Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Get More from Existing Mining Equipment Through Reliability

    Improved Process & Practices Result In: ? Reduction of undesirable downtime, & expensive secondary damage ? Improved equipment performance & health ? Extension of equipment life, & reduction of ope

    May 1, 2010

  • CIM
    The Design of Instruction to Introduce a New Technology: A Case Study in Canadian Mineral Processing

    By H. D. Stolovitch, M. L. Lavallée

    "An engineering system used to analyze and improve the performance of industrial grinding circuits has been adapted into a training program. The systematic approach to the design of training was appli

    Jan 1, 1992

  • CIM
    Ilmenite concentration from the Laurentian Titanium deposit

    By G. E. Agar, W. B. Kipkie, V. K. Drylie

    "This paper describes mineral processing test work on drill core samples from an ilmenite deposit in Terrebonne County just north of Montreal.Mineralogical examination showed that the intimate associa

    Jan 1, 1980

  • CIM
    A Strategy to Reduce the Consumption of Sodium Sulfide in Flotation of Molybdenite at the Sarcheshmeh Copper Complex

    By S. Banisi, M. Poorkani

    The Sarcheshmeh copper deposit contains 1 billion tones of ore averaging 0.7% copper and 0.025% molybdenum. It is located southeast of Iran and currently processes 41,000t/d. Molybdenite as a by-produ

    Jan 1, 2005

  • CIM
    Haldor Topsoe’s Catalytic Advances Result in Dramatically Lower So2 Emissions

    By Patrick Polk

    For many years, sulfuric acid producers all over the world have been forced to meet ever more strict environmental regulations to reduce SO2 emissions. The sulfuric acid industry has implemented new s

    Jan 1, 2014

  • CIM
    MAC and the AFN: Taking Up the Corporate Challenge

    Taking Up the AFN Corporate Challenge ?? About MAC ?? ?Towards Sustainable Mining? ??Mining and Aboriginal Peoples Framework ?? AFN-MAC Relationship ?? A New MAC Northern Initiative ??Social and

    May 1, 2009

  • CIM
    Two-Mass Vibrating Screens for High Tonnage Applications

    By Steve Massman, Edward Wipf, Gary Beerkircher

    "As mine size and tonnage continues to increase, material handling/processing equipment has also increased in size with 400 MT haul trucks, 2000 KW crushers, 12 M SAG/AG mills, 8.5 M ball mills, 3000

    Jan 1, 2017

  • CIM
    Training to Process Analysis Methods using a Gold Leaching Simulator

    By Jessica Egan, Daniel Hodouin, Mohammed Reza Khalezi, Steve Bellec, Claude Bazin, Carl Duchesne

    "A model for gold leaching was developed and implemented into a simulator. The simulator uses a description of the ore that is based on the mineral composition and precious metal content. The model ac

    Jan 1, 2008

  • CIM
    SUPASIM: A Methodology to Predict Plant Performance from Laboratory Data

    By C. J. Martin, M. P. Hay

    "A methodology was developed in the mid-1980’s to predict plant performance from standard laboratory flotation tests. The technique is based on a simple, empirical kinetics model, and is tailored for

    Jan 1, 2004

  • CIM
    Precious-Metal-Bearing Volcanogenic Massive Sulphide Deposits, Campo Morado, Guerrero, Mexico

    By Robert Cluff

    The Campo Morado precious-metal-bearing, volcanogenic massive sulphide district occurs in a Lower Cretaceous felsic volcanic sequence in a northerly trending belt in the Guerrero Terrane in northeaste

    May 1, 2006

  • CIM
    New Technology Provides Expanded Mine Design Options

    By Michael J. Kelly

    IAMGOLD?s Westwood project is the site for the largest, by volume, bored vent raise in North America. When completed, it will be the fifth largest bored worldwide in a single pass. This paper will re

    Oct 1, 2010

  • CIM
    Weak Rock Mass Span Design ? Best Practices

    By A. Ouchi

    This paper presents ground control best practices in weak rock environments including the "Unsupported" Weak Rock Updated Span Design Curve and awareness pertaining to the potentially detrimental effe

    May 1, 2009

  • CIM
    The Coarse Particle Recovery Process (4291cbe3-857c-4d99-bb64-06edaaa4dc85)

    By Gregg S. Hill, Bert J. Huls

    "This paper on coarse particle recovery (CPR) summarizes a process to capture coarse particles that are not recoverable by regular flotation. Several porphyry copper operations in the world operate an

    Jan 1, 2005

  • CIM
    Barrick Goldstrike Roaster Facility Engineering and Construction of the Goldstrike Roaster Facility

    By Ray Walton, Ron Colquhoun, Ken Thomas, Dwayne Fentie, Barney Burke

    "The new Roasting Facility at Barrick’s Goldstrike Mine in Nevada, U.S.A. was developed to process 12,000 tons per day of refractory gold ore. The process consists of crushing, dry grinding, roasting,

    Jan 1, 2001

  • CIM
    Energy Efficient Technologies for the Mining Industry

    By Bern Klein

    Motivation for Improved Energy Efficiency in Mining ? Canada potentially adopting Greenhouse Gas Emissions and Intensity Legislation in 2013 ? BC -Climate Action Plan and Energy Conservation Agreeme

    May 1, 2010

  • CIM
    Biological Monitoring and its Use in the Mining Industry

    By S. W. Stogran

    "Chemical and limited biological monitoring of mine and mill effluents are being used by regulatory agencies to monitor and control discharges to the environment. Amendments to the Federal Fisheries A

    Jan 1, 1994

  • CIM
    The use of Rubber Mill Liners in the Strathcona Concentrator Of Falconbrillge Nickel Mines Limited

    By F. G. Pickard

    "The Strathcona Concentrator is one of three concentrators presently operated in the Sudbury District by the Nickel Division of Falconbridge Nickel Mines Limited. Production commenced in 1968 at a mil

    Jan 1, 1974

  • CIM
    Rate Dependence of Flexural Tensile Strength of Laurentian Granite

    By F. Dai

    Due to difficulties associated with gripping in direct tension, indirect methods are commonly used to measure rock tensile strength. In this work, we adopt an innovative indirect tensile test method:

    May 1, 2009

  • CIM
    An integrated approach to modelling, design and optimisation of the flotation plant at the Red Dog concentrator

    By Barun Gorain, Andy Stradling

    "The traditional metallurgical scale-up techniques for flotation plants are based on lumped flotation rate constants, dimensionless hydrodynamic numbers and the use of safety factors. Once the plant h

    Jan 1, 2002

  • CIM
    Some Current Ideas on Saving Energy in Milling Operations

    By I. R. Ward

    "The need for energy conservation has been of increasing concern since the early 1970's, when the cost of petroleum based energy began to escalate rapidly and security of supply became uncertain. The

    Jan 1, 1981