Search Documents

  • AUSIMM
    Removing the Overburden? Proposals to Amend the Resource Management Act 1991

    By M Cooper

    Since its enactment in 1991, the Resource Management Act (RMA) has generated both praise and criticism. The major criticism is in relation to the costs the Act poses to industry and the time it takes

    Jan 1, 1998

  • SME
    Extraction and Separation of Zirconium Using 1-Octanol Mining, Metallurgy and Exploration) (58a7adb7-21cd-47cb-bca7-f6dd6d33ac42)

    By P. L. Crouse, S. J. Lubbe, M. J. Kabangu

    A selective extraction and separation of zirconium by solvent extraction with 1-octanol is proposed. The process is based on the dissolution of the metal basic carbonates in hydrochloric acid in the p

  • SAIMM
    The Development Of A Remote-Controlled Highwall Rockbroom?A World First For The Open-Pit Mining Industry ? Synopsis

    By D. van Rensburg

    Jointed rock slopes are generally stable, as there is no freedom of movement for blocks of rock. In an open- pit mining environment, blasting opens up space into which blocks of rock can fail, resulti

    Jan 1, 2012

  • DFI
    Case History: Foundations For The New Mississippi River Bridge, St. Louis

    By Paul J. Axtell

    This case history describes the foundation design and construction for the New Mississippi River Bridge, presently under construction in St. Louis, Missouri. The 1,500 ft (457.2 m) main span of the c

    Jan 1, 2011

  • AUSIMM
    Further Notes on Underground Mine Fire Prevention at the South Mine, Broken Hill

    CONTENTS.IntroductionAcknowledgementsDescription of MineVentilation of MineOrganisation of Fire Fighting SquadsTraining of Fire Fighting SquadsRescue WorkFire Fighting and Rescue EquipmentFire AlarmsC

    Jan 1, 1946

  • CIM
    Introduction of and Experience Gained With Cemented Hydraulic Fill at the Gossan Hill Mine, Western Australia (5fc42dae-6b1c-469d-926f-1a8ca2654f54)

    On the 26th of June 2000 a hydraulic fill retaining barricade failed at the Bronzewing mine in Western Australia. The barricade failure resulted in the release of 19,000 m3 of saturated hydraulic fil

    May 1, 2007

  • CIM
    Post-Early Cretaceous Mississippi Valley-type Zn-Pb Mineralization in the Bongara Area, Northern Peru: Fluid Evolution and Paleo Flow from Fluid Inclusion Evidence

    By N. I. Basuki, E. T. C. Spooner

    "The Bongara area, northern Peru, contains Zn-Pb mineralization with characteristics typical of Mississippi Valley-type (MVT) systems. The northwest-southeast-trending late Triassic-Jurassic car¬bonat

    Jan 1, 2009

  • AUSIMM
    The Ministry of Commerce Investigation into the Proposed North West South Island National Park - An Overview

    The Ministry of Commerce has been carrying out an evaluation of the resources of the Northwest Nelson region. In part this was to revisit the issues covered in the earlier proposal to close part of No

    Jan 1, 1993

  • CIM
    Gold-copper ores processing / flotation process optimization by the development of an on-line expert system

    By Yves Breau, François Robichaud, Jacques McMullen, Pierre Pelletie

    "The Expert System implemented at the East-Malartic mill controls a copper flotation circuit while taking into account the profitability of the operation. Treating a copper gold ore, the flow sheet in

    Jan 1, 2002

  • SME
    Case Study: Correcting Mechanical And Control Problems On Essroc?s Multi-Drive Station Horizontally Curved Conveyor ? Introduction

    By A. Jennings

    [ ] In November 2005, Essroc Cement, part of the Italcementi Group, commissioned a long overland conveyor at their Nazareth plant in Pennsylvania. This conveyor, tagged CV-105, was designed to tran

    Jan 1, 2012

  • AUSIMM
    Tapping Water by Diamond Drill Holes

    ON mineral lease 38 of the Sulphide Corporation Limited, Broken Hill, a shaft was sunk in the early days Ior prospecting purposes and at the present time it is accessible as far as the 1000-ft. level

    Jan 1, 1919

  • CIM
    Requirements for Underground Mine Backfill Monitoring

    By David O. DeGagné

    While mine backfill plants are becoming increasingly more automated and instrumented, especially with paste fill operations, underground backfill distribution systems have hardly changed over the year

    May 1, 2001

  • AUSIMM
    Core Recovery Devices Used In South Australian Drilling Practice

    Recent developments in diamond drilling practice have been chiefly 'concerned with modifications in drill design and 'operating technique whereby an increase in daily footage rates and reduc

    Jan 1, 1943

  • AUSIMM
    Lessons Learnt and Performance – Installing and Commissioning an Ausenco Carbon Reactivation Kiln in Africa

    By D Preedy, J K. Claflin, S R. La Brooy

    A gold mine in north-eastern Africa has expanded throughput from 5 to 10 Mt/y in recent years. The original carbon regeneration kiln was incapable of achieving required throughput or meeting process c

    Sep 7, 2015

  • TMS
    Manufacture of High Nitrogen Austenitic Stainless Steels by Pressurized Electroslag Remelting

    By Zhouhua Jinag

    The attempt has been made to manufacture high nitrogen austenitic stainless steels by pressurized electro-slag remelting furnace with maximum nitrogen pressure of 7MPa. To obtain high nitrogen content

    Jan 1, 2009

  • AIME
    Analysis of the Cold-rolling Texture of Iron

    By Charles S. Barrett

    NUMEROUS determinations1-7 of the tex-ture of cold-rolled polycrystalline iron, steel, and ferritic alloys have been made with good agreement among the various observers as to the principal features o

    Jan 1, 1940

  • SME
    The Development Of Ultra Fine Grinding At KCGM

    In February 2001, Kalgoorlie Consolidated Gold Mines (KCGM) commissioned its first full-scale ultra fine grinding (UFG) plant to supplement existing roaster concentrate treatment capacity. This proces

    Jan 1, 2002

  • AUSIMM
    An Application of Trend Surface Analysis to the Preparation of Cover Isopach Maps for Coal Seams

    Conventional hand drawn isopach maps of the cover of the Bulli Seam are too eomplex for use in the delineation of large domains of similar cover. Isopach maps prepared from trend surfaces fitted to th

    Jan 1, 1968

  • NIOSH
    RI 8275 Instrument To Measure the Initial Deformation of Rock Around Underground Openings

    By Michael J. Beus

    This Bureau of Mines report describes a tunnel stress relaxation gage (TSR) developed to measure initial radial displacement around full-sized underground openings. The TSR technique was shown to b

    Jan 1, 1978

  • DFI
    Izmit Bay Bridge Crossing: Integrated Multidisciplinary Approach Reduces Risk And Lowers Overall Project Cost For Bot Bridge Consortium

    By Jacob Chacko

    The Izmit Bay bridge, a 3-km-long suspension bridge crossing of Izmit Bay, Turkey is planned to be constructed in one of the most seismically active places in the world. The site, which has the poten

    Jan 1, 2011