Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Urban Resource Issues: Construction Aggregate AssessmentBy M. Rice, M. Stanley, J. Marlow
Arizona construction aggregate industry remains in the crosshairs of public debate, caught between the need for aggregate-based building materials and alternative, high-value land-uses. To better mana
Jan 1, 2002
-
Laboratory Baffled-Column Flotation Of Mixed Campbell/Eagle Seam Bituminous Coal – Preprint 97-121By S. K. Kawatra, K. J. Shoop, T. C. Rao, T. C. Eisele
This study investigates the use of a horizontally- baffled column (7.6 cm inside diameter by 344.2 cm high) to reduce the ash content of a high ash bituminous coal. Tests were carried out to determine
Feb 24, 1997
-
The Selection Of Excavation Methods For The Detroit Upper Rouge Tunnel Cso Control ProjectBy Jean Habimana
Complex and distinct geological units spread along the 7-mile long 30-ft inside diameter Upper Rouge Tunnel CSO Control Project in Detroit, Michigan. Its construction is divided in two tunnel construc
-
Roof And Rib Hazard Assessment For Underground Stone Mines – Preprint 97-113By L. J. Prosser, A. T. Iannacchione
Unfortunately from 1991 through 1995, 44 miners were fatally injured in the stone industry. Of these 12 occurred at underground mines from a total work force of less than 2,000 miners. Nine of these 1
Feb 24, 1997
-
Mining Matters At National Western Mining ConferenceWith unprecedented worldwide growth and increasing global demand for energy expected to swell by 60 per-cent in the next two decades, mining matters as much now, if not more, than it ever has. This w
Jan 1, 2008
-
Hydrogeologic Characterization and Mining Impact Analysis of a Low-Yield, Fractured Granite Mining, Metallurgy and Exploration (86a3e080-80de-4150-963a-4695a76dda43)By Michael Day, Paul Kos, Scott Brinton
A hydrogeologic characterization and impact analysis was performed for a proposed quarry at the Hitch Rack Ranch located in the Little Turkey Creek watershed southwest of Colorado Springs, Colorado. C
-
Variations In New Mexico Concrete Through TimeBy Kristen E. Coose
Concrete is a mixture of a fine aggregate (sand), a coarse aggregate (gravel), cement, and water. Cement itself is the most expensive of the ingredients but generally amounts to only about 10% of the
Jan 1, 1999
-
Enabling Mining Safety & Automation By Electronically Scanning Microwave Radar Systems On Surface Mining MachinesUsing a series-model of an automotive short range radar sensor (SRR) and a recently completed experimental radar system, field tests have been performed in a surface mine. It was examined, to what ext
Jan 1, 2007
-
Climate Change For Mine Planners: Some FundamentalsBy R. D. Williams
In spite of the increasingly polarized and politicized view of climate science and climate change in the United States, many of the principles behind the ?theory? of Anthropogenic Global Warming (AGW)
Feb 27, 2013
-
MinExpo 2008: The Biggest EverFrom the massive equipment that moves the earth, to the parts that keep the equipment moving, it was all on display for more than 35,000 people who at-tended MinExpo 2008 at the Las Vegas Convention C
Jan 1, 2008
-
Preliminary Design of the Caldecott Fourth BoreBy Bhaskar B. Thapa, Michael T. McRae, Johannes V. Greunen
This paper describes the preliminary design of the fourth bore of the Caldecott Tunnels along State Route 24 in Oakland, California. The paper focus is on two major aspects of the project: initial sup
Jan 1, 2007
-
Columbus Circle Station Complex - History and RehabilitationBy Aram Grigoryan
This paper addresses historical aspects and construction sequencing of the subway complex under Columbus Circle in Manhattan; the structural elements of the rehabilitation and new construction; and th
Jan 1, 2008
-
Using Administrative Controls to Reduce Tailings – Dam RiskBy G. H. Glos
There was a time when an occasional failure of a tailings embankment was considered an acceptable risk associated with mining activities. This is not the case anymore. A major tailings failure today
Jan 1, 1999
-
United Nations’ Emergency Preparedness Program Available to Mining IndustryThe Awareness and Preparedness for Emergencies at the Local Level (APELL) program is a process that helps people prevent, prepare for and respond appropriately to accidents and emergencies. APELL was
Jan 1, 2003
-
Technology News – Atlas Copco Wagner Announces Improved 10-t LHDAtlas Copco Wagner launched its ST1010 Scooptram load haul dumper. The ST1010 replaces the company’s Wagner ST-1000 Scooptram. The improvements to the Wagner ST1010 include increased reliability, ea
Jan 1, 2000
-
Precambrian History Of The Rocky Mountain RegionBy Kent C. Condie
Precambrian terranes in the Rocky Mountain region decrease progressively in age from the Archean Wyoming Province (> 2.5 b.y.) to the late Proterozoic in West Texas (figs. 1,2). Within the Wyoming Pro
Jan 1, 2013
-
Effective Planning Of Underground Space?Planning And Implementation Of The First Underground Water Reservoirs In Hong KongBy T. H. Chan
As the University of Hong Kong and their advisors planned their new Centennial Campus it became clear that they would have to re-provide existing water reservoirs on an adjacent site with new salt wat
-
Heavy- Mineral Deposits Of The Fox Hills Formation Located Near Limon, ColoradoBy F. L. Pirkle
A heavy-mineral deposit about 1.6 kilometers (I mile) in length and averaging about three meters (10 feet) in thickness is exposed approximately130 kilometers (80 miles) east of Denver, along Intersta
Jan 1, 2011
-
The Practical Use Of Sandfill In Creating Pillar Stability And Preventing SubsidenceBy W. K. Callaway
The need to increase ore recovery and pillar stability caused the Magmont Mine staff to investigate the use of sandfill to accomplish both tasks. The use of hydraulically stowed classified mill tailin
Jan 1, 1986
-
8 M Diameter 7 KM Long Beles Tailrace Tunnel (Ethiopia) Bored And Lined In Basaltic Formations In Less Than 12 MonthsBy Antonio Raschillà
On the 2nd of June 2007 SELI S.p.A. started the excavation of Beles Tailrace Tunnel (Ethiopia). The new 8,07 m diameter DS Universal TBM utilized for the tunnel excavation was manufactured by SELI S.p