Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Progress Towards the Heap Bioleaching of Chalcopyrite

    By P D. Franzmann, D J. Readett, J Peterse

    A better connection between laboratory- and pilot-scale test results, and heap bioleaching performance can be achieved by generating reliable information on the fundamental microbial, chemical and phy

    Jan 1, 2004

  • AUSIMM
    The Mineral Resources and Industries of the Commonwealth of Australia and the Mandated Territory of New Guinea

    By Nye P. B, Fisher N. H

    At the second Empire Mining and Metallurgical Congress held in 1927, the Empire Council of Mining and Metallurgical Institutions was formed and it was proposed that the Council take steps to prepare a

    Jan 1, 1946

  • AUSIMM
    Going Underground - The Evolution of the Oaky Creek Mining Complex

    The evolution of the Oaky Creek mining complex provides a good example of the mining cycle in practice. Oaky Creek has been innovative in its choice of mining methods, with virtually the full range of

    Jan 1, 1998

  • AUSIMM
    The Control and Monitoring of D.M. Cyclone Contamination at the German Creek Mine Preparation Plant

    By Smith M, Milton T, Pitt G

    High levels of contamination (non magnetics) were present in the magnetite medium of the D.M. cyclone circuit. Attempts were made to minimise the amount of undersize (-lmm) material in the D.M. cyc

    Jan 1, 1987

  • AUSIMM
    Challenges in determining the capacity of mesh

    By J Hadjigeorgiou, T R. Stacey

    A ground support system is a combination of individual reinforcement and surface support elements that work together to retain and contain the rock mass. The various elements are subjected to external

    Nov 30, 2018

  • AUSIMM
    Pulse Width Modulation Drives and Integrated Motors ù The Ideal Solution for Large Friction Winder Applications

    This paper examines the latest advances in mine drive and motor systems. In the last decade, the drive technology employed for large mine winders has migrated from the traditional dc technology to ac

    Jan 1, 2005

  • AUSIMM
    Data Collection and Analysis for the George Fisher Project, Mount Isa, Qld

    By S Versace, D Arnott, D Bojcevs, A Shaw

    The George Fisher deposit is a significant sediment hosted silver-leadzinc resource located 2 km north of the Hilton Mine in NW Queensland. The George Fisher feasibility project involved the completio

    Jan 1, 1998

  • AUSIMM
    Measuring the Redistribution of Stresses Resulting from New Excavations with Ambient Seismic Noise Correlations

    By F Brenguier, R A. Lynch, G Olivier

    The seismic velocities of intact rock are dependent on the applied stress. Unfortunately, the low susceptibility of seismic velocity to stress changes mean that changes in seismic velocity have to be

    May 9, 2016

  • AUSIMM
    The Influence of Caving Mechanism on Powered Support Rating

    By Aziz N. I

    Examination of the geology and support performance at two site leads to development of an under tanding of the influence of caving on powered support rating. The two site represent the current extreme

    Jan 1, 1989

  • AUSIMM
    Coke Reactions and Structural Changes in the High Temperature Region of Australian Blast Furnaces

    By Coin CDA

    From a study of coke samples obtained from the tuyere level of four Australian Blast Furnaces, the nature of in-furnace coke degradation has been investigated. At the periphery of the raceway is a

    Jan 1, 1981

  • AUSIMM
    Comparative Resource Studies in an Open-Pit-Blased Estimates

    By T QUINLAN

    A resource estimate uses data obtained by sampling an orebody. An example is described in which a random drilling pattern did not provide a representative set of assays, and the estimated resource

    Jan 1, 1992

  • AUSIMM
    Comparison of Pyrotechnic and Electronic Initiation Systems at Whitehaven Coal Mine

    Sasol Roche Blasting Services (SRBS) has undertaken a process of trialing and evaluating the use of the SMI electronic initiating system with the specific purpose of being able to fully quantify the b

    Jan 1, 2003

  • AUSIMM
    Application of the Distinct Lattice Spring Model on Toppling Failure of a Jointed Rock Slope

    By N Khalili, J Zhao, G F. Zhao

    Toppling failure of a jointed rock slope was studied by using the distinct lattice spring model (DLSM). Compared with the classical discrete element model, the DLSM has the advantages of free calibrat

    Nov 5, 2014

  • AUSIMM
    Grade Control at Phar Lap and Haveluck Mines Meekatharra: Techniques, Successes and Failures

    By Payne P, Beirne W, Geldard D, O&apos

    Whim Creek Consolidated N.L. has operated openpit mines at Meekatharra since 1980. Mining operations commenced with the Haveluck openpit and the Phar Lap openpit was started in 1 984. Grade control in

    Jan 1, 1986

  • AUSIMM
    Pyrometallurgical process simulations using CALPHAD thermodynamic databases

    By M-A Van Ende, N Kumar, I-H Jung

    In order to utilise the powerful thermodynamic databases for process simulations, a concept called Effective Equilibrium Reaction Zone (EERZ) was introduced to couple thermodynamic database calculatio

    Aug 21, 2024

  • AUSIMM
    The Last One in 251: Mass Blasting at Selwyn Mine

    By Gilligan P

    The Selwyn gold-copper operation is wholly owned and operated by the Arimco mining group. The mine is located 150 kilometres south-east of Mount Isa. The primary extraction method for the gold-copp

    Jan 1, 1994

  • AUSIMM
    Deep Aquifer Shutdown Tests at Yallourn Mine

    By M Coulthard, J Rivalland, K Dugan

    Prior to 2001 Yallourn Mine has pumped approximately 1000 Megalitres of water per annum from aquifers beneath the mine floor in order to control aquifer pressures that were thought to have an influenc

    Jan 1, 2003

  • AUSIMM
    Tectonic Evolution and Mineralisation in the Arunta Block, Central Australia

    By R G Warren

    Sparse geochronological data have been combined with data on felsic suites and depositional facies of rocks to provide an overview of the development of the Arunta Block. The study provides a basis

    Jan 1, 1994

  • AUSIMM
    Loading of Au(CN)2 - Solution Onto Activated Carbon

    By Linge HG, Klauber C

    The key element in the carbon-in-pulp process for gold processing is the loading of dissolved Au(CN)2 from solution onto activated carbon. The mechanism and kinetics of this step have been examined

    Jan 1, 1989

  • AUSIMM
    Paper No. 123. Some Modern Methods in Ore Treatment by Cyanidation.

    Before proceeding I wish to say that the excellent diagrams by which my paper is illustrated are the work of Mr. C. H. Barnes, Constructing Engineer of the Kalgurli Gold Mines Limited, and I am also m

    Jan 1, 1903