Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
New Technologies For Quality Control Of Augered Cast-In-Place PilesBy Tracy Brettmann
In recent years the Augered Cast-In-Place (ACIP) Pile industry has seen a substantial increase in the quality control options available to Contractors, Engineers, and Owners. Quality control methods r
Jan 1, 2000
-
Non-Conventional Practice: Recent Case Histories of the use of Vertical Buttress Piles in Deep Excavation SupportBy Tony Brunger, Abid O. Adekunte, George Munteanu, David Greentree
A number of novel solutions have been proposed in recent years as alternatives to props and tie-backs in deep excavation support e.g. Adekunte (2008), Deschamps et. al. (2008), Adekunte et al. (2010)
Jan 1, 2018
-
Dynamic Horizontal Load Tests On Steel Pipe Piles Having Different Sizes In The Same Construction Site And Their AnalysesBy Eiji Kojima
In this research, dynamic and static load tests were performed on permanent foundation piles which had a pile length of 30 m, 800 mm in outer diameter and 15 mm in wall thickness. In this site the dyn
Jan 1, 2006
-
Anchoring Tall Buildings In Lower ManhattanBy Andrew Pontecorvo
The design of foundations for the tall buildings of lower Manhattan rely on the use of high capacity, rock anchors to resist overturning forces generated by lateral loads from wind, earth, water and,
Jan 1, 2011
-
Uncertainty And Bias In Evaluation Of LRFD Ultimate Limit State For Axially Loaded Driven PilesBy James A. Schneider
Selection of resistance factors within Load and Resistance Factor Design (LRFD) requires accurate assessment of uncertainty and bias in load and resistance. To date, many studies have focused predomin
Jan 1, 2009
-
Effective Dewatering Is More Than A Pump In The Hole - A Presentation At The Deep Foundations Institute Annual Meeting St. Louis, Missouri, November 1980By William J. Rothschild
Ground water at construction sites can be controlled by properly placed wellpoint dewatering systems. Care must be taken in planning cofferdams to have adequate space for and access to pumps, headers
Jan 1, 1984
-
High-Capacity Rock Anchors Provide Uplift Resistance For Concrete-Filled Steel Pipe Piles - A Case StudyBy James Weaver
During the past 16 years, the authors have successfully used high-capacity rock anchors installed inside open-ended pipe piles, driven to bedrock, to provide uplift and overturning resistance for vari
Jan 1, 2011
-
Evaluating Axial Elastic Pile Response From Cone Penetration Tests (The 2009 Michael W. O?Neill Lecture)By Paul W. Mayne
Axial pile performance can be rationally evaluated within an elastic continuum framework using field results from seismic piezocone tests (SCPTu). Adopting a versatile Randolph-type elastic pile model
Jan 1, 2009
-
Micropiles Prove Advantageous Over Drilled Shafts For Merchants Railroad Bridge RehabilitationBy Jeffrey R. Hill
To extend the life of the Merchants Railroad Bridge crossing the Mississippi River in St. Louis, MO, the owner implemented a rehabilitation and reconstruction project. The Merchants Bridge provides a
Jan 1, 2006
-
Construction Technique Used To Build The Drilled Shafts For The Victory BridgeBy T. Jason Hardell
The Victory Bridge project was contracted by the New Jersey Department of Transportation. The project included the construction of two 4000-ft precast segmental concrete bridges to replace the existin
Jan 1, 2005
-
Reflections On Our Industry - Foundation Vs GeotechnicalBy Arturo Ressi di Cervia
From the times when men in lacustrine environments drove wooden piles into the mud to elevate their dwellings, until the beginning of the twentieth century builders reacted to the conditions found in
Jan 1, 2000
-
What Causes Piles To Penetrate - IntroductionBy George G. Goble
In the middle of the nineteenth century, the dynamic formula appeared as a description of pile penetration during impact driving. The simplicity of use of the formula combined with the power of the en
Jan 1, 1995
-
Presentation #4 - Reflections On Pile Integrity TestingBy Joram M. Amir
Even when they are cased! [ ] In bored piles, as well as in drilled shafts, and in caissons too, defects will occur! [ ]
Jan 1, 2001
-
Design & Construction Of Pile Foundations For A Building Complex - A Case HistoryBy S. K. V. Avasarala
This paper presents a case history of design, prediction, probe and production pile driving monitoring, loading tests and installation of over 3,300 prestressed concrete piles for a building complex c
Jan 1, 1995
-
Disconnected Piled Raft Foundations Performance (DCPRF) With CushionBy Saeed Salehi Malekshah
In hybrid foundation system or piled raft foundation (PRF), the raft has adequate bearing capacity and piles are usually required to ensure overall stability of foundation and also to act as settlemen
Jan 1, 2011
-
The Seven Steps To Foundation RetrofitBy Javier Rodriguez
Adaptive re-use of existing structures in urban environments has become very common due to lack of available space in our cities and requirements for increased structural capacity. Often, it involves
Jan 1, 2006
-
Site Management Towards Pile Execution At Qurashiya BridgeBy Emad W. Shublaq
Contractual site plans are implemented for executing pile foundations (5 x 5) at segmental concrete bridge. Project schedule demands have forced the contractor to find out the most economical procedur
Jan 1, 1992
-
Evaluation of Crane Pad Performance on Partially Improved Ground Adjacent to a SeawallBy Paul J. Sabatini, Yazen A. Khasawneh
"A Demag CC1800 crawler crane was partially erected on crane mats adjacent to a seawall when settlements near a corner of the crane mat area were observed to be slightly larger than previously assesse
Jan 1, 2017
-
Special Foundation Technique For The Intersection Of Two Canals Near Magdeburg, Germany - Summary:By Wolfgang G. Brunner
The closing of the gap in the European waterway- net is one of the big and challenging traffic projects following the German reunification. The water canals in the North German plain connect the Rhine
Jan 1, 2000
-
"Comparative Pile Load Tests In Alluvial Sands" - I. IntroductionBy Lawrence F. Johnsen
In 1989, the Connecticut Department of Transportation authorized the evaluation and design for a reconstructed Route 1 bridge over the Quinnipiac River in the City of New Haven, Connecticut. The proje
Jan 1, 1993