Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Auditing Underground Development Drilling and Blasting

    By Thomas L. Barkley

    My historic auditing of Underground Drilling and Blasting Practices has demonstrated to the author the need for reviews of many mines' procedures in these processes. Poor understanding of the basic pr

    Jan 1, 2019

  • ISEE
    Testing of a New Blasting Mat Constructed Using Rubber Tractor Treads

    By Matthew K. Coy, Paul N. Worsey

    The work described in this paper comprised the master’s thesis work of the primary author and was conducted at the Missouri S&T experimental mine. The objective was to determine if rubber tractor trea

    Jan 1, 2015

  • ISEE
    Dynamic Response of Buried Oil Pipeline Caused by Tunneling Blasting

    By Zheng Shuangying

    The vibration effect of the buried oil pipeline caused by tunneling blasting affects the pipeline safe transportation, tunnel construction schedule and its construction cost. The dynamic response char

    Jan 1, 2015

  • ISEE
    Vibration and Airblast Standards for Underwater Blasting in Virginia

    By Gordon Matheson, Bill Yancey, David K. Miller

    "Current regulatory limits for blast vibration and airblast control in Virginia do not specifically addressunderwater explosive testing. Underwater detonation of explosives generates an initial shock

    Jan 1, 1999

  • ISEE
    Numerical simulation of blast demolition for steel construction

    By Y Wada, Y Ogata, T Nishida

    "Shaped charge is used for blast demolition of steel construction in general. It is important tocontrol movement of cutting part with shaped charge for the blast demolition of steel construction.Movem

    Jan 1, 1999

  • ISEE
    MSHA Regulations and Bom Research Program on Multiple Short-Delay Blasting of Coal

    By J Edmund Hay, Harry C. Verakisl, Richard J. Mainiero, John J. Mulhern

    As the first stage in the rulemaking process, MSHA prepared requirements for the approval and use of permissible explosives and blasting items in underground coal mines. These draft requirements known

    Jan 1, 1985

  • ISEE
    Hydraulic Boulder Fragmentation using Small Explosive Charges (e17fa3e4-a011-4982-aee2-a189f0d0465a)

    By Bryan J. Lane, Paul N. Worsey

    The recommended maximum explosive weight for boulder blasting using internal charges is 0.1 O-kg/m” (3.5 oz./yd) (Olofsson, 1988). Normally this charge results in excessive scattering and flyrock, cre

    Jan 1, 1999

  • ISEE
    Factors Affecting Fumes Production of an Emulsion and ANFO/Emulsion Blends

    By Donald Hurd, James Rowland, Richard Mainiero

    In previous conferences the authors have reported on toxic fumes generated by the detonation of ANFO. The research reported here extends the earlier work to include an emulsion blasting agent and ANFO

    Jan 1, 2001

  • ISEE
    Optimization of Underground Blasting Techniques for Electronic Stope and Raise Blasts

    By Juan Pablo Guevara, Victor Munoz, Rob Bush, Gonzalo Marias

    Cerro Negro Mine, property of Goldcorp Inc., is in the process of developing four separate underground access ramps for the exploitation of high grade, narrow vein gold deposits with vertical to sub-v

    Jan 1, 2015

  • ISEE
    Case Study: Technology Application for a Hardness Model in Minera Caserones

    By Hernan Navea, Carlos Alvarado, Exequiel Nuñez, Matías Suarez, Jhon Silva, Bryan Townsend, Bryan Caceres, Felipe Pontanilla

    Nowadays, technology dominates all aspects of human activities, and drilling and Blasting (D&B) is no exception. In most cases, the use of technology in D&B is focused on controlling individual activi

    Jan 21, 2025

  • ISEE
    Coyote Blasting - An Overview

    By S. S. Jenkins Jr.

    While the method is seldom used anymore, coyote blasting is an historically interesting way to blast large quantities of rock. It was used extensively in the days before modern fast drills were availa

    Jan 1, 2005

  • ISEE
    IMESAFR Sensitivity Studies

    By Tyler Ross, John Tatom, Lon Lantis

    The Institute of Makers of Explosives (IME) began development of a Quantitative Risk Assessment (QRA) tool, IMESAFR (Institute of Makers of Explosives Safety Analysis for Risk), in 2005 as a technolog

    Jan 1, 2014

  • ISEE
    Increase in Production and Dilution Control in Narrow Vein Ore Bodies

    By Victor Munoz, Jorge Oliva, Gonzalo Marias

    Cerro Vanguardia is a known gold and silver deposit located in the province of Santa Cruz, Argentina. The mine has been in operation since 1998 and is thought to be one of the most important mines in

    Jan 1, 2019

  • ISEE
    Improving Explosives User Safety by Introducing Regulation Awareness Training

    By L. A. Heim, E. A. McCullough, N. J. Amiotte

    The explosives industry is subject to the laws of multiple jurisdictions, which means that several regulatory agencies are responsible for governing different aspects of the commercial explosives indu

    Jan 1, 2014

  • ISEE
    Preventing Coal Damage and Loss Through Bottom Hole Air Decking in Cast Shots

    By Steve Collinsworth

    Sometimes, for those of us in the right place at the right time with the right product, necessity creates opportunity. Such is my case at a West Virginia coal mine where a mine manager was desperately

    Jan 1, 2000

  • ISEE
    FROM 100 ABOVE TO 50 BELOW, IN THE HARDEST ROCK IN AMERICA / Practical Blasting Lessons from the Great Mesabi Iron Range

    By Donald Little, Larry Unger

    This paper will give a detailed insight into hard rock, large diameter surface blasting including some practical tips to improve blasting practices. These tips will be non-technical, of the nuts and b

    Jan 1, 2006

  • ISEE
    Quantifying the Probability of Detonator Timing Overlap in Surface Mine Blasting by the Application of Monte-Carlo Simulations to Initiation Plans

    By Rob Farnfield

    The control of vibration from surface mine blasting by the application of detonator (cap) delay techniques has been universally accepted for many years. For almost as long it has been known that, for

    Jan 1, 1999

  • ISEE
    Modeling Coal Seam Damage in Cast Blasting

    By Dale S. Preece, Stephen H. Chung

    "A discrete element computer program named DMC_BLAST (Distinct Motion Code) has been underdevelopment since 1987 for modeling rock blasting (Preece & Taylor, 1989). This program employsexplicit time i

    Jan 1, 1999

  • ISEE
    Techniques of Precision Blasting in the Excavation of Drilled Piers

    By George Young Mosteller

    This paper is summary of the practical solutions developed in the excavation of drilled piers (caissons) at GPCo's Plant Scherer, Juliette, GA. Plant Scherer is a 3,245 Megawatt Fossil Fuel Powerhouse

    Jan 1, 1980

  • ISEE
    Low Level Continuous Vibration and Potential Damage

    By Edward J. Jr Walter, Edward J. Walter

    The vibration problem is approximately fifty years old. The original investigation of the U.S. Bureau of Mines was begun in 1930. Significant investigation into the problem was done by Crandell, Lange

    Jan 1, 1979