Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Journal: 100 Years / A Trip Through The Anthracite Coal Mines

    By Robert Hopler

    RBH Note: in 1913 black powder was still dominant as a coal-mining explosive, but permissible explosives were making some slight headway. For example, in 1902 there were only 11,300 pounds of permissi

    Jan 1, 2014

  • ISEE
    Seismic Monitoring of Production Blasts

    By Klaus G. Hinzen

    Seismic observations offer the only possibility for remote sensing of physical processes like shock-front spreading, material crushing and ground movement. A better understanding of these processes wi

    Jan 1, 1989

  • ISEE
    Occidental's New Explosive Technology in Oil Shale

    By Thomas E. Ricketts

    Occidental Oil Shale Inc. has spent the last eight years at its Logan Wash. mine near DeBeque, Colorado, developing its modified in-situ oil shale process for obtaining oil from oil shale. Modified in

    Jan 1, 1981

  • ISEE
    Implementation of Blast Vibration Frequency Control Technology at R & F Coal Company

    By Doug Johnson

    This paper reviews the field implementation of R & F Coal's blasting optimization work concerning analysis, prediction, and control of overburden blasting vibrations using site specific measurements a

    Jan 1, 1988

  • ISEE
    Drone Technology Utilization to Increase Safety and Support Analysis for Blasting Process

    By Ery Wardhana, Stefanus Jagad, Relinda Sanistya, Hasucita Tausi, Rido Situmorang

    The blasting process is one of the most high-risk activities in mining operations. Shotfirers and blasting crews face hazards from slope failure, toxic gas and fumes, or unstable ground condition ever

    Feb 6, 2023

  • ISEE
    MS Initiation, a Possible Risk in Blasting Tall Structure

    By Bob de Raadt

    After a review of the general principles for blasting stacks, the stagnations of two stack demolitions are investigated. The author concludes and demonstrates that MS-delay blasting can be risky under

    Jan 1, 1982

  • ISEE
    Swedish Cautious Blast Excavation at the CSM/ONWI Test Site in Colorado

    By Roger Holmberg, William Hustrulid

    Swedish cautious blasting techniques were used to excavate a room at the CSM Experimental Mine in Idaho Springs, Colorado,as part of a ONWI/DOE sponsored nuclear waste disposal research program.

    Jan 1, 1981

  • ISEE
    Urban Tunneling for the MWRA's Boston Harbor Clean Up

    By Gordon C. Petersen, Gary A. Almeraris

    This paper describes the controlled blasting techniques required to mine a rock tunnel section of a main interceptor located in the Boston Metropolitan area. The 3m (10 ft) x 2.8m (9.25 ft) horseshoe

    Jan 1, 1991

  • ISEE
    The Effect of Charge Mass and Delay Timing on Airblast Overpressure

    By Adrian Moore, Dominic Hooton, Alan Richards

    Significant factors affecting airblast overpressure (AOP) emissions include charge mass per delay, distance from the blast site, burden, stemming height, and delay timing, topographic shielding, and m

    Jan 21, 2025

  • ISEE
    Journal: Blastserve A Discussion Forum for ISEE Members - Vibration Criteria for Blasting Near Fish in Pools

    Dear All, I am looking for information about vibrations and effects on fish in pools. A tunnel blast is planned to be carried out as close as 300 meters to a freshwater fish growing plant. What is th

    Jan 1, 2012

  • ISEE
    Northern Link - Tunnel Blasting In Environmentally Sensitive Surroundings - Using NCVIB

    By Donald Jonson

    Stockholm’s Northern Link, currently Europe’s largest urban road tunnel project, will be about 5 km long from west to east. Running through two separate, mostly parallel tunnels, each with 2-4 lanes,

    Jan 1, 2009

  • ISEE
    Moving 50’(15.3m) of Burden with a 4½” (115mm) Hole

    By Keith Henderson

    An open pit quarry operation in West Central Illinois provided a challenging proposition regarding the removal of a rock wall that once separated two pits, but was now in the middle of the north wall

    Jan 1, 2012

  • ISEE
    Seismic-Controlled Blasting Near a Critical Tailings Dam: A Case Study from an Open Pit Copper Mine in Chile

    By Gabriel Gonzalez, Paulo Couceiro, Luis Manriquez, Alejandro Gutierrez, Juan Navarro

    A high-stakes blasting campaign was successfully executed at a major open pit copper mine in northern Chile. This operation posed a significant technical challenge due to its immediate proximity to th

    Jan 26, 2026

  • ISEE
    Rock-to-Sensor Transmissibility of Vibrations

    By L. M. Lopez, J. A. Sanchidrian

    This work investigates the performance of some of the measurement techniques used in vibrations from blasting monitoring. Two tri-axial geophones with cases of different size, shape and mass were test

    Jan 1, 2014

  • ISEE
    How Lightning Detection Has Influenced AMAX Coal's Delta Mine

    By Steve Kane

    Lightning is a very real problem in the surface mining industry. Today, as adverse market conditions continue to influence the surface coal industry, it has become necessary that all functions of the

    Jan 1, 1992

  • ISEE
    Connecticut's "Call Before You Dig" System: New Laws and Regulations

    By Stephen G. Rieben

    Almost everyone has at least heard of the two one-call systems which serve New England. They are "Call Before You Dig", which covers Connecticut, and "Dig Safe", which covers the remaining five New En

    Jan 1, 1990

  • ISEE
    Review and Learnings from a Surface Quarry Rockfall Incident

    By Andrew Moore

    It has long been common practice to conduct drilling and blasting operations at surface quarries in the Midwest in close proximity to near-vertical highwalls. The main reasons for such an approach, an

    Feb 6, 2023

  • ISEE
    Blasting Improvements by Using Most Active Rock Variations on Blast

    By Alain Blanchier, Anne Charline Sauvage

    Rock mass variations have a huge influence on explosives efficiency and on blasting results. Numerous blasting improvements could be gained by taking into account rock mass and its variations. However

    Jan 1, 2004

  • ISEE
    Kuz-Ram Equation Analysis: A Reparametrization for the Peruvian Case

    By Dennys Huaman, Carlos Rojas

    Using the Levenberg-Marquardt algorithm to reparametrize the Kuz-Ram original model equation of the mean characteristic size and assess the errors of both models and their comparisson using different

    Feb 1, 2020

  • ISEE
    Perimeter Blasting with the ANFO-Spoon Technique

    By Larry Ng, Keith McDonald

    The benefits of controlled blasting techniques have gained increasing recognition by the mining industry in recent years. The utilization of an effective controlled blasting programme can result in a

    Jan 1, 1994