Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Calibrating LaModel for Subsidence

    By Keith A. Heasley, Jian Yang

    "LaModel uses a laminated overburden boundary-element model and can calculate not only seam-level stresses and displacements but also surface subsidence for thin tabular deposit such as coal seams (He

    Jan 1, 2016

  • SME-ICGCM
    Modeling the Effect of Bolts on the Behavior of Rock Pillars and Associated Insights on Rib Reinforcement

    By Gabriel Walton, Sankhaneel Sinha

    "Rib failures are a major hazard in underground mining. When pillars are subjected to loading, extensile cracks are generated parallel to the excavation boundary, which can manifest as rib falls. A co

    Jan 1, 2017

  • SME-ICGCM
    Design Procedure for Arch Canopies for Rehabilitation of High-Roof-Fall Areas

    By Richard A. Allwes

    A procedure is presented for the design of an arch canopy for the application of rehabilitating a high-roof-fall area. This procedure is specifically developed for evaluating an unbackfllled arch cano

    Jan 1, 1986

  • SME-ICGCM
    Investigation Into Abnormal Surface Subsidence Above a Longwall Panel in the Southern Coalfield, Australia

    By Winton J. Gale

    The subsidence over a longwall panel at Tahmoor Mine in the Southern Coalfield of NSW, Australia, was found to be approximately twice the size it had been in previous measurements. An investigation in

    Jan 1, 2011

  • SME-ICGCM
    Development Of A Statistical Technique For Assessing Sandstone Escarpment Stability

    By Hamid Maleki

    During the last decade, a significant amount of research has been conducted by Energy West Mining Company, government agencies, academia, and consulting companies to develop predictive tools for asses

    Jan 1, 2000

  • SME-ICGCM
    A New Rock Bolting Concept For Underground Roadways

    By G. Skybey

    The Skybolt is a new bolt concept, point anchored with resin in large diameter holes of specific sizes 38 mm and 45 mm. The new design achieves the optimum annular spacing required for mixing the resi

    Jan 1, 1992

  • SME-ICGCM
    Recent Innovations for Slope Development

    By Tim Burgess

    Patton Mining, LLC and J.H. Fletcher Company recently collaborated and mechanized the sometimes hazardous, and always labor intensive, process of installing standing steel supports during the construc

    Jan 1, 2011

  • SME-ICGCM
    Quality Management For Grouted Rockbolts

    By Dieter Wittenberg

    The successful extension of the applications in which rockbolts can be used in the German coalmining industry is, because of the very great raining depth combined with a high degree of stress in the n

    Jan 1, 2000

  • SME-ICGCM
    Rockbolting For Highly Stressed Roadways

    By Holger Witthaus

    The conditions of great mining depth and multi-seam¬longwalling require a special method of rockbolting, It can be described as a control loop which is based on the elements of planning, drivage and m

    Jan 1, 2000

  • SME-ICGCM
    Numerical Modeling as a Tool to Predict Pillar Condition and Assist in Mining Sequencing

    By P. Palmer

    Using 3D numerical modeling as a tool to predict rock behavior during mining extraction is still an uncommon practice at many underground operations. This paper will discuss how 3D numerical models we

    Jan 1, 2005

  • SME-ICGCM
    Numerical Modeling of the Pillar Confinement with Backfilling Material in Room?and?Pillar Coal Mining

    By Andre Zingano

    It is known that the backfilling confinement increases the pillar strength and also reduces the rib lateral displacement. With backfilling, it is possible to increase the room-and-pillar mining recove

    Jan 1, 2011

  • SME-ICGCM
    Pillarless Longwall Mining For Multiple Seams

    By Victor V. Nazimko

    Longwall mining technology without interpanel pillars is feasible from a geomechanical point of view. A set of pillarless longwall layouts are proposed including tailentry pillar recovery, headentry p

    Jan 1, 1994

  • SME-ICGCM
    Three Dimensional Numerical Modelling Of Effects Of Subsidence On Escarpments

    By Leigh J. Wardle

    Significant coal reserves in New South Wales lie under areas with steep topography such as valley slopes and cliffs. Subsidence predictions are difficult to make for these locations as existing empiri

    Jan 1, 1992

  • SME-ICGCM
    The Failure Mechanism and Control Technology of Coal Wall of a Large Mining Height Panel

    By Dezhong Kong, Jaichen Wang, Shengli Yang

    "The stability control of longwall coal face is the key technology of large-cutting-height mining method. Therefore, a systematic study of the factors that affect coal face stability and its control t

    Jan 1, 2015

  • SME-ICGCM
    Mobile Roof Support For Retreat Mining

    By H. Gene Wilson

    Mobile Roof Supports (MRS) look similar to a longwall shield on crawler tracks. The MRS units offer a safe, productive method of extracting the 40% to 60% product left normally unrecovered in room and

    Jan 1, 1990

  • SME-ICGCM
    Stooping Low Safety Factor Pillars at Goedehoop Colliery - 12 Months Later

    By Gift Makusha

    Pre-feasibility work at Goedehoop Colliery indicated that stooping of the undersized pillars could be undertaken safely and economically. In light of the findings a decision was taken in may 2003 to u

    Jan 1, 2004

  • SME-ICGCM
    Control Technology For Roof Drill Operators

    By Bob Thomas

    The roof drill operator productivity can be enhanced by the introduction of control technology The operators control station can be improved by considering human factors such as handle forces and cont

    Jan 1, 1999

  • SME-ICGCM
    A Method for Quantitative Void/Fracture Detection and Estimation of Rock Strength for Underground Mine Roof

    By Syd Peng

    In designing a proper roof support system, one must know the features of roof geology in advance of mining. The drilling parameters obtained during normal roof bolt installation cycle can provide a l

    Jan 1, 2005

  • SME-ICGCM
    Case Study of Roof Behaviour and Conditions for Longwall Face Recoveries at Beltana No. 1 Mine, Australia

    By David Hill

    Over the last decade, Beltana No.1 Mine has generally been Australia?s most productive longwall operation, with a ROM output of 7.2 Mt in YEJ2007. Characteristically favorable roof conditions and low

    Jan 1, 2011

  • SME-ICGCM
    Using Foaming Grout to Stabilize a Ventilation Raise in Very Poor Rock

    By John Magyar

    Special foamed cements were used to stabilize and secure caving ground in a newly-reamed 12.5-ft diameter underground ventilation raise. Two zones of very poor Rock Mass Rating (RMR) material were enc

    Jan 1, 2005