Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The critical role of mine planners in the evolution of closure at BHP

    By J Heyes, R Getty, M Sanapala

    Closure is an inevitable part of the life cycle of every mine. Successful closure outcomes critically depend upon early and ongoing integration of closure planning and mine planning. Early and holisti

    Sep 18, 2023

  • AUSIMM
    Challenges and opportunities in accelerating electrification of underground heavy haulage equipment

    By J Webb

    The mining industry is relatively niche and complex compared to other global industries in its safety and operating environment. Whilst some of the technology required to decarbonise the mining indust

    Mar 29, 2023

  • AUSIMM
    The Mabilo Copper-gold-iron Deposit – A New Skarn Discovery in the Philippines

    By G Maude, R Ayres, R N McLean, N A. Reynolds

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Mabilo copper-gold-magnetite skarn deposit is located in southern Luzon in the Paracale

    Mar 18, 2015

  • AUSIMM
    BHP Billiton West Australian Iron Ore Geometallurgy - Past, Present and Future

    By M Flanagan, T Sua, B Wright, T Carroll, B Van Dijken

    "BHP Billiton (BHPB) West Australian Iron Ore (WAIO) conducts an extensive geometallurgy (geomet) program for its iron ore deposits in the Pilbara. The geomet program provides accurate information to

    Sep 29, 2013

  • AUSIMM
    Environmental Risk Assessment System for Typical Staple Industrial Solid Wastes

    By X Sun, L B. Zhou, H Yi, X Tang, P Ning

    The rapid industrialisation in China has consumed large amounts of various industrial raw materials, which has left behind large quantities of industrial solid wastes produced from the processes of mi

    Jul 10, 2012

  • AUSIMM
    The Importance of Collaboration between Designers and Contractors in Implementing a Design in Challenging Conditions

    By V Gumba, S Narendranathan, C Barker, R D. H Thomas, G P. Bungard

    This paper presents the positive outcomes on an EPCM project, which was undertaken in a challenging environment, whereby the design team had to generate a design with a number of stringent serviceabil

    Sep 18, 2012

  • AUSIMM
    Use of Robust Design Methodology for Production Scale Definition in Open Pit Mining

    By M A. González, J A. Romero, D L. Fuentes, C J. Poblete, O Abdrashitova

    "Robustness can be defined as the ability of a system to resist change without adapting its initial stable configuration. Robust design methodology, which is widely accepted in the manufacturing indus

    Nov 15, 2016

  • AUSIMM
    Managing Stress and Ground Condition Changes with Increasing Depth at Callie Underground Mine

    The Callie Underground Gold Mine (Callie) is owned by Newmont Asia Pacific and located 531 km north-west of Alice Springs in the Northern Territory. Historically, stopes have been mined util

    Nov 25, 2010

  • AUSIMM
    Improved sustainability through WHIMS Plant addition at Roy Hill

    By C Jenkins, J Jasper, Y Suryaputradinata, S Lozyk, M J. Hartmann

    The primary objective of mining companies is to function as a profitable business by delivering products that fit customer requirements in a safe and sustainable manner. Optimum resource utilisation i

    Nov 8, 2021

  • AUSIMM
    Everyone Has a Plan Until They Get Punched in the Mouth – Creating Trust, Commitment and Results in Tough Times

    By P Moynagh

    "A plan is critical but on its own it is a bit one dimensional, the three dimensions critical to success over the long-term, through changing economic, geological and management conditions are:the qua

    Nov 15, 2016

  • AUSIMM
    Advancing sustainability in pumping systems – a comprehensive methodology for calculating, monitoring and minimising power and water consumption

    By A Karrech, G M. Hassan, A Varghese, E Lessing, S Martins

    Pumps play a critical role in mining operations, and their energy consumption and environmental impact are significant. This paper addresses the need for a holistic approach to sustainable pump deploy

    Sep 1, 2024

  • AUSIMM
    The Need for Specification Development in Australian Road Tunnels

    By T Brown

    Australia is now committed to the most significant period of infrastructure investment since the 1960s and the current climate of project finance and public private partnership (PPP) model uncertainty

    Mar 8, 2011

  • AUSIMM
    The evolution of the Monty Geological model and the revolution of the on-site modelling and grade control processes

    By P Willems, J B. Crow, R Dale

    Open pit mining commenced at Lihir Island in 1997 and is undertaken using a conventional drill, blast, load, haul methodology. Unique challenges at the operation include an active geothermal system, a

    Mar 22, 2022

  • AUSIMM
    Development of a Real Time In Situ Zinc Analyser and Water Sampler ù Results From High Resolution Monitoring of a Stream Impacted by Acid Rock Drainage

    By R B. Wanty

    Historically, most investigations of biogeochemical cycling in acid rock drainage systems involved synoptic sampling over longer time periods (one sample per week or month) or intensive time series st

    Jan 1, 2003

  • AUSIMM
    Modelling of an Integrated Waste Storage Facility

    By P Edmondson, S Narendranathan, S Setchell

    The complexities of mining in current economic conditions, where ore extraction schedules are varied on a weekly basis so as to ensure constant supply to the process plant, can result in a number of s

    Jul 27, 2015

  • AUSIMM
    Optimising flotation plant operation by using a digital twin in the control room

    By R Tooher, S J. Oliver

    The operation of copper flotation circuit is a challenging task for the site metallurgists and plant operators. To optimise the performance requires meeting both grade and recovery objectives. These p

    Aug 29, 2018

  • AUSIMM
    Optimising the Telfer Pyrite Regrind Circuit – Effect of Dissolved Oxygen Demand

    By D R. Seaman, B Adamson, P Sharman, M McMahon

    "The Telfer processing plant commissioned its pyrite regrind and flotation circuit in August 2012. The circuit was designed to regrind pyrite concentrate to a p80 of <30µm then float a gold

    Oct 10, 2016

  • AUSIMM
    Morro do Ouro Geological Model with a Metallurgical View

    By Y Akiti, J Moller, E Esper, R Rugolo, A Pains

    "Morro do Ouro Mine is a high tonnage/low-grade mine located in Paracatu, Minas Gerais State, Brazil. The mines move around 55 Mt of ore per year at an average grade of 0.4 g/t. The auriferous mineral

    Sep 29, 2013

  • AUSIMM
    Application of sensor-based-sorting technology at pilot plants in South America

    By T Soares, P Esteves, C Senna, V Souto, E Dias

    Steinert provides a wide portfolio of Sensor Based Sorting (SBS) technologies, including the possibility to combine different sensor data in the development of the separation applications. This multi

    Nov 10, 2020

  • AUSIMM
    Open Cut Mine Machinery Automation – Going Beyond Global Navigation Satellite System with Locata

    By C Rizos

    Many of the ‘new paradigms in mining’ and notions of ‘sustainable mining’ have at their core the requirement for reliable, continuous centimetre-level positioning accuracy to enable increased automati

    Nov 22, 2011