Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Reducing Mining and Mineral Processing Plant Fatality Rates

    By N Cann

    In the 10 years from 1998 to 2008 the annual number of fatalities in the Australian mining industry has plateaued (MCA, 2007-08 and abc.net.au website). Despite significant efforts to eliminate fatali

    Aug 8, 2011

  • AUSIMM
    Geometallurgy – Back to the Future: Scoping and Communicating Geomet Programs

    By J Jackson

    The term geometallurgy (or geometallurgical) first appeared in the literature some 40 years ago and has a wide range of definitions and perspectives which increases the barriers of communication betwe

    Sep 5, 2011

  • AUSIMM
    A guide to ground disturbance permitting and managing ESG risk

    By H Arvidson, B Spence, S Helm

    Mining is the art of disturbing ground. All phases of a mine’s life cycle from exploration to building and operating a mine, through closure, has a physical impact on the earth. There is currently inc

    Sep 18, 2023

  • AUSIMM
    Methodology development of electrical conductivity measurements for non-ferrous slags

    By L Scheunis, A Van den Bulck, E Jak, K Verbeken, M Shevchenko, R Starykh, I Bellemans, P-J Boeykens

    As a result of the globally increasing consumer use of electronic devices, it is expected that pressure will increase on the supply chain of precious metals. Hence, recycling of these electronics beco

    Jun 19, 2024

  • AUSIMM
    Simulating Integrated Hydrology in Mining Catchments from Planning to Closure

    By S Szylkarski, D N. Graham

    In mining, water management is an operational necessity, requiring planning and detailed engineering, as well as risk assessment. Yet, the hydrology of streams and aquifers typically extends well beyo

    Jun 28, 2016

  • AUSIMM
    Waste Rock Pile Construction to Lower Closure and Relinquishment Costs

    By J R. Taylor, J A. Muchan, S M. Pape, B S. Davis

    Acid and metalliferous drainage (AMD) is routinely derived from waste rock, tailings, pit wall rock, underground mine voids, heap leach pads, ore stockpiles, concentrate stockpiles and even slag piles

    Jun 28, 2016

  • AUSIMM
    Using a Sustainability Assessment Framework to Achieve Enhanced Legacy Outcomes

    By S R. Green, G D. Corder

    The legacy issues from mining can, and have often, extended well beyond the closure of operations. However, conventional cost-benefit analysis provides little incentive to implement initiatives at the

    Jul 10, 2012

  • AUSIMM
    A tailored solution to determine plant capacity using strategic analysis

    By J Nortier, J Dray

    There is no single factor that determines the appropriate capacity for a mining project. It is driven by the size of the resource, the capacity of the market, the availability of capital, the availabi

    Jun 22, 2022

  • AUSIMM
    Elrington Colliery

    By Hindmarsh G

    The colliery is owned by the BHP Collieries Proprietary Ltd., the principal shareholders being the Broken Hill Pty. Company Ltd. and Hebburn Limited.It is situated due west of Newcastle and 6 south-ea

    Jan 1, 1935

  • AUSIMM
    Now to the Future – A Path Toward the Future Mine

    By I Gipps

    Each of us has a vision of what the future mine will be and, generally, these visions have many similarities and some differences. One of the major discrepancies in visions of the future mine is not t

    Nov 22, 2011

  • AUSIMM
    Design of Equipment for Dynamic Burden Measurements

    By D Johansson, A Nordqvist, D Mihaylov, N Petropoulos, M Wimmer

    The flowability of the caved rock masses in the sublevel caving (SLC) mining method is of great importance. During the blasting process of a SLC-ring, the caved rock mass in front of the ring is compa

    Aug 24, 2015

  • AUSIMM
    Using Electronic Detonators to Improve Fragmentation, Diggability and Crusher Throughput

    This paper reports on the field results of using electronic detonators to improve blast outcomes. OricaÆs electronic detonator, the i-konTM Digital Energy Control System, allows exact and precise timi

    Jan 1, 2003

  • AUSIMM
    Effects of Open Fire on Ventilation in Coal Mines

    By S K. Ray

    Open fire in a mine gallery causes large-scale damage to property and sometimes precious lives. Such fires produce two distinct effects, the throttle effect and the buoyancy effect. These effects dist

    Jan 1, 2005

  • AUSIMM
    Evaluating All the Alternatives to Select the Best Project Strategy

    It is well known that the ability to influence project value reduces significantly as planning progresses and decisions regarding project parameters are made. However, at the prefeasibility stage in p

    Jan 1, 2007

  • AUSIMM
    Applying the Metrics Navigator to Establish Strategic Indicators for Mining

    By D Tanzil, H Jones

    Every mine will close! Charting a profitable course through mine operations to acceptable mine completion requires that risk and opportunity management planning of the mine life begin as early as poss

    Jan 1, 2009

  • AUSIMM
    Managing continuous improvement of Mine to Mill begins with measurement

    By J Loeb, R Ramanathan, H Ingham, P Cameron

    Most mining operations, including iron ore, maintain a focus on continuous improvement and asset optimisation in their operations. As all the unit operations in the Mine-to-Mill value chain are interd

    Nov 8, 2021

  • AUSIMM
    Geostatistical Simulations of Kimberlite Orebodies and Application to Sampling Optimisation

    By M Field

    Kimberlite pipes, as opposed to dykes, sill and secondary deposits, are the primary target for diamond exploration companies because they have simple geometries and can contain large volumes of potent

    Jan 1, 2006

  • AUSIMM
    Geological Modelling and Bench Face Survey to Improve Blasting Fragmentation

    By E Gabriel, J C. Koppe, A Gomes and P Crispim, R Schaarsdmit, I Pablos

    Drill and blast (D&B) is one of the most important production operations in open pit mining. The resulting fragmentation of the D&B reflects in the downstream unit operation. Good fragmentatio

    Aug 24, 2015

  • AUSIMM
    Managing the Transition from Low Stress to High Stress Conditions

    The transition from low stress to high stress conditions is a challenge eventually faced by most mines in Australia that extend to depths greater than (generally) about 1000 m. In areas with strongly

    Nov 25, 2010

  • AUSIMM
    A Practical Approach to Truck Dispatch for Open Pit Mines

    By D M. Silva, J C. Alves

    According to the literature, material transportation represents 50 per cent of the operating costs for an open pit mine. In this context, this paper proposes a multistage approach for dynamic truck di

    Sep 26, 2011