Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The critical role of mine planners in the evolution of closure at BHPBy J Heyes, R Getty, M Sanapala
Closure is an inevitable part of the life cycle of every mine. Successful closure outcomes critically depend upon early and ongoing integration of closure planning and mine planning. Early and holisti
Sep 18, 2023
-
Challenges and opportunities in accelerating electrification of underground heavy haulage equipmentBy J Webb
The mining industry is relatively niche and complex compared to other global industries in its safety and operating environment. Whilst some of the technology required to decarbonise the mining indust
Mar 29, 2023
-
The Mabilo Copper-gold-iron Deposit – A New Skarn Discovery in the PhilippinesBy G Maude, R Ayres, R N McLean, N A. Reynolds
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Mabilo copper-gold-magnetite skarn deposit is located in southern Luzon in the Paracale
Mar 18, 2015
-
BHP Billiton West Australian Iron Ore Geometallurgy - Past, Present and FutureBy M Flanagan, T Sua, B Wright, T Carroll, B Van Dijken
"BHP Billiton (BHPB) West Australian Iron Ore (WAIO) conducts an extensive geometallurgy (geomet) program for its iron ore deposits in the Pilbara. The geomet program provides accurate information to
Sep 29, 2013
-
Environmental Risk Assessment System for Typical Staple Industrial Solid WastesBy X Sun, L B. Zhou, H Yi, X Tang, P Ning
The rapid industrialisation in China has consumed large amounts of various industrial raw materials, which has left behind large quantities of industrial solid wastes produced from the processes of mi
Jul 10, 2012
-
The Importance of Collaboration between Designers and Contractors in Implementing a Design in Challenging ConditionsBy V Gumba, S Narendranathan, C Barker, R D. H Thomas, G P. Bungard
This paper presents the positive outcomes on an EPCM project, which was undertaken in a challenging environment, whereby the design team had to generate a design with a number of stringent serviceabil
Sep 18, 2012
-
Use of Robust Design Methodology for Production Scale Definition in Open Pit MiningBy M A. González, J A. Romero, D L. Fuentes, C J. Poblete, O Abdrashitova
"Robustness can be defined as the ability of a system to resist change without adapting its initial stable configuration. Robust design methodology, which is widely accepted in the manufacturing indus
Nov 15, 2016
-
Managing Stress and Ground Condition Changes with Increasing Depth at Callie Underground MineThe Callie Underground Gold Mine (Callie) is owned by Newmont Asia Pacific and located 531 km north-west of Alice Springs in the Northern Territory. Historically, stopes have been mined util
Nov 25, 2010
-
Improved sustainability through WHIMS Plant addition at Roy HillBy C Jenkins, J Jasper, Y Suryaputradinata, S Lozyk, M J. Hartmann
The primary objective of mining companies is to function as a profitable business by delivering products that fit customer requirements in a safe and sustainable manner. Optimum resource utilisation i
Nov 8, 2021
-
Everyone Has a Plan Until They Get Punched in the Mouth – Creating Trust, Commitment and Results in Tough TimesBy P Moynagh
"A plan is critical but on its own it is a bit one dimensional, the three dimensions critical to success over the long-term, through changing economic, geological and management conditions are:the qua
Nov 15, 2016
-
Advancing sustainability in pumping systems – a comprehensive methodology for calculating, monitoring and minimising power and water consumptionBy A Karrech, G M. Hassan, A Varghese, E Lessing, S Martins
Pumps play a critical role in mining operations, and their energy consumption and environmental impact are significant. This paper addresses the need for a holistic approach to sustainable pump deploy
Sep 1, 2024
-
The Need for Specification Development in Australian Road TunnelsBy T Brown
Australia is now committed to the most significant period of infrastructure investment since the 1960s and the current climate of project finance and public private partnership (PPP) model uncertainty
Mar 8, 2011
-
The evolution of the Monty Geological model and the revolution of the on-site modelling and grade control processesBy P Willems, J B. Crow, R Dale
Open pit mining commenced at Lihir Island in 1997 and is undertaken using a conventional drill, blast, load, haul methodology. Unique challenges at the operation include an active geothermal system, a
Mar 22, 2022
-
Development of a Real Time In Situ Zinc Analyser and Water Sampler ù Results From High Resolution Monitoring of a Stream Impacted by Acid Rock DrainageBy R B. Wanty
Historically, most investigations of biogeochemical cycling in acid rock drainage systems involved synoptic sampling over longer time periods (one sample per week or month) or intensive time series st
Jan 1, 2003
-
Modelling of an Integrated Waste Storage FacilityBy P Edmondson, S Narendranathan, S Setchell
The complexities of mining in current economic conditions, where ore extraction schedules are varied on a weekly basis so as to ensure constant supply to the process plant, can result in a number of s
Jul 27, 2015
-
Optimising flotation plant operation by using a digital twin in the control roomBy R Tooher, S J. Oliver
The operation of copper flotation circuit is a challenging task for the site metallurgists and plant operators. To optimise the performance requires meeting both grade and recovery objectives. These p
Aug 29, 2018
-
Optimising the Telfer Pyrite Regrind Circuit – Effect of Dissolved Oxygen DemandBy D R. Seaman, B Adamson, P Sharman, M McMahon
"The Telfer processing plant commissioned its pyrite regrind and flotation circuit in August 2012. The circuit was designed to regrind pyrite concentrate to a p80 of <30µm then float a gold
Oct 10, 2016
-
Morro do Ouro Geological Model with a Metallurgical ViewBy Y Akiti, J Moller, E Esper, R Rugolo, A Pains
"Morro do Ouro Mine is a high tonnage/low-grade mine located in Paracatu, Minas Gerais State, Brazil. The mines move around 55 Mt of ore per year at an average grade of 0.4 g/t. The auriferous mineral
Sep 29, 2013
-
Application of sensor-based-sorting technology at pilot plants in South AmericaBy T Soares, P Esteves, C Senna, V Souto, E Dias
Steinert provides a wide portfolio of Sensor Based Sorting (SBS) technologies, including the possibility to combine different sensor data in the development of the separation applications. This multi
Nov 10, 2020
-
Open Cut Mine Machinery Automation – Going Beyond Global Navigation Satellite System with LocataBy C Rizos
Many of the ‘new paradigms in mining’ and notions of ‘sustainable mining’ have at their core the requirement for reliable, continuous centimetre-level positioning accuracy to enable increased automati
Nov 22, 2011