Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Maximizing Ore Extraction at Brunswick Mine

    By Barara Rose

    Presentation Outline ?Introduction of BMS ?Resource Integration Process ?Methodologies ?Tools ?Case Studies ?Zone 01 : 725 SOZ ?Zone 16/17 : 1000 NRP ?Conclusions

    Oct 1, 2010

  • CIM
    Experiences from an IREDES prototype project — Production drilling with Atlas Copco’s Simba L6C drill rig at LKAB Kiruna mine

    By U. Olsson, M. Ramström

    "The IREDES1 Special Interest Group (SIG) for drill rigs has been active since its launch during MineExpo 2000 in Las Vegas, Nevada, United States. SIG for drill rigs is responsible for the developmen

    Jan 1, 2005

  • CIM
    Laboratory Testwork of Mixed Xanthates for the Raglan Ore

    By Norman O. Lotter, Simon Yu, Tony Deng, Antonio Di Feo

    "Xstrata Nickel’s Raglan operation, northern Québec, achieved paymetal recovery gains in 2007 by switching the collector from potassium amyl xanthate to sodium isobutyl xanthate. To follow on from tha

    Jan 1, 2010

  • CIM
    Cyanide Recovery and Copper Removal from Gold Plant Effluents using Vitrokele™ - Pilot Plant Results

    By D. Kidby, A. Briggs

    "Vitrokele ™ is a synthetic adsorbent, using chelating groups on large polystyrene beads, developed in Canada over 7 years ago, and first commercialised in 1985 to recover noxious metals from plating

    Jan 1, 1992

  • CIM
    New Technology Provides Expanded Mine Design Options

    By Michael J. Kelly

    IAMGOLD?s Westwood project is the site for the largest, by volume, bored vent raise in North America. When completed, it will be the fifth largest bored worldwide in a single pass. This paper will re

    Oct 1, 2010

  • CIM
    Barrick?s Global Approach to Ground Control Management

    By J. Ran

    Ground instability is among the major causes of serious incidents and production disruptions in the mining industry and has a significant impact on safety. Mining companies may have operations in a nu

    May 1, 2006

  • CIM
    SUPASIM: A Methodology to Predict Plant Performance from Laboratory Data

    By C. J. Martin, M. P. Hay

    "A methodology was developed in the mid-1980’s to predict plant performance from standard laboratory flotation tests. The technique is based on a simple, empirical kinetics model, and is tailored for

    Jan 1, 2004

  • CIM
    Mechanism of Slag and Matte Formation in Copper Flash Smelting

    By Zhuo Chen, Jun Zhou, Jiemin Zhou

    Samples of the reacting suspension particles were taken from the reaction shaft of a commercial flash furnace at different heights. The processes of matte and slag formation and morphology of the samp

    Jan 1, 2019

  • CIM
    Real Time Performance Management in Metallurgical Operations

    By O. A. Bascur, J. Patrick. Kennedy

    "The lack of integration of mining and metallurgical information at sufficient detail to act is a problem. Without such data, mine cut-off grade can not be optimized on a per grade basis. It is diffic

    Jan 1, 2004

  • CIM
    Innovative Digital Instrumentation for Geotechnical Monitoring Systems

    By A. J. Hyett

    Due to the ongoing revolution in electronics and communications more cost-effective geotechnical instruments can be manufactured using digital technology. This new generation of digital instruments ha

    Oct 1, 2004

  • CIM
    Frother and Collector Effects on Flotation Cell Hydrodynamics and Their Implication on Circuit Performance (c615fbc8-d724-48ab-a36a-7fd85aca4c5e)

    By J. E. Nesset

    "Significant progress has been made over the past few years on characterizing and understanding the hydrodynamic properties of frothers and collectors and their effect on flotation performance. This n

    Jan 1, 2010

  • CIM
    Geomechanical Studies for Optimal Design of Post Pillars and Crown Pillar for Cut and Fill Mining in 124 OB at Birchtree Mine

    By D Reddy Chinnasane

    Outline Location of BirchtreeMine and Layout of 124 OB Cut and Fill Mining Background Purpose of the Studies Methodology Results and Analysis Conclusions and Recommendations

    Oct 1, 2010

  • CIM
    Improving Mining & Minerals Plant Performance ? Operations and Maintenance Working Together using new Information Technology

    By Gregory A. Johnson

    Operations and Maintenance departments have long had an adversarial relationship. The widespread evolution and adoption of modern management techniques such as Reliability Centered Maintenance (RCM) a

    Feb 1, 2008

  • CIM
    Developing Canada?s North - The New Challenge

    By Jesse L. Duke

    Outline ?Understanding the context ?The Business, political, social and legal environment ?Recipes for Success (three Ps) ?Develop effective Partnerships/relationships ?Plan carefully ?Actively

    May 1, 2006

  • CIM
    Large Flotation Machine Development and Operation

    By M. Churchill, V. R. Degner

    "Over the past two decades, declining ore body grades, increased operating costs and increased construction costs have provided an incentive for the development of progressively larger flotation machi

    Jan 1, 1982

  • CIM
    Continued Process Improvements at Campbell Mine

    By Ken Norris

    "Campbell Mine which has been in continuous operation since 1949 has undergone numerous operational changes in the past 3 years. This paper describes the process changes which have occurred at the Cam

    Jan 1, 1994

  • CIM
    A New Tool for Sag Hardness Testing

    By Glenn Kosick, John Starkey, Glenn Dobby

    "A practical new test has been developed for SAG hardness determination. Using two kilogram samples of minus one inch diamond drill core or crushed muck samples, the Starkey SAG Test has been shown to

    Jan 1, 1994

  • CIM
    Grinding media evaluation at Brunswick Mining

    By R. Grant, C. Bazin

    "Brunswick Mining has investigated grinding media optimization for the purpose of improving the flotation feed and regrind product size distributions to enhance metal recoveries. This paper presents t

    Jan 1, 1994

  • CIM
    Improvements in Column Flotation Through the Use of Microcel™ Spargers at Antamina

    By David Estrella, Hector M. Lizama, Jhonny Carrión

    "Microcel™ sparging systems were installed on one column of the molybdenum cleaner circuit and one column of the copper first cleaner circuit at Antamina. The Microcel™ system is known to generate fin

    Jan 1, 2008

  • CIM
    Removal and destruction of ammonia from a uranium plant effluent

    By P. A. Riveros, W. D. Gould, R. Molnar, D. W. Koren, P. Bédard

    This paper reports the results of the field demonstration campaign of a new process for removing and destroying ammonia from mining/ metallurgical effluent solutions. The 50-day campaign was carried o

    Jan 1, 2003