Search Documents

  • AUSIMM
    Presidential Address, 1956

    Before presenting this address I desire to express my appreciation of the honour which has been conferred on me by my election as iPresident of The Australasian Institute of Mining and Metallurgy. At

    Jan 1, 1956

  • AUSIMM
    Paper No. 169. The Training of a Mining Engineer.

    A GREAT deal of attention has lately been given to the discussion as to the education required for engineers, and especially for mining engineers. The Institute of Civil Engineers has had a committee&

    Jan 1, 1909

  • AUSIMM
    Flotation of Lithium and Beryllium Pegmatites (427a6d82-fb39-4583-b35b-3c6431d40947)

    By Moskovits E. E

    Spodumene was recovered from pegmatite by flotation in laboratory and pilot-plant tests using an anionic collector emulsion. A similar process applied to beryl pegmatite gave encouraging results.INTRO

    Jan 1, 1963

  • NIOSH
    IC 8877 SIC-Based Demand Information System For Nonfuel Minerals

    By George K. Schenck

    This Bureau of Mines publication describes and evaluates a Standard Industrial Classification (SIC) based end-use data system for minerals that is designed to link the demand for minerals to economic

    Jan 1, 1982

  • AUSIMM
    Manganese and Iron in Broken Hill Sphalerite

    Individual specimens of sphalerite from the Broken Hill lode vary considerably in manganese and iron contents, even within the same orebody, so that study of the overall variation of manganese and iro

    Jan 1, 1956

  • SME
    Pilot Plant Demonstration Of The Platsol® Process For The Treatment Of The Northmet Copper-Nickel - PGM Deposit (2b88692d-3bac-4547-86c3-f3ee9071956d)

    PolyMet Mining is developing the NorthMet property near Duluth, Minnesota. Laboratory investigations had led to the development of the PLATSOL process to dissolve in one step the base metals (copper

    Jan 1, 2001

  • CIM
    Throughput and Recovery Improvements Following Commissioning of the Mount Milligan Mine

    By P. Miranda, K. Le, G. Maes, R. Peters

    "The Mount Milligan Mine, owned by Thompson Creek Metals Company Inc. (TCM), started operations in September of 2013. It is located between the communities of Fort St. James and Mackenzie and is the f

    Jan 1, 2015

  • IIMP
    Utilización del Programa GoldSim para aplicaciones de planeamiento estratégico

    By Siegfried Arce

    Existen muchas herramientas para la gestión de proyectos. Sin embargo, éstos no están en capacidad de realizar análisis de riesgos y evaluar alternativas que consideren incertidumbre. En ese sentido,

    Aug 25, 2002

  • AUSIMM
    Pneumatic Stowing of Mill Residues in Underground Stopes, Broken Hill South Limited

    Two of the problems long associated with the complete extraction of level pillars in the wide ore bodies of Broken Hill have been: (1) The high cost of maintaining level gangways through areas of slow

    Jan 1, 1941

  • AUSIMM
    The Breakdown of Shales in Water

    By Whitmore R. L

    The action of water on a number of Queensland shales which are associated with particular coal measures and oil shales has been studied. The results suggest that the disintegration of some of the shal

    Jan 1, 1982

  • AUSIMM
    Stope Filling with Thickened Classified Flotation Tailings

    By Yates C, Gillie E. W, Finucane K. J

    During the year 1940 a complete investigation was made of the whole of the stoping operations throughout the Great Boulder Mine and, as a result, it was decided to convert some of the existing shrinka

    Jan 1, 1945

  • SME-ICGCM
    The Back Pressures Associated With Resin Rock Bolt Installations And Methods To Control And Predict It (1a0250a7-1c1e-4686-8a66-dbfc2dd6e095)

    By Anthony S. Spearing

    The vast majority of the estimated 100 million rock anchors installed in mines in the USA per year use resin cartridges (Tadolini and Mazzoni, 2006). About 4.5 million per annum of these are bolts wi

    Jan 1, 2009

  • AUSIMM
    The Code of Practice for Risk Management of Tunnel Works - Future Tunnelling Insurance from the InsurerÆs Point of View

    The objectives of this paper are to introduce the International Code of Practice for Risk Management of Tunnel Works and to illustrate to the participants of the 13th Australian Tunnelling Conference

    Jan 1, 2008

  • CIM
    Project Execution & Cost Escalation in the Mining Industry

    By John A. Wells, Leticia Conca, Kenneth G. Thomas

    "Since about 2002 there has been significant capital cost escalation, not inflation, in the mining industry causing turmoil for successful project completion. Project capital costs have more than doub

    Jan 1, 2014

  • SAIMM
    A logical approach to the evaluation of a stacked multi-reef Witwatersrand gold deposit

    By W. D. Northrop

    This paper gives an account of the development of a technique whereby the vertical limits of geological horizons may be identified by the use of vertical variograms on the mineral of economic interest

    Jan 1, 2003

  • SME
    Rock Engineering Aspects of Designing Large Span Caverns at Depth in the Deep Underground Science and Engineering Laboratory

    By C. Laughton

    Construction of a Deep Underground Science and Engineering Laboratory(DUSEL) is proposed under the auspices of the US National Science Foundation(NSF). DUSEL will provide scientists and engineers with

    Jan 1, 2007

  • SME
    Meerschaum Mining Activities in Eskisehir, Turkiye - SME Annual Meeting 2025

    By Mahmut Yavuz

    to in Old Uighur Turkish as Tolay kopugu, in Ottoman Turkish as Derya kopugu, and in modern Turkish as Luletasi. Scientifically known as sepiolite, it is represented by the formula Si12Mg8O30(OH)4(H2O

    Feb 1, 2025

  • AUSIMM
    An OperatorsÆ Guide to Sulfide Mineral Flotation

    The recent boom in the mining industry has lead to some unique challenges in successfully operating processing plants. With high turn-over rates of both operators and technical staff, and many experie

    Jan 1, 2009

  • AUSIMM
    Is an 80th Percentile Design Point Logical?

    By D David

    Clearly a plant designed only to treat average ore at the nameplate rate will fail to achieve nameplate in any typical year. To insert the necessary capability to achieve nameplate it is common proces

    Jul 15, 2013

  • AUSIMM
    The Storage and Distribution of Industrial Minerals in Europe

    Statistics on the imports of industrial minerals into the EECshow that the traded volume in 1987 is approximately 23 million tonnes.The following table documents the imported quantities on the most im

    Jan 1, 1989