Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Mining Truck Operations in Association with Truch-Jig ApparatusThis paper describes a mine truck hauling process called "Truck Jigging" which is currently the subject of a process patent application.The investigation explores the production and cost adv
Jan 1, 1989
-
Practical Approaches to Managing Business Critical Water RiskBy A Tang, K Ringwood
"Water is increasingly being recognised as a material business risk that many companies are still not well-equipped to deal with. Despite a raft of water-risk focused initiatives, methodologies and gu
Nov 26, 2013
-
Resource Estimation and Grade Assignment - A Comparison Between Historical Production and Current Maxwell Mining Validation Case Study at Morning Star Gold Mine, Woods PointBy P Jackson, J Rea, M D. Goodz
The Morning Star Gold Mine has operated over a 101-year period, producing gold from narrow quartz veins and sulfide stockworks hosted mainly within a dioritic-gabbroic dyke. The deposit has been devel
Jan 1, 2008
-
Textural Characteristics of Porphyritic Intrusions Related to Cu-Au Mineralisation in the Endeavour 26 North and Endeavour 27 Deposits, Goonumbla, NSW, AustraliaThe Goonumbla district of central-west New South Wales, Australia, hosts four significant porphyry Cu-Au deposits that contain a combined probable ore reserve of 71.7 million tonnes at 1.2 per cent Cu
Jan 1, 1999
-
Application of Tagging Systems for Personnel and Vehicle Access ControlBy S Barrow, D Kent
Controlling the access of equipment, and people, has become more critical over the last few years for improving productivity and to meet safety responsibilities imposed by legislated obligations to ha
Jan 1, 2005
-
Understanding Trends in Performance of Open Cut Mining EquipmentBy G Lumley
PlannersÆ optimism (or maybe commercial necessity) means that most mine plans use equipment rates that are rarely achieved (Lumley and Beckman, 2009). This lack of understanding of what equipment actu
May 24, 2012
-
Mill Operators’ conferences – a 40-year retrospective and a vision for the futureBy P D. Munro
On the occasion of the 14th Mill Operators’ Conference and marking 40 years since the first one was held in Mount Isa in 1978, it is fitting to review the history of the Conference and its development
Aug 29, 2018
-
Mining in Morobe, Papua New Guinea – Impacts, Assurance and Self-determinationBy C Roche, G M. Mudd
The Morobe Province of central Papua New Guinea (PNG) has been mined for gold for nearly a century, although it is only in the past decade that large-scale modern mining commenced. The Hidden Valley g
Jul 16, 2014
-
No. 3 HeadframeTo finalise the arrangement and details of the headframe to be erected over the new No. 3 Shaft, the haulage and winding equipment requirements were first determined, then tentative designs were prepa
Jan 1, 1957
-
Coarse Gold Separation at BendigoBendigo Mining operates a 600 000 t/a comminution, gravity, flotation and leaching processing plant for the recovery of gold from their Kangaroo Flat Operation, in the Bendigo goldfields. The free gol
Aug 1, 2010
-
State-of-the-art of electroslag refining and challenges in the control of ingot cleannessBy G Stovpchenko, G Jianjun, L Medovar
Electroslag remelting (ESR) today and into the future, will still be the main process for producing high-quality ingots by suppressing segregation, not just refining chemical composition from impuriti
Jun 19, 2024
-
The evolution of the Cadia 40-foot SAG mill to treat the Cadia East orebody: a case study of incremental change leading to operational stabilityBy J Seppelt, B Akerstrom, A Rice, J Bubnich, T Waters
The Concentrator 1 plant at Cadia transitioned from Cadia Hill open pit to the Cadia East block cave ore body in 2013. As a result of this change, major plant upgrades were required to achieve the des
Aug 29, 2018
-
Challenges and Opportunities for Constructed Stream Diversions in the Bowen Basin, Central QueenslandBy K White, R Hardie, J Merritt, B Kirsch, R Lucas
Constructed stream diversions are a common element of mine sites across Australia. A review of constructed stream diversion performance in the Bowen Basin funded by the Australian Coal Association Res
Nov 26, 2013
-
High Quality Performance of Segmental Lined TunnelsTunnels are being built around the world using TBMs and prefabricated segments or in situ concrete as linings. Clients demand high quality of these linings to guarantee a long-term stability and densi
Jan 1, 1999
-
Unmanned Aerial Vehicles for Mine Environment MonitoringBy P J. Cullen, B P. Banerjee, S Raval
Continuous monitoring of mining impacts on the surrounding environment is a necessary sustainability criterion. Traditional monitoring approaches such as in situ sampling and airborne and satellite-ba
Nov 4, 2015
-
The Sams Creek Peralkaline Granite Hosted Gold Deposit, Northwest Nelson, New Zealand û Evolution of the Host Granite and Mineralising SystemBy K Faure
At Sams Creek a gold-bearing, peralkaline granite pophyry dyke intrudes Ordovician-Silurian metapelite and quartzite. The granite porphyry dyke has a thickness of up to 40 m, extends discontinuously f
Jan 1, 2004
-
Off to a Good Start with Lift #2: Drawbell Extraction ù NorthparkesBy M Lovitt, T Hewitt
The extraction of drawbells in Lift #2 at Northparkes Mines E26 orebody was achieved by single shot blasting, enabled through the use of electronic detonators. This paper discusses the designs conside
Jan 1, 2005
-
Predicting changes in static liquefaction susceptibility using cone penetration test resultsBy J T. Sharp, M A. Styler, D McGowan, P W. Mayne
Static liquefaction is a geotechnical hazard in mine tailings facilities. Soils that are contractive in shear are susceptible to static liquefaction. Tailings facilities are dynamic structures, typi
Jul 23, 2018
-
Sensitivity Analysis and the Mine Development DecisionTraditionally, the development of a mineral resource project goes through a fairly set pattern of decisions from what commodities to search for; where to look; how to locate; what are the reserves
Jan 1, 1983
-
Brisbane Airport Link Project – Design and Construction of the 26 m Span Kedron Caverns: Comparing Monitoring Data with the DesignBy I Coombes, M Trim, Y Sun, M McRae, A Spiegl, H Lagger, A Amon, P Barraclough, M Villeneuve
The Brisbane Airport Link Project (AirportlinkM7) includes the design and construction of more than 12.5 km of tunnels, with the Kedron interchange including four ramp tunnels that intersect with main
Sep 17, 2014