Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A Comparison of Two Methods for Calculating the Constants K and Alpha in a Broken Ore

    By R Minnitt

    Two methods of calibrating the parameters K and Alpha for use in Gy’s formula for the fundamental sampling error were investigated. Approximately 480 kg of broken ore from Harmony’s Target gold mine i

    Jul 29, 2014

  • AUSIMM
    A Model To Control Bins for Hydraulic Hoisting

    A model has been developed for the per iodical maintenance of bins used for hydraulic hoisting in mining of steeply inclining coal seams. This model gives a control plan for hoisting, bin switching

    Jan 1, 1977

  • AUSIMM
    Extraction of Tin-Problems and Developments

    The main features and recent developments in the processes of benefication and extractive treatments of tin ores are reviewed. The need for development of processes to recover fine tin, tin from low-g

    Jan 1, 1992

  • AUSIMM
    BHP Gold Mines/Devex Gympie Joint Venture Project and the Geology of the Goldfield

    The Gympie Goldfield was the sixth largest producer of gold in historic terms in Australia. The Joint Venture Agreement between BHP Gold Mines Limited and Devex Limited was signed in January 1987.

    Jan 1, 1989

  • AUSIMM
    Mining Geophysical Methods for the 21st Century

    To help meet the challenge of mine finding at the start of the 21st century, the exploration geophysicist will have at his command a powerful range of tools, some new, some improved, and some whic

    Jan 1, 1986

  • AUSIMM
    Grade Trends at the Elura Mine

    The Elura Orebody consists of a number of parallel, vertically oriented pipe-like structures of pyrite-sphalerite-galena mineralization located at the core of a structural dome. Concentric zoning of t

    Jan 1, 1990

  • AUSIMM
    The Composition of Some Copper Slags From Port Kembla

    INDEX OF CONTENTSBlast Furnace SlagsForehearth AccretionsConverter SlagsConclusionsIllustrationsCOMPOSITION OF SOME COPPER SLAGS FROM PORT KEMBLASamples of copper slags from the Port Kembla Smelter of

    Jan 1, 1949

  • AUSIMM
    Stope Cleaning - Historical Methods

    In classical drill and blast underground mining methods, especially narrow vein operations economic quantities of broken ore can be left behind following normal mucking operations on the stope floors.

    Aug 1, 2010

  • AUSIMM
    Textural Characterisation of Manganese Minerals to Improve the Geometallurgical Characterisation of Ferromanganese and Iron Ores

    By S Hapugoda, J R. Manuel, M J. Peterson, A Poliakov, E Donskoi

    The occurrence and deportment of manganese in a number of ferromanganese and Mn-bearing iron ore samples from supergene-upgraded deposits, as well as from magnetite banded iron formation (BIF) and mag

    Aug 12, 2013

  • AUSIMM
    Geology - Paper No. 3 Applicaton Of Aerial Gamma Radiation Spectrometry In Australian Mineral Exploration

    In order to understand the technique, basic theoretical principles of radiation emission and in- strumentation theory are reviewed. Methods of surveying, reduction of data and interpretation are outl

    Jan 1, 1969

  • AUSIMM
    Optimisation of Grinding Circuits at the Lead/Zinc Concentrator, Mount Isa Mines Limited

    By Drinkwater DJ, Watsford RMS, Johnson NW, Munro PD

    This paper describes the use of modelling and simulation techniques in the analysis and optimisation of grinding circuits at the Lead/Zinc Concentrator of Mount Isa Mines Limited.The objectives of the

    Jan 1, 1985

  • AUSIMM
    Life Cycle Based Water Footprints of Selected Mineral and Metal Processing Routes

    By N Haque, S Northey

    Water in mining, mineral processing and metal production on a life cycle basis has been at the top of agendas for various industries, government agencies, research organisations, academic institutions

    Nov 26, 2013

  • AUSIMM
    Owner-Operator versus Contractor Production Scheduling - A Vision for the Effective Exploitation of Australian Gold Resources by Surface Mining

    By R Halatchev

    Production scheduling optimisation in open pit gold mining is a complex problem as it is driven by economic criteria reflecting particular economic interests of the concerned parties in the mining bus

    Sep 26, 2013

  • AUSIMM
    An Investigation of Heave and Fragmentation Related to Explosive Properties

    By Vestre J, Kure K, Bergqvist I

    Existing practical laboratory tests for comparative strength determination of commercial explosives consist of the lead block test, the ballistic mortar test, the bubble test etc. These tests are ca

    Jan 1, 1990

  • AUSIMM
    "Sampling and Test Work Protocol Development for Geometallurgical Characterisation of a Sheeted Vein Gold Deposit"

    By Y Xie, L O’Connor, S C. Dominy

    "Sheeted vein gold deposits are characterised by multiple subparallel veins and free milling gold. In situ heterogeneity of mineralisation results in grade and process parameter variability, which wil

    Jun 15, 2016

  • AUSIMM
    The Effects of Increased Salinity on Microbially Mediated Ecosystem Processes in Ephemeral Streams

    By J L. Kerr, J Beyer-Robson, S Vink

    Driven by an increasing need for water conservation, coal mine operators in the upper Isaac River catchment have placed significant emphasis upon the reuse of water. This initiative led to an overall

    Nov 26, 2013

  • AUSIMM
    Pyrometallurgical treatment of nickel smelting slag with biochar

    By L Klemettinen, A Jokilaakso, D Attah-Kyei, P Taskinen, M Tiljander, D Sukhomlinov, D Lindberg

    In this study, the use of carbon neutral biochars as reducing agents in the pyrometallurgical treatment of nickel slag was investigated at 1400°C in order to recover valuable elements such as copper a

    Jun 19, 2024

  • AUSIMM
    Use of Mineralogy to Interpret Laboratory-Scale Acid Rock Drainage Prediction Tests - A Gold Case Study

    By S T. L Harrison, J-P Franzidis, M Becker, N Dyantyi, J L. Broadhurst

    Gold mining is a major contributor to the South African economy, but is associated with several environmental issues such as acid rock drainage (ARD). ARD is due to the oxidation of sulfides in gold t

    Sep 26, 2013

  • AUSIMM
    Disseminated Gold in Ankeritic Alteration Zones, Rise & Shine and Shotover, Otago Schist

    By D MacKenzie

    The Rise & Shine Shear Zone is a shallow-dipping Cretaceous late metamorphic shear zone formed in a compressional environment. The Shotover mineralised system is dominated by normal faults with we

    Jan 1, 2007

  • AUSIMM
    The MOLTEN Conference series and research trends in slags, fluxes and salts 1980–2023

    By P Hayes, D Fadhlurrahman

    Molten slags, fluxes and salts play key roles in a wide range of the high temperature industrial process applications, including metals production, refining and recycling, metal manufacturing processe

    Jun 19, 2024