Niagara Tunnel ProjectBy Doug Harding
The Niagara Tunnel Project (NTP) is a 10.4 km (6.5 mi) long, 14.4 m (47.5 ft)bored tunnel that will run under the City of Niagara Falls from the Upper Niagara River to the Sir Adam Beck Power Station.
Jan 1, 2007
-
RockVision3D™ Applications to Delineate Hazardous Geologic and Stress Conditions in Coal Mines—Case HistoriesBy K. Y. Haramy, K. Hanna
Early identification of adverse geologic conditions and high stress concentrations during the high-speed extraction of coal using modern mechanized longwall systems is a major challenge facing the min
Jan 1, 1999
-
Longwall Coal Mining Under S.M.C.R.A. 1977 The Ohio ExperienceBy Robert J. Rothwell
Underground mining of coal by longwall mining methods has not been a predominant technique in Ohio. To date, only five mines in the state utilize this method, however, the technique has sparked a cert
Jan 1, 1986
-
Diesel Emissions Control Strategies For The Use Of Diesel Engines In Underground Coal Mines – Preprint 97-144By N. Paas
Diesel powered equipment has been operated in underground coal fir mare than 50 years. According to the Mine Safety and Health Administration (MSHA), there are approximately 3,000 diesel units operati
Feb 24, 1997
-
Purification of high-grade calcite ore by flotation with alkyl diaminesBy P. Dhar, H. R. Kota, M. Thornhill
Precipitated calcium carbonate is used as a filler and coating material in the manufacturing of paper because of its high brightness and light scattering characteristics. However, beneficiated calcite
-
The Practical Use Of Sandfill In Creating Pillar Stability And Preventing SubsidenceBy W. K. Callaway
The need to increase ore recovery and pillar stability caused the Magmont Mine staff to investigate the use of sandfill to accomplish both tasks. The use of hydraulically stowed classified mill tailin
Jan 1, 1986
-
Transfer Function Model Of Phosphate Heap LeachingBy M. Weatherspoon, S. Gebo, K. Prisbrey
Our objective was to develop a transfer function model of phosphate heap leaching for design, optimization and control. The procedure included analysis of time-lapse photography of a laboratory heap.
Jan 1, 2001
-
Hoisting Systems (a4900c29-13ab-4c51-a9d4-095a976b1923)By Christopher J. Bise
INTRODUCTION The transportation of men, supplies, and mined material from an underground operation is the connecting link between the mine plant and the surface plant. Unless the mine is accessed by
Jan 1, 1986
-
Study On Leaching Vanadium From Roasted Residue Of Stone CoalBy D. He
In China, the total reserves of vanadium, reported as V2O5, in stone coal is 118 Mt (130 million st). Recovering vanadium from such a large resource is very important to China?s vanadium industry. The
Jan 1, 2008
-
Notes On The Efficacy Of Wet Versus Dry Screening Of Fly AshBy B. Valentim
The methodology used to obtain fly ash subsamples of different sizes is generally based on wet or dry sieving methods. However, the worth of such methods is not certain if the methodology applied is n
Jan 1, 2008
-
Strategies for ensuring a sustainable supply of quality mining professionals for the worldThe mining industry continues to experience a skills shortage and this is having an impact on the ability of mining companies to operate sustainably. Apart from a few exceptions, there is a dearth of
Jan 1, 2011
-
Lessons and implications from the onshore and offshore gas hydrate field production testsBy Se-joon Kim, Jong-hwa Chun
"‘Gas hydrate’ is the common term for a solid material formed from the combination of various gases as ‘guest’ and water as ‘host’. A series of large-scale scientific drilling and coring programmes co
Sep 1, 2014
-
Fine Coal Cleaning Using A Centrifugal Fluidized Bed SeparatorBy Mutombo Nombe, Avimanyu Das, Rick Honaker
Enhanced gravity separators (EGS) provide a more efficient separation than froth flotation when cleaning coal in the 150 x 25 µm particle size range. To improve the performance of an EGS unit, air bub
Jan 1, 2005
-
WMATA Use Of The New Austrian Tunneling Method For Lining And SupportBy Larry H. Heflin
The Washington Metropolitan Area Transit Authority's Wheaton Station and tunnel design was completed and offered for bid in the Spring of 1983. The format was unique to the Authority: a four part
Jan 1, 1985
-
Methods For Determining Roof Fall Risk In Underground Mines (e9e99c27-c4ac-4dc4-b19d-607c245139c5)By T. Bajpayee, L. Prosser, A. Iannacchione
Reducing the number of roof fall injuries is a goal of the NIOSH mine safety research program. Central to this effort is the development of assessment techniques that will help to identify the nature
Jan 1, 2007
-
Tunneling Methods Under Low Cover ConditionsBy Terry M. Tilley, Gregory P. Sherry
Purpose This is a unique project because the mining and tunneling industries have become highly mechanized and cannot normally accommodate a project where surface disturbance must be minimized or e
Jan 1, 2005
-
The Role Of Bacterial Alteration In Whitening And Iron Removal From Georgia’s Commercial Kaolin ClaysBy E. Shelobolina, S. M. Pickering, J. E. Kogel
A long history of weathering and bacterial alteration processes have transformed Georgia’s Coastal Plain kaolins from dark organic muds to recrystallized white pigment-grade industrial clays. A seque
Jan 1, 2002
-
Annual Review 2006 – Coal ReviewBy F. Freme
For the second time in four years, the coal industry was brought to the forefront of the nation’s consciousness in 2006, as two separate events unfolded which involved coal miners trapped underground.
Jan 1, 2007
-
Design and Construction of a Multiple-Drift Subway Underpinning Structure for Boston’s Central Artery/Tunnel ProjectBy Robin B. Dill, Mark Pelletier, Daniel J. Dobbels, Subodh Bhaumik, Daniel J. VanRoosendaal
Although primarily cut-and-cover excavations are required for replacement of the existing elevated I-93 interstate highway through the heart of Boston for the Central Artery/Tunnel (CA/T) project, som
Jan 1, 2001
-
Dewatering for the Lenox Avenue Subway Reconstruction ProjectBy Paul C. Schmall, Thomas Tuozzolo, Arthur B. Corwin
The Lenox Avenue Reconstruction Project involved the excavation and replacement of 750 m (2,500 ft) of deteriorated subway invert concrete, 5 to 7 m (15 to20 ft) below water table in very permeable gr
Jan 1, 2001