Production And Testing Of 600 Reinforced-Concrete Piles For The Central Bank Of IraqBy H. Meseck
The new building of the Central Bank of Iraq in Baghdad was footed in difficult underground conditions on more than 600 reinforced concrete driven piles, with cross-sectional diameters of 45 x 45 cm a
Jan 1, 1989
-
Analysis Of Load Tests Of Drilled Shafts. For Support Of Overhead SignsBy Roy H. Borde
The design of foundations to support overhead signs is primarily based on providing adequate resistance against horizontal wind loads. The typically used subgrade reaction model for the load-deflectio
Jan 1, 1988
-
Deep Foundations In Karst - Lessons Learned From I-40 Corridor Widening In Knoxville, TennesseeBy James L. Vinson
Wilbur Smith Associates (WSA) has provided planning, engineering and construction oversight assistance to the Tennessee Department of Transportation (TDOT) for three construction projects intended to
Jan 1, 2006
-
Overcoming Grouting Difficulties During Retaining Wall StabilizationBy Jared M. Green
This paper presents the wall stabilization design and implementation for a 541 linear ft masonry and concrete gravity-type retaining wall flanking the west perimeter of a 7.37 acre parcel in Bronx, Ne
Jan 1, 2011
-
O Street Anchored Precast Lagging And Soldier Pile Retaining WallBy John Wise
Significant movement to an existing slurry wall which serves as a retaining wall on 'O' Street in Southeast Washington, D.C. initiated the Department of Public Works for the District of Colu
Jan 1, 2003
-
Some Problems Encountered During Pile Installation - SynopsisBy [D. N. ] Naresh
During different activities pile installation like pile boring, concreting etc., it is likely that various problems, depending up on site condition may be encountered. There are possibilities that som
Jan 1, 1996
-
Cyclic Degradation Of Pile Foundations For Offshore Wind TurbinesBy Fabian Kirsch
Cyclic behaviour of axially loaded piles has been an issue since studies revealed that the capability to transfer skin friction into the ground is highly depending on the level and the number of load
Jan 1, 2011
-
Cyclic Axial Loading Of Offshore Piles - An Issue Of Concern?By Paul Doherty
Expansion of the global piling industry has been coupled with significant research efforts investigating the mechanisms controlling pile capacity. Static pile design has transitioned from total stress
Jan 1, 2009
-
Bearing Capacity Of Pile By Curve-Fitting Method ? SynopsisBy Z. Q. Zhou
It is the first worke in design of pile foundation to determine the carring capacity of single pile, and a static loading on site is considered to be the lost derect and reliable way. All values P and
Jan 1, 2010
-
The Effect Of Vertical Pile Loading On Subsequent Lateral BehaviourBy A. Lyndon
Vertical and lateral load tests were carried out on two 13 m deep bored cast-in-place instrumented piles, socketed into weathered sandstone. The first pile, 1200 mm in diameter, was loaded vertically
Jan 1, 1989
-
Deep Bored Piling in Soft Soil and High Lateral LoadsBy W. Sondermann
"AbstractThe construction of a distribution centre of minerals for a global mining and resources cooperation demanded the control of deformations and displacement of the stack reclaimer facilities on
Jan 1, 2014
-
Effect Of Installation On Quality Of Deep Mixed Soil Cement ColumnsBy Ali Porbaha
Rapid growth in the urban development requires continuous search for innovative technologies to construct complex infrastructure systems. Deep mixing is one promising construction technology that has
Jan 1, 2001
-
Permanent Canal Closures and Pumps Cofferdams – Support of Deep Excavation in Soft Ground Using the Open Cell Sheet Pile SystemBy Ryan Higbie, King Chin, Matthew Anderson, Mike Huggins, Rian Johnson, Dave Sinsheimer
"The Permanent Canal Closures and Pumps (PCCP) project is the capstone piece of New Orleans’ extensive hurricane risk-reduction system constructed following Hurricane Katrina. The project consists of
Jan 1, 2017
-
Recent Developments In Continuous Flight Auger PilingBy P. H. Derbyshire
The use of continuous flight auger piles has increased significantly in the U.K. to such an extent that it is now the most widely used method of constructing small diameter bored piles. This paper des
Jan 1, 1989
-
Bored Piles With Base Preloading By Grouting - The Polish ExperienceBy Bolestaw A. Ktosihski
Preloading of bored pile bases by grouting is an effective way of reducing foundation costs. The bearing performance of a pile may be considerably improved. Various techniques and devices are used. Pr
Jan 1, 2006
-
An Explosive Waterproofing Of A Riverbank - A Difficult Waterproofing Problem Solved By The Unique And Controversial Combination Of A Mining Technique (Blasting) And A Soil Improvement Technique (Jet-Grouting) - The ProblemBy M. Zanotto
[ ] A period of heavy rains caused the river Adda to flood parts of the Valtellina, one of the Alpine valleys of Northern Italy. The exceptionally high waters put under considerable strain the whole
Jan 1, 1992
-
Quality Assurance In Jet Grouting For A Deep Seated Slab In AmsterdamBy Thomas Passlick
By means of further developed machines and techniques and with growing experiences in jet grouting, the challenge of this building method becomes more and more complex. To keep the concerning risks as
Jan 1, 2006
-
Estimation Of Settlements Of Piles In GroupBy Kazimierz Gwizdala
In the paper the method for estimation of settlement of vertically loaded piles in a group is presented. The method is generally based on the hybrid procedure with non-linear solution for single piles
Jan 1, 2002
-
Analysis of the Uncertainty by the Random Finite Elements Method of a Vertical Load Test of a Piled Raft Founded in Tropical SoilBy Cristhian C. Mendoza, Renato da Cunha, Bernardo Caicedo, Max Barbosa
"Abstract This paper shows that a raft alone is not sufficiently appropriate to address the uncertainty of underlying soil variability; therefore, a piled raft system is a better option for mitigating
Jan 1, 2014
-
Slurry Wall Design For Hong Kong StationBy Stephen T. Young
The construction of Phase 2 of Hong Kong Station, its retail podium and International Finance Centre Two, the tallest building in Hong Kong, will be completed in the middle of 2003. This paper describ
Jan 1, 2003