suitable

    Jan 1, 2006

  • SAIMM
    Charcoal For Manganese Alloy Production

    By M. Tangstad, B. Monsen, H. Midtgaard, R. Ishak, M. Syvertsen, I. Solheim

    Charcoal is an interesting reducing agent because it is produced from growing wood which is renewable and does not contribute to global warming, provided that there is a balance between the felling of

    Jan 1, 2007

  • CIM
    Chrome Grinding Balls at Campbell Mine

    By Bill Shand

    "Placer Dome - Campbell Mine is a gold mine located at Balmertown in the Red Lake District of North Western Ontario. During the last 50 years, the mine has produced over ten million ounces of gold.A c

    Jan 1, 2001

  • NIOSH
    RI 9447 - Estimation of Shear Strength Using Fractals as a Measure of Rock Fracture Roughness

    By J. C. Kerkering, S. M. Miller, P. C. McWilliams

    Researchers at the U.S. Bureau of Mines investigated the use of close-range photogrammetry and subsequent stereo digitizing to obtain data from rock fracture roughness profiles. The photogrammetric pr

    Jan 1, 1993

  • AUSIMM
    Determination of the handleability index of adhesive bulk materials

    By M Carr, K Williams, W Chen, J Plinke

    The depletion of iron ore deposits at the face of the mine site dictates the necessity for the exploitation of formerly less attractive orebodies to meet the demand of the modern world. These orebodie

    Jul 24, 2017

  • CIM
    On-Line Material Balance Calculation for Mass Flow Rate Estimation and Flotation Process Diagnosis an Application to Copper-Flotation Circuit at East-Malartic Plant

    By Dany Pelletier, Yeves Breau, Ahmed Bouajila, Claude Gagnon

    "In flotation circuits, direct measurement of the volumetric flow rate delivered by electromagnetic flowmeters is often difficult to obtain particularly due to piping and flow constraints. However, on

    Jan 1, 2000

  • CIM
    A Benchmarking Tool for Assessing Flotation Cell Performance

    By Jan E. Nesset, James A. Finch, Wei Zhang

    "Bubbles are unquestionably the heart of the flotation process. Their size and combined surface area are largely what drive the recovery process. This suggests that plant engineers should be aware of

    Jan 1, 2012