Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Laboratory Studies on Creep Behavior of Grouted Tensioned Rebar in Weak Strata

    By Joseph Hirschi, Naga S. Y. Tirumalaraju, Aditya Mishra, Anthony (Sam) J. S. Spearing

    "Primary roof support in underground coal mines in the USA consists mostly of fully grouted passive rebar or grouted (partially or fully) tensioned rebar. Research conducted at two room-and pillar coa

    Jan 1, 2015

  • SME-ICGCM
    Optimisation Of Reinforcement Design Of Coal Mine Roadways (ef04df4d-16ce-4e1d-9fd1-73fd46706558)

    By Winton J. Gale

    The design of the reinforcement systems required to stabilise mine roadways has developed through the application of field measurement techniques. These techniques have allowed the level of security o

    Jan 1, 1992

  • SME-ICGCM
    Design Considerations of the Secondary Roof Support for Longwall Tailgate Entries

    By Jinsheng Chen

    To maintain the stability of longwall tailgate entries, they have to be supported by not only the primary roof support but also the secondary roof support due to the impact of the longwall mining¬indu

    Jan 1, 2003

  • SME-ICGCM
    Validation of Overburden Failure Zone in Complex Extra Thick Coal Seam by EH?4 Magnetotelluric Method

    By Hai Rong

    EH-4 Electrical conductivity imaging system has been playing an important role in prospecting, looking for water resource, and determining coal mine gob boundary by virtue of its significant advantage

    Jan 1, 2014

  • SME-ICGCM
    Numerical Modeling Of Longwalls In Deep Coal Mines

    By Salah Badr

    Longwall mine layouts with their entries, chain pillars, face support systems, advancing mining faces and compacting gobs represent a geomechanically complex mining operation. Geomechanical aspects ar

    Jan 1, 2003

  • SME-ICGCM
    Geotechnical Planning Basis for the Optimization of Workings

    By Nikolaos Polysos

    Besides considering the given geomechanical conditions, the geological/geotechnical logging of drill cores and heading faces during the driving of parallel entries and the resulting rock classificatio

    Jan 1, 2003

  • SME-ICGCM
    Field Testing of a Real Time Roof Mapping Drilling Display System in a Limestone Mine

    By Craig Collins

    The objective was to develop a Real Time Drilling Display System for Rotary Roof Bolting using Analyzing Software to display mapped holes as they are being drilled in real time. The Analyzing Softw

    Jan 1, 2004

  • SME-ICGCM
    Application Of Polyurethane Injection For Rehabilitation Of The Maingate Of A Deep Single Entry Longwall Mine

    By Kevin MacPherson

    After 34km of roof bolted drivage the first fall of ground occurred at the Phalen Colliery in the maingate of the 8th East longwall panel. The fall occurred over the stage loader as the wall approache

    Jan 1, 1999

  • SME-ICGCM
    Numerical Modeling of the Pillar Confinement with Backfilling Material in Room?and?Pillar Coal Mining

    By Andre Zingano

    It is known that the backfilling confinement increases the pillar strength and also reduces the rib lateral displacement. With backfilling, it is possible to increase the room-and-pillar mining recove

    Jan 1, 2011

  • SME-ICGCM
    Time Dependent Strength Of Coal Strata For Long-Term Pillar Stability

    By Z. T. Bieniawski

    A major study was performed on determination of long term strength of coal strata directed to the design of coal pillars to ensure their stability beyond the life-time of a mine. Based on field invest

    Jan 1, 1994

  • SME-ICGCM
    A Case History Investigation of Two Coal Bumps in the Southern Appalachian Coalfield

    By David Newman

    The Southern Appalachian coalfield has a long history of coal bumps that are attributable to a unique combination of topography, geology, and multiple seam mining. The high pillar stresses that genera

    Jan 1, 2002

  • SME-ICGCM
    Design And Planning Of Lower Seam Longwall Gateroads

    Case study data were analyzed to develop and quantify empirical stress transfer relationships between seams for both longwall and room and pillar mines. Layering in the innerburden and the distance be

    Jan 1, 1995

  • SME-ICGCM
    Rockbolting For Highly Stressed Roadways

    By Holger Witthaus

    The conditions of great mining depth and multi-seam¬longwalling require a special method of rockbolting, It can be described as a control loop which is based on the elements of planning, drivage and m

    Jan 1, 2000

  • SME-ICGCM
    Application of Yieldable and Cuttable Pump Crib in Longwall Recovery Room

    By Quanzhong Gu

    Stability of a pre-exnacted recovery room plays a vital role when longwall face approaches and during a longwall face move. In an attempt to extend the application of pumpable cribs into recovery room

    Jan 1, 2004

  • SME-ICGCM
    Surface Flooding-Considerations For Mining Facilities Site Selection

    By Daniel S. Mazzei

    This paper will be a general discussion of surface flooding considerations as they affect mining facilities site selection, based primarily on experience with several such problems with which MSHA&apo

    Jan 1, 1982

  • SME-ICGCM
    Aerostatic Support System For Underground Coal Mines

    By R. J. Morrell

    The Bureau of Mines developed a ground support system for use with an underground coal auger. The system consists of inflatable airbags that are inserted in the holes as they are drilled, and then gra

    Jan 1, 1988

  • SME-ICGCM
    The Duncan Method of Partial Pillar Extraction at Tasman Mine (8325db0b-edfd-48b5-8c88-7ef0db101af9)

    By Kent D. Mctyer

    Mining commenced at Tasman Mine in late 2006. The current method of mining is bord and pillar using continuous minerbolters and shuttle cars for first workings and secondary extraction using mobile ro

    Jan 1, 2011

  • SME-ICGCM
    Design Of Shield Supports For The U.S. Coal Mining Industry

    By Alan Peacock

    Shield supports have been in use in the USA underground mines since 1975, and their development in the intervening time has been progressive and inovative. Specialized techniques are used to optimize

    Jan 1, 1981

  • SME-ICGCM
    Methods of Controlling Hard Roof in a Longwall Face

    By Linsheng Xu

    When coal seam is under the integral thick sandstone (or conglomerate), the structure of thick sandstone is integral and its strength is rather high. After coal is extracted, the roof is hanging and c

    Jan 1, 1986

  • SME-ICGCM
    Effects Of Bedding Plane Sliding And Separation And Tensioned Bolt In Layered Roof

    3-D finite element modeling was performed to study the effect of bedding plane sliding and separation and tensioned bolt in layered root It was found that the major influence zones of a tensioned bolt

    Jan 1, 2001