Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Central Patricia Mine

    By A. W. Johnston, R. E. Barrett

    "The Central Patricia mine is in the greenstone belt north of lake Sc. Joseph in northwestern Ontario. It is 90 miles north of Allanwater on the Canadian National railway and 220 miles east of the Man

    Jan 1, 1954

  • CIM
    In Integrated Approach for Characterization, Selection, and Development of Tailored Frother Formulations for Sulfide Flotation

    By Esau Arinaitwe

    The most extensively used methods and approaches for characterizing and selecting frothers for plant application are based on measurements in clean water in the absence of solids and without considera

    Jan 1, 2019

  • CIM
    Optimization of Industrial Copper Electrowinning Solutions

    By Corby G. Anderson

    "Laboratory testing using industrial electrowinning solutions was performed to determine the best Faradic cell efficiency for copper cathode recovery. The variables tested were solution flow rate, rec

    Jan 1, 2016

  • CIM
    Preparations for, and Early Action in, the Preservation of Life at the Time of a Mine Fire

    By G. Reuben Yourt

    This paper consists of two main parts. The first, under the heading Preparations, deals with suggested preparations to be carried out in advance so that loss of life might be prevented should a fire o

    Jan 1, 1947

  • CIM
    Cyanide Regeneration and Copper Recovery from Cyanidation Tailings

    By H. Soto, J. Jara, F. Nava

    A method has been developed to recover cyanide and copper from cyanidation effluents contaminated with thiocyanate and copper-cyanide complexes. Copper is precipitated as copper thiocyanate or as copp

    Jan 1, 1996

  • CIM
    Practical Considerations in the Operation of Gold Gravity Circuits

    By A. Putz, F. Vincent, A. R. Laplante

    "This paper briefly reviews some of the gravity research done at McGill University and current Canadian operating practices, with emphasis on results of interest for operators. The following topics ar

    Jan 1, 1994

  • CIM
    Arsenic Disposal Practices in the Metallurgical Industry

    By P. A. Riveros

    The literature on the arsenic disposal practices of the metallurgical industry and the long term stability of the disposed arsenic compounds were reviewed from a Canadian perspective. The review was c

    May 1, 2002

  • CIM
    Development of a Remotely Controlled Reagent Feeding System

    By J. A. Hillier

    The staff of the Hudson Bay Mining and Smelting concentrator have developed a new type of reagent feeder. Several factors encouraged the development of such a system: varying heads caused by the mixin

    Jan 1, 1973

  • CIM
    Overburden Mining Improvements at Suncor Energy?s Millennium Mine

    By Timothy D. Dreger

    In the spring of 2009, Suncor Energy Inc. technical personnel saw an opportunity to improve planning 0and mining of overburden material in order to address aggressive construction goals and increased

    May 1, 2011

  • CIM
    Development of a Heap Biooxidation Process for the Lahoca Refractory Gold Project

    By John Keay, Douglas R. Shaw, Gregory J. Olson

    "The results are presented herein of on-going laboratory investigations of heap bacterial oxidation as a pretreatment method for the recovery of sulfide-encapsulated gold from ore samples of the Rhode

    Jan 1, 1998

  • CIM
    Aluminium Therapy in the United States

    By J. W. G. Hannon

    FOLLOWING the experimental work of Denny, Robson, and Irwin, and the clinical investigation by Crombie and Blaisdell, an investigation of aluminium therapy was begun at Washington, Pa., which is situa

    Jan 1, 1944

  • CIM
    Performance Of Mn12 Swellex Bolts in Simulated Dynamic Environment

    By Mario Bureau

    Need for a lab assembly reaching better and consistent static anchorage capacities

    May 1, 2013

  • CIM
    Orange Footwall ?Sill? Nickel Plate Mine

    By Evans B. Mayo

    ABSTRACT Orange Footwall 'sill' is locally concordant locally discordant, with the structure of its sedimentary walls. The sediments were folded in two directions. Folds, following both thes

    Jan 1, 1951

  • CIM
    Sintering Practice at Anyox

    By T. W. Cavers

    The Dwight-Lloyd sintering machine was the answer to the flue-dust problem of the copper blast-furnace smelter. Then came concentration by flotation, which threatened to eliminate the blast furnace fr

    Jan 1, 1934

  • CIM
    The Historical Development of Electrolyte Additives and Their Specific Role and Influence on Cathode Quality

    By J. Brent Hiskey

    At present, approximately 80 % of the worlds mine production of copper is achieved by smelting and electrorefining. The principle aim of copper electrorefining is to satisfy the large demand for extre

    Jan 1, 2019

  • CIM
    Mastering Aboriginal Inclusion in Mining

    Partnership with MiHR ? AHRC and MIHR jointly developed Mastering Aboriginal Inclusion for Mining ? Customization specific to mining Mining is unique? ? History of Aboriginal peoples and the lan

    May 1, 2009

  • CIM
    Kimberlites in Alberta-A Major New Diamond-bearing Kimberlite Province

    By Brooke Clements

    The Buffalo Head Hills region is located approximately 350 kilometres northwest of the city of Edmonton in northcentral Alberta (Figure 1). The Alberta diamond joint venture consisting of Ashton Minin

    May 1, 2001

  • CIM
    Wall Classifier for Gondola-Typed Robot Using Kalman Filter

    By D. Y. Kim

    This paper shows an approach that a gondola-typed robot recognizes walls on building facades. It is applicable for autonomous or teleoperated building façade painting robots. The robot may react based

    Aug 1, 2013

  • CIM
    Shareholder Value in Mining: The Shifting Sands

    By Mauro Chiesa

    A. New Dictionary, Since 2007/8 Traditional concept of ?cycle? is dead A dearth of projects AND good metal prices suggests otherwise In a depletion-business, good times for any greenfields in 2-3

    May 1, 2013

  • CIM
    Erosion Control Hollinger Mine Tailing Site

    By I. M. Gordon

    "INTRODUCTIONThe Hollinger tailing disposal plant is situated about 1 1/4 miles south of the mill. The area available for tailing covers 620 acres and is roughly 1 ¼ miles long by ¾ mile wide.Tailing

    Jan 1, 1969