Search Documents

  • CIM
    Terraflow: A Cost-effective Alternative Binderin Backfill Application

    By Ike Isagon

    Outline 1.Background Sudbury Backfill Operations 2.Alternative Binder 3.Alternative Binder Trial Process Flow Diagram ?Laboratory Results ?Plant Trial ?Final Evaluation and Approval ?Manageme

    Nov 1, 2011

  • ISEE
    Trench Blasting in Close Proximity to Existing Utilities in Ultra Metamorphic Rock

    By Tom Treleaven, Andrew Williams

    The town of Greenwich, CT, an exclusive suburb of New York City awarded several contracts for the installation of sanitary sewer in the North Mianus section of town. The Valley Road section was the mo

    Jan 1, 2004

  • CIM
    Canadian Diamond Industry: An Overview

    By Robert Boyd

    The Diamond Markets ? Supply has continuously increased over the past 25 years ? However, global supply is expected to drop by 1 to 2% by 2015 ? Demand Driven Market ?Demand is expected to grow 3%

    May 1, 2006

  • CIM
    GET: A Function for Preferential Site Selection of Additional Borehole Drilling

    By M. Sharafodin, A. A. Hassanipak

    Abstract - The essential aims of additional borehole drilling are to improve the reliability of grade and tonnage estimates in each reserve class and to increase ore tonnages. The "GET" function prese

    Jan 1, 2004

  • DFI
    Izmit Bay Bridge Crossing: Integrated Multidisciplinary Approach Reduces Risk And Lowers Overall Project Cost For Bot Bridge Consortium

    By Jacob Chacko

    The Izmit Bay bridge, a 3-km-long suspension bridge crossing of Izmit Bay, Turkey is planned to be constructed in one of the most seismically active places in the world. The site, which has the poten

    Jan 1, 2011

  • IIMP
    Evaluación de las alternativas de planeamiento a largo Plazo en la Mina Toquepala

    By Tomás Gonzáles

    El presente trabajo describe la metodología usada para evaluar las estrategias de las alternativas del planeamiento a largo plazo en la explotación del mineral y el lixiviable en la Mina Toquepala.

    Aug 25, 2002

  • CIM
    Design, Construction and Commissioning of Gold Tailings Plant at Mazowe Mine, Zimbabwe

    By Peter Makuvise, Alain M. Bantshi

    "The Mazowe Gold Mine is managed by Metallon Gold (Zimbabwe) and is situated in the west-central part of the Harare greenstone belt. Orebodies here generally comprise shear zones which are in-filled w

    Jan 1, 2017

  • AUSIMM
    The Fall and Rise of the Feasibility Study

    The theme of this paper is the development of-the project feasibility study which includes discussion of the work which is carried out in preparing the project feasibility study, the necessary eval

    Jan 1, 1990

  • SME
    Design-Build of the Lake Hodges to Olivenhain Pipeline Tunnel and Shaft

    By Jon Y. Kaneshiro, Sean A. Menge, M. Luis Piek, Brian Barker

    The Lake Hodges to Olivenhain Pipeline project is part of a 40-megawatt pumped storage project linking two reservoirs as part of the San Diego County Water Authority’s $939 million Emergency Storage P

    Jan 1, 2007

  • AUSIMM
    Good Delay Timing-Prerequisite of Efficient Bench Blasts

    Variations in delay timing can have a marked influence on blasting effectiveness and, hence, on total production costs. In single-row bench blasts, delay firing is invariably more effective than simul

    Jan 1, 1977

  • ISEE
    Determination of Blast Vibration Limits by Direct Strain Measurement

    By Adrian Moore, Alan Richards, Andrew Brodbeck

    Structural blast vibration limits should be based on the strength of the structure, the stress induced by blasting, and a responsible factor of safety. In this paper a methodology that uses direct str

  • SAIMM
    Rapid Installation Of Support In A Partially Raise Bored Shaft Using Sky Jacks. ? Synopsis

    By D. Strachan

    Installation of support in known poor ground intersections during reaming operations requires rapid access to stabilize the shaft wall and thus to prevent the loss of the shaft through scaling. This i

    Jan 1, 2009

  • AUSIMM
    Chemistry of Cyanidation II: Complex Cyanides of Zinc and Copper

    By Woodcock J. T

    During the dissolution of gold in fully aerated cyanide solutions the CN ion is the active agent, and consequently the usual method of evaluating the dissolving power of such solutions is to determine

    Jan 1, 1950

  • DFI
    Lateral Pile Load Testing Under Cyclic Loads

    By Dan Brown

    This paper presents a case study of a cyclic lateral pile load testing program performed on two 18-in square prestressed concrete piles (PSC) in Savannah, Georgia. The load test program was developed

    Jan 1, 2003

  • SAIMM
    Emerging Steel And Specialty Steel Grades And Production Technologies ? Impacts On The Selection And Use Of Ferroalloys

    By R. Dippenaar

    The emergence of new steel grades is largely driven by the need to produce high quality steel at a competitive price. The principal aims are to attain ultra-high purity, (especially low interstitial e

    Jan 1, 2004

  • SAIMM
    Role Of Operational Support In Ramp-Up Of The FeNi-II Furnace At Pt Antam In Pomalaa

    By E. J. M. Jahnsen, I. Jauhari, T. Badrujaman, F. A. Stober, B. O. Wasmund, L. R. Nelson, T. Miraza, J. M. A. Geldenhuis, A. Taofik Hidyat

    The role of dedicated operational support in the ramp-up and stabilisation of the FeNi-II furnace for ferro-nickel production at PT Antam?s smelter located in Pomalaa, Indonesia is described. The fur

    Jan 1, 2007

  • SME
    Study on Strata Control Based on Pillar Stress and Surface Cracks in Shallow Multi-Seam Mining

    In order to ensure safe mining and reduce surface damage in shallow multiple-seam mining, the failure characteristics of interburden strata with different coal pillar offset distances between pillars

    Jul 28, 2020

  • ABM
    Influence Of Metallic And Eaf Type On Specific Consumtions And Productivity

    By Jorge Madias

    O trabalho está baseado na análise de dados de perto de 200 fornos elétricos a arco de diferente design: convencional, de corrente contínua, de carcaças gémeas, com preaquecimento de sucata no transpo

    Oct 30, 2017

  • AUSIMM
    Some New Ideas on the Age and Origin of the Etheridge Goldfield, Queensland, and their Exploration Implications (495c9435-8309-4f05-8133-4703aafde3c7)

    Close spatial relationships between the deposits of the Etheridge Goldfield (23 000 kg of bullion) and various regional geological and geophysical features suggest that genesis of the ore deposits was

    Jan 1, 1981

  • DFI
    Installation And Performance Characteristics Of High Capacity Helical Piles In Cohesive Soils

    By Mohammed Sakr

    This paper presents the results of a full-scale axial compression and tension (uplift) testing program executed on large-capacity helical piles installed in very stiff to very hard clay till soils (i.

    Jan 1, 2012