Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Ground Improvement by Dry Concrete ColumnsBy Tatiana Tronda
"The territory of Belarus is characterized by nonhomogeneous ground conditions. In some cases soft ground layers can reach tens of meters in depth. Application of piles and other conventional foundati
Jan 1, 2016
-
Challenges and Lessons Learned from Shoring Design of 2nd / Broadway Metro StationBy Babak Mamaqani, Pirooz Barar
Regional Connector Transit Corridor (RCC) is part of the Los Angeles metro expansion project under construction which adds three new stations into the system. PB&A was responsible for the design of th
Jan 1, 2019
-
Design, Modelling And Construction Of A 12-Sided Diaphragm Walled ShaftBy Stephen Buttling
The construction of a water treatment plant in Dandenong, Victoria, required detention tanks and a pumping well. The design provided by the Engineer used conventional rectangular cast-in-situ reinforc
Nov 1, 2022
-
Alternative Binder For Ground Improvement To Reduce Co2 FootprintBy Brandon M. Robinson, Osman F. Besler, Dominik Gaechter
The Sandbukta-Moss-Såstad (SMS) project is a part of the Intercity development project, which is part of the largest transport project in Norway, consisting of 270 km of new double-track rail. The SMS
May 1, 2022
-
Ground Improvement Using Stone Columns To Mitigate Liquefaction, Reduce Settlements And To Increase Safe Bearing Capacity Of In-Situ Soils – A Case StudyBy Venkata Krishnaiah Yeddala, Sai Vivek Adari, Suresh Kumar Velugu
Assam cancer care foundation (ACCF) proposed the construction of hospitals and related facilities across 18 locations in the state of Assam-India. Tezpur is one among the 18 locations of Assam with hi
Nov 1, 2022
-
Evergreen Line Rapid Transit Project: Analysis and Design of Deep Soil Mix Panels to Mitigate Seismic Lateral SpreadingBy E. Naesgaard, Brian E. Hall, A. Amini, Advanced Geosolutions, A. Azizian
"A 2 km section of the Evergreen Line Rapid Transit Project is supported on improved ground consisting of cement deep soil mix (CDSM) panels because of highly variable and challenging soil conditions,
Jan 1, 2015
-
A Soil Quake Davisson Offset Method For Drilled FoundationsBy Michael Perlow Jr
A modification of the original Davisson Offset Limit (DOL) is presented for drilled foundations using soil quake (QDOL) factors ranging from 2 to 6. A further modification of the Davisson Offset Limit
-
Design Build of the New NY Bridge FoundationsBy Leykam Chris J., Jacobs Scott. A.
"Construction of the New NY Bridge over the Hudson River 25 miles north of New York City is one of the largest civil infrastructure projects presently underway in the United States (formerly Tappan Ze
Jan 1, 2016
-
Metro Rome Line “C” - Artificial Ground Freezing Application for the Underpass of the Existing Metro Station San Giovanni - Line “A”By Giulia M. B., Ferruccio Cribari, Alessandro Bertero, Eliano Romani, Roberto Sorge, Francesca Casini
"The use of Artificial Ground Freezing (AGF) to form earth support and seepage control barrier systems has had applications worldwide. These cover a variety of construction problems, including the for
Jan 1, 2016
-
Ground Improvement for New Jersey Turnpike Interchange 14A: A Case StudyBy Sarah Ramp, Daniel V. Cacciola, Justin Labrozzi, Shafiq I. Siddiqui, Faisal Ahmed
"Construction of embankments up to 34 ft in height for twelve ramps and roadways needed for the New Jersey Turnpike Interchange 14A project required ground improvement. The subsurface conditions, cons
Jan 1, 2017
-
Self-Hardening Slurry Wall Installation by Hydromill at the Herbert Hoover Dike – An Innovative Solution (05e83755-4ec2-4ed4-a26c-d1e81c41960c)By Mario Mauro, Jeff Taylor, Carlos Morales
"In 2007 the US Army Corps of Engineers classified the Herbert Hoover Dike in Florida as a Dam Safety Action Classification (DSAC) 1 dam, and started the implementation of one of the largest dam rehab
Jan 1, 2017
-
A Case Study, Design Change from Spread Footing to Drilled ShaftsBy Drew M. Kurtz, Jeff L. Rai, Sara F. Frailey, Mohammad Ayub Iqbal
"This paper presents the foundation changes made for a five-span bridge over the Lehigh River constructed as a design-build project. During excavation within the cofferdam at Pier 2 for the constructi
Jan 1, 2016
-
Slurry Wall Design for Construction Using Soil Structure InteractionBy Nino Catalano, Meeok Kim, Gordon Chen
"The design of the below grade structure of Brigham Building for the Future (BBF) included three different areas to provide power generation and medical facilities as well as a parking garage. The thr
Jan 1, 2017
-
State-Of-Art Working Platform For Heavy Equipments Used For Deep Foundation ConstructionBy Arunsiva R., Sivaranan S., Venugopal B., Kumaran M.
Being a rapidly developing country, India is undergoing a massive infrastructure phase change remarkably. The construction industry is already set to boom, but the time and space constraints necessita
Sep 1, 2022
-
Construction of a Very Flexibility, Impermeable, Bituminous Membrane Seepage Barrier, to Connect an Existing Concrete Dam Structure to a Newly Constructed Abutment Cut-Off WallBy Brian Wilson, Megan Atkinson, Richard Diggle, Nathan Sweeney
"Ruskin Dam, located near Mission, British Columbia, was constructed in 1929 and 1930 and comprises of a concrete gravity dam structure founded on bedrock. At the right abutment, which consists mostly
Jan 1, 2017
-
Estimation Of Wind Turbine Foundation Rotational Stiffness Based On Fully Non-Linear Dynamic AnalysisBy Yazn Khasawneh Ph. D. P. E., Will Tjaden, Spencer E. Ness P. E., Mohammed Nasim Ph. D. P. E.
Wind turbine components undergo many loading cycles during their operational life. Additionally, wind turbines may undergo extreme loading conditions from natural hazards, mechanical failures, or emer
Oct 1, 2022
-
Jet Grouting for Groundwater Cutoff at Tie-in between Existing Tunnel and New ConstructionBy Aaron Evans, Chu E. Ho, Tom Richards
"This paper describes an innovative case history of using jet grouting to form a groundwater cutoff wall at the interface of a cut-and-cover construction and an existing tunnel. The design of the jet
Jan 1, 2016
-
Level Crossing Removal Project – Package 1By Andrew Middleton, Mick Stadter, Chris Crowe, David Chong
"The Level Crossing Removal Project – Package 1 is part of the Victorian Governments commitment to remove 50 of the most dangerous and congested level crossings across Melbourne. This involved removin
Jan 1, 1900
-
Bored Pile Construction Challenges in Highly Variable Limestone for a Supertall BuildingBy Seth K. Martin, Tony Nichlany, Alan R. Poeppel, Konstantinos Syngros
"This paper presents a case study on bored pile construction in challenging karst conditions below a supertall building in Kuala Lumpur. Innovative design and construction techniques helped keep the p
Jan 1, 2016
-
Comparison Of Large Plate Load Test Result With Predicted Deformation In Deep Vibro Techniques Treated Ground For Iron Ore Stockpile Yard In VietnamBy Leong, William. Chong, Kam Weng
Deep Vibro Techniques namely Vibro Compaction (VC) and Vibro Replacement (VR) are widely used in ground improvement to densify sands and strengthen cohesive soils. This paper describes the application
Nov 1, 2022