The Evolution of Augered Cast-in-Place Piles
By Willie M. NeSmith, W. Morgan NeSmith, Alan Roach
"In 2013, Augered Cast-in-Place (ACIP) piles are a mature foundation technology throughout the United States. General guidelines for the design and construction of ACIP piles are available along with
Jan 1, 2013
-
Realization Of An Innercity Car Park By Means Of A Complex Underpinning Measure
By Robert Thurner
The underground car park "Admonterhof in the historical centre of Graz is an example for the technical and economical success of a complicated structural design using a concept on the basis of the obs
Jan 1, 2006
-
Nonlinear Spring Functions For 3-D Seismic Responses Of Structures On Piles
By Nien-Yin Chang
The contemporary seismic response analysis of structures using a finite element analysis code requires six elastic spring constants to address the six degrees of freedom ground/foundation contribution
Jan 1, 2007
-
Design and Installation of Helical Piles for Support of Bridge Pier Foundation
By David L. Borusiewicz, M. Suri Surendra
"Abstract Helical piles have been used as anchors and for supporting lightly loaded structures as a method of underpinning, etc in the past. Recently, helical piles are being used to support new struc
Jan 1, 2014
-
Behavior Of Excavation And Pile Foundations In Soft Bankok Clay
By D. T. Bergado
The uppermost subsoil profiles of the Bangkok plain can be divided into four layers, namely: weathered clay, soft clay, stiff clay, and dense sand layers. The soft Bangkok clay is a normally consolida
Jan 1, 2010
-
Consultants Can Be Safe, Too – A Collaborative Approach
By Brian FitzPatrick, Michael J. Weaver
Everyone has a role in site safety, even consultants. This paper presents a summary of how a geotechnical and environmental consulting firm, with field staff on construction and subsurface exploration
Jan 1, 2019
-
Load In A Drilled Foundation. Where Did It Go And When Did It Get There?
By Walter E. Vanderpool
Three drilled foundations for an elevated water-tank were instrumented, tested and monitored during construction and the first two years in service. One shaft was load tested by the Osterberg method.
Jan 1, 2004
-
Conference Papers - Conference Papers: Session 1 - Construction Of A Deep Basement On A Sloping Site In Glasgow: The Aurora Project
By H. Boghosian
This paper presents the design and construction of a deep basement in a steeply sloping site in glacial till in Glasgow city centre. Existing foundations, adjacent structures and services, in tandem w
Jan 1, 2006
-
The Use of the Expander Body with Cast in Situ Piles in Sandy Soils
By Mario A. Terceros H., K. Rainer Massarsch
"ABSTRACTThe Expander Body (EB) technology has been used successfully to increase the pile toe capacity of bored piles in loose to medium dense soil. An important advantage of the EB system is the abi
Jan 1, 2014
-
Ground Improvement for the Distressed Earth Bund Using Stone Column - A Case Study
By M. Kumaran, A. Vetriselvan, A. Purantharan
"This paper presents a case history of evaluating the stability of a distressed earth bund and rectification measures carried out. A 5.45 km long, 7m high earth bund for drinking water storage was con
Jan 1, 2017
-
-
Insitu Ground Reinforcement Techniques
By Peter J. Nicholson
The methods of reinforcement to be discussed in this paper are all insitu methods, ones that can be used on the soil structure as it exists in the ground, and do not rely on excavation and replacement
Jan 1, 1991
-
Hollow Core Bar Micropiles - Design Parameters Interpreted From 404 Load Tests
By Jesús E. Gómez
This work is a continuation of a paper presented in the 32nd DFI Annual Conference, Colorado 2007, titled ?Hollow Core Bar Micropiles - Design parameters interpreted from 260 load tests.? The first pa
Jan 1, 2008
-
-
Impact And Ramifications Of Setup For Pile Foundations
By Cory G. Rice
A significant portion of the piling industry has long felt relying on soil setup to gain the required capacity is a complexity that would rather not be dealt with. Instead, the pile are driven to the
Jan 1, 1992
-
Design Of The BMIP Boat Section - Introduction
By Kenneth Pidgeon
The Boston Marine Industrial Park (BMIP) Boat Section, which is part of contract C04A2 of the Central Artery/Tunnel (CA/T) project, is currently under construction in South Boston, Massachusetts (Fig.
Jan 1, 1994
-
Recent Experience With The Omega Pile And New Applications - Synopsis
By Maurice Bottiau
The recent evolution of the piling market clearly shows a growing demand for screw piles with soil displacement. The recently developed Omega Screw pile ful-fill these new expectations, combining the
Jan 1, 1996
-
Pile Design, Testing, And Installation For A Gated Dam ? Synopsis
By B. H. Moore
The opportunity to evaluate the pile design procedures used on a major project is an infrequent occurrence. It is even more infrequent that the project involves piles with significant tension and hori
Jan 1, 2010
-
Lateral Load Testing Micropiles To Evaluate The Impact Of Threaded Joints And Casing Embedment On Short Micropiles In Shallow Rock
By J. Brian Anderson
Jointed micropiles were investigated to support bridge foundations where shallow rock was present. In this application, micropiles would have some amount of unsupported length, and would be subject t
Jan 1, 2011
-
Holding Back The Watchung Mountains
By Ryan C. Linthicum
A system of steel sheeting and multiple levels of high capacity double corrosion protected soil anchors were used to restrain a major slope failure that occurred at the base of the Watchung Mountains
Jan 1, 2003