Search Documents

  • SME
    Structural Geologic Mapping to Identify Controls on Ground Instability in Surface and Underground Limestone Mines

    By S. E. Phillipson

    During the course of evaluations by the Mine Safety and Health Administration’s Roof Control Division, the controls on ground instability were investigated at surface and underground limestone mines t

    Jan 1, 2006

  • AUSIMM
    Pilot Plant Testing in Mineral Process Plant Design

    By Dunlop GA

    Pilot Plant confirmatory testing of the treatment route developed in the Metallurgical Laboratory is an essential factor in the development of complex ore bodies. Objectives should be well defined t

    Jan 1, 1990

  • SAIMM
    Comparison Of Globoid And Cylindrical Shearer Drums? Loading Performance

    By M. Ayhan

    Drums of a modern longwall shearer are manufactured to include various constructional features conveying extracted material onto the face conveyor as efficiently as possible. Designing a drum with a c

    Jan 1, 2006

  • AUSIMM
    Size Patterns of Gold-Silver Deposits in the Hauraki Goldfield, Coromandel Peninsula

    This paper presents an analysis of the production data for the period 1861 - 1953 from hydrothermal gold-silver deposits of the Hauraki Goldfield. To directly compare the metal content of the deposits

    Jan 1, 1981

  • AUSIMM
    Geological Structure of the Hill 50 Gold Mine

    The Hill 50 Gold Mine is situated at Boogardie, 3 miles on a bearing of 295 degrees from; Mount Magnet township. Mount Magnet lies 300 miles north-north-east of Perth, Western Australia (Fig. 1).The o

    Jan 1, 1960

  • SAIMM
    The Application and Economics of Industrial Alkaline Leaching of Copper Enargite Concentrates

    By C. G. Anderson

    "As demand for copper and precious metals continues to grow, the need to develop new supplies increases. In the imminent future, the new large global ore bodies are more complex, with enargite, tennan

    Jan 1, 2015

  • SAIMM
    Putting Beach Slope Prediction Into Perspective - Synopsis

    By R. J. Jewell

    The storage capacity of any given tailings storage facility (TSF) is a function of the volume available for the tailings, for which the geometry of the final upper surface of the tailings is most impo

    Jan 1, 2012

  • DFI
    Deep Mixing Method: An International Overview Of Technology, Testing And Product

    By D. A. Bruce

    The Deep Mixing Method is a very valuable tool for combating problems related to in situ soil treatment, improvement, and retention. Many different variations are used throughout the world, and there

    Jan 1, 2001

  • SME-ICGCM
    Applications Of New Technologies To The Technical Design And Monitoring Of Longwall Panels

    By Brad R. Blair

    This paper will review impacts on longwall design and ground stability assessment due to advances in mine automation and sensing technology. Several new approaches to the prediction and monitoring of

    Jan 1, 1996

  • SME-ICGCM
    Cementitious Seal/Rock Interface Under Hydrostatic And Dynamic Loadings (28th International Conference on Ground Control in Mining)

    By Khaled Morsy

    Cementitious seals are made of foamed cements with strength ranging from 100 to 600 psi. These cementitious seals are usually used at locations where the seal will be subjected to some convergence, as

    Jan 1, 2009

  • NIOSH
    OFR-130-78 Time Resolved Audio Dosimeter System

    By Gordon R. Sima

    This contract is concerned with the construction of a Time Resolved Audio Dosimeter System consisting of one readout unit and several dosimeter units. The Time Resolved Audio Dosimeter System was desi

    Jan 1, 1977

  • AIME
    Endowment Funds (7b6c8555-360c-4913-b4a4-ae7f39dbc067)

    The income of the Institute is derived from dues, subscriptions to MINING AND METALLURGY and sale of publications. These sources are fortunately supplemented by the interest from invested funds now am

    Jan 1, 1936

  • SME-ICGCM
    Effect of Roof Convergence on Stability of Underground Mine Seal Subjected to Explosion loading - Numerical Approach

    By Rajagopala Reddy Kallu

    After the Sago and Darby No. 1 mine incidents, the new regulatory standards for the design of mine seals in underground coal mines of the United States require the mine seals to withstand higher explo

    Jan 1, 2007

  • SME
    Monitoring Acidophilic Microbes With Real-Time Polymerase Chain Reaction (PCR) Assays - Preprint 09-014

    By F. F. Roberto

    Many techniques that are used to characterize and monitor microbial populations associated with sulfide mineral bioleaching require the cultivation of the organisms on solid or liquid media. Chemolit

    Jan 1, 2009

  • CIM
    An Approach to Energy Management at Falconbridge Nickel Mines Limited

    By D. M. Doyle

    A study of the various components contributing to energy costs and their relationships to generally trended operating data, such as tonnage, operating costs, etc., over progressively shorter time peri

    Jan 1, 1979

  • SAIMM
    Re-aligning the cutting sequence with general support work and drafting a support sequence at Simunye Shaft

    By K. Lombard

    "‘Roof support awaiting time’ (RSAT) is a term used at Goedehoop Colliery’s Simunye Shaft to describe the potential production time lost due to the continuous miner (CM) standing idle waiting for roof

    Jan 1, 2015

  • AIME
    Recent Developments of Electric Power Shovels

    By Harvey T. Gracely, Mark J. Woodhull

    DURING the past few years a marked refinement has taken place in the design of electric power shovels for the mining industry, increasing their digging ability and speed of operation without adding to

    Jan 1, 1938

  • CIM
    Achieving a Great Start-Up: Action Plan to Maximise Your Chances of Success

    By S. Bellec, P. Champagne, J. Châteauneuf, A. Berton, S. Fortier

    "The start-up of new plants, extending from the commissioning of equipment to the production ramp-up, is a critical period where the processing circuit operation must be done in a structured and well

    Jan 1, 2016

  • DFI
  • SME
    Extensive Concrete and Shotcrete Systems for the World?s Longest Tunnel (Gotthard Base Tunnel?56km)

    By Jürg Schlumpf

    Concrete is one of the decisive construction materials, also for the AlpTransit Gotthard Tunnel. The client has many requirements, and many are the solution possibilities that concrete systems can off

    Jan 1, 2008