Challenges in Managing an Aging Infrastructure, Lessons Learned from a Near Miss at the Lake Manatee DamBy Glen R. Andersen
"Two of the greatest challenges we face in managing our aging infrastructure are to perform accurate condition assessments and to realistically predict the risk of non-action. The aim of this paper is
Jan 1, 2017
-
Opimization of Solid and Hollow Micropiles for Shallow Foundations on SandBy P. D. Arumairaj, B. Vani
"Micropiles are small diameter cast insitu reinforced grouted piles and it has been effectively used in many applications of ground improvement. It increases the load carrying capacity of soil and red
Jan 1, 2015
-
Role Advanced Technology - Resolve Inherent Dichotomy In High Strain Dynamic TestingBy Achyut Kumar Allady, Praveen Arumughan
NCHRP Synthesis 418 (2011) entitled, “Developing Production Pile Driving Criteria from Test Pile Data” details the occurrence of dichotomy between pile Skin resistance and pile Tip resistance mobiliza
May 1, 2022
-
DEEP FOUNDATIONS INSTITUTE 45th ANNUAL CONFERENCE ON DEEP FOUNDATIONSBy Sebastian Lobo-Guerrero
Welcome to DFI45! our first on-line annual meeting. We cannot deny the severe impacts that the COVID19 pandemic is having in our industry and our lives. We extend our support to all of our members tha
Oct 27, 2020
-
An Active Soil Nail Wall Underpinning SolutionBy Jonathan Ernst
The Bruce Museum is an art, science and natural history museum in Green- wich, Connecticut. The museum was originally built as a private residence in 1853, and has undergone several reno- vations, the
Aug 1, 2023
-
Design, Construction And Applications Of Auger Piling System For Earth Retention And Underpinning Of StructuresBy A. A. Gupte
Auger piling system which was developed in the United States in the 1940's is gaining acceptance in many parts of the world. Although primarily used to support foundations, the system is very use
Jan 1, 1989
-
Drilled Piers Support Massive Gantry CraneBy John R. Davie
This paper describes the design and construction of two 5.6 MN capacity drilled piers installed to support the main loading elements of a large cantilevered gantry crane. The critical crane columns we
Jan 1, 2006
-
Geo Data Integration for Offshore Wind Farm ProjectsBy Paul Doherty
The offshore wind sector is booming on a global scale, with the U.S. becoming a front runner in this highly progressive market. The Global Wind Energy Council has highlighted the exponential growth i
Oct 1, 2022
-
Cutoff Wall Selection for Levee ImprovementBy Louay Owaidat
The United States Army Corps of Engineers (USACE) Sacramento District awarded a $64 million construction contract in February 2020 to the Maloney Odin Joint Venture for 3 mi (4.8 km) of levee improvem
Oct 1, 2022
-
Improved Drainage by Drilled Filter Drains, Dam Safety Upgrade, Case StudyBy Carl-Oscar Nilsson, Åke B. Nilsson
"The embankment dam at Storfinnforsen is 23 m high and was completed in 1954. The dam has an impervious zone with timber sheet piles and a support fill of glacial till. The pore water pressure in the
Jan 1, 2016
-
Integrity Evaluation of Driven Concrete Piles Utilizing Embedded Data Collectors (ac1e1b32-2f59-488d-aca4-5ee1b43eb226)By Donald T. Robertson, Kurt Hecht, Michael K. Muchard
"This paper presents case histories of driven concrete pile damage detected with dynamic testing methods utilizing strain gages and accelerometers embedded in the pile at the prestressing yard during
Jan 1, 2017
-
Soil Mixing Evolution in San FranciscoBy Rob Jameson
"San Francisco is 49 square miles surrounded by reality." So said Paul Kantner of the local '60s icons, Jefferson Airplane, and his words have still held true. The rate, scale and complexity of recent
Jul 1, 2022
-
Deep Excavation with Well Point Dewatering in Soft SoilBy Mihir B. Roy
"Coal transported by rail for Thermal Power Plant in Haldia, West Bengal, India, was to be received and stored in Coal Complex comprising of Wagon Tippler, Track Hopper, Junction Houses and network of
Jan 1, 2015
-
TRD Soil Mixing at Herbert Hoover DikeBy George Burke
"Many soil mixing methods have evolved over the years, but the Trench Cutting Re-mixing Deep method (TRD) was developed in Japan, circa 1993, to construct continuous uniform cutoff walls, without the
Jan 1, 2009
-
Soil-Structure Interaction For A Tension Pile Pulled With StrandBy Chandramohan P. V
A unique tension pile where the pull is at a point a certain distance below the top of the pile. The pull is transferred by a cable consisting of high tensile strands. The HDPE duct of the cable preve
Nov 1, 2022
-
Retaining Structure for Berth at KrishnapatnamBy P. V. Chandramohan
"The paper deals with the arrangement of structural members for a retaining structure used as a berth in the port of Krishnapatnam. The height of retention is 24.3m. A T-shaped diaphragm wall acts as
Jan 1, 2015
-
TECHNICAL NOTE: Direct Solution of the Brinch-Hansen 90% Pile Ultimate Failure LoadBy Don W. Dotson
In 1962, Kondner prepared several papers dealing with hyperbolic stress-strain response of cohesive soils. The following year, Brinch Hansen proposed 80% and 90% failure criteria for stress-strain be
Aug 1, 2013
-
Recovery Efforts At The World Trade Center "Bathtub"By George J. Tamaro
In 1967 the Port Authority of New York and New Jersey undertook the construction of the World Trade Center (WTC) diaphragm walls, installation of the lateral support system and the excavation of the s
Jan 1, 2002
-
Use Of Geospatial Project Information Management Systems On Diaphragm And Secant Pile WallsBy Andrew Higgins, Jamey Rosen
This presentation will demonstrate some recent advancements in the applications of Project Information Systems (PIMS) technology to seepage barrier walls in the context of evolving Owner Specification
May 1, 2022
-
Geospatial Project Information Management System At Herbert Hoover DikeBy Jamey Rosen
A Project Information Management System (PIMS) was developed to manage and analyze QC data at the Herbert Hoover Dike Rehabilitation Dam Modification Cutoff Wall (owned by the Jacksonville District of