Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Better Fragmentation Through Team work At Dos Pobres Mine Safford, Arizona

    By Denard Brandt, Isidro Martinez, Greg Baker, Laura Slattery, Teddy French

    The Dos Pobres Mine is a copper oxide heap-leach mine located near Safford, Arizona. Mine production is 180,000 tons (163,293 tonnes) per day with a stripping ratio of 2:1. During the startup phase of

    Jan 1, 2010

  • ISEE
    Peculiarities of Drilling and Blasting in Underground Small-Scale Mines

    By Patricio González Santis, Jacopo Seccatore

    This paper documents drilling and blasting activities from gold mining in Ecuador and Chile. First, are described the outdated and often non-rational techniques employed by miners, to provide a genera

    Feb 1, 2020

  • ISEE
    Journal: 20th Annual Photo and Art Contest - Honorable Mention "Snoqualmie Pass"

    By Corry Goumans

    Photos 1 - 4 – Chris Elliott is a rock slope supervisor on a construction project east of Seattle, Washington. His job is to look after a “two man” scaling crew working on the rock bluffs some 300 fee

    Jan 1, 2014

  • ISEE
    EUExcert a European Initiative for Improved Explosive Competence

    By Roberto Folchi, Hans Wallin, Mara Battocchio

    An understanding of explosives science and technology, and the competence to harness it is central to maintaining Explosives capability, national security, and in sustaining a competitive industry. A

    Jan 1, 2013

  • ISEE
    AN Railcar Derailed Debris Collection – Data Analysis Update

    By Brandon Fryman, Josh Hoffman, Rhys Baker

    A post-detonation debris collection project was led in conjunction with a large ammonium nitrate (AN) railcar detonation conducted by the Department of Homeland Security-Transportation Security Admini

    Feb 1, 2020

  • ISEE
    Quake, Quarry, or Quack

    By Dominic C, Gregory B. Poole

    On December 12, 2018 at 4:14 AM EST, an earthquake registering a 4.4 magnitude on the Richter Scale occurred in central Tennessee. According to a survey posted on the USGS website, this earthquake was

    Feb 1, 2020

  • ISEE
    Blast design optimization system to improve mining downstream operations by adapting the explosive energy to the rock mass based on drill monitoring data

    By P. Couceiro, J. Navarro

    A new methodology to perform selective blast designs by adapting the explosive energy, hole by hole (or in the hole), to the rock properties as a combination of their strength properties through the X

    Jan 1, 2024

  • ISEE
    Inco Limited Upper Blind Slot Raise 8M (25') to 12M (40') Longhole Carbide Drilling (L.C.D.) Method

    By Steven Richardson, E A. Cameron, Reza "Ray" Jambakhsh

    This paper outlines the design and implementation of a method to use Long hole Carbide drilling to blast an "Upper Blind Slot Raise" in the range of 12m (40 ft).

    Jan 1, 1992

  • ISEE
    Occidental's Resorts 7 and 8 Blasting Design and Results

    By Thomas E. Ricketts

    Occidental Oil Shale, Inc. constructed two commercial-sized modified in situ (MIS) retorts, Retorts 7 and 8, at its Logan Wash Oil Shale Mine in February and April 1981, respectively. One of the prima

    Jan 1, 1984

  • ISEE
    Considerations in Pre-Split Blasting for Mines and Quarries

    By J Lyall Workman, Peter N. Calder

    "Presplitting is a technique mines and quarries may use to produce high quality final pitwalls. Damage from backbreak can be minimized, thereby insuring the final pit walls standat the designed angle.

    Jan 1, 1993

  • ISEE
    A Mine-to-Crusher Framework for Aggregate Operations – Part 3

    By Diogo Fonseca, José Manuel, Nuno Fernandes, Francisco Monteiro, Andrew Palangio, Blessing Taiwo

    This study aims to enhance the integration between blasting and primary crushing operations in quarrying by optimizing the size of oversize and bypass fragments, ultimately reducing energy consumption

    Jan 26, 2026

  • ISEE
    Resolution to a Conflict Regarding Blasting Near a High Pressure Pipeline

    By Randall Wheeler

    In early 2008 we were asked by a quarry to become involved in a conflict with a pipeline company concerning blasting near one of their underground high pressure gas lines. The pipeline company, withou

    Jan 1, 2011

  • ISEE
    Flyrock Elimination Program Part 1: Corporate Initiative

    By Scott Scovira

    All flyrock incidents have the potential to result in injuries or fatalities that can result in loss of company reputation, license to operate with clients, and bear the exposure to high cost liabilit

    Jan 1, 2012

  • ISEE
    Safety Challenges of the '90s

    By Milos J. Bila

    I would like to discuss today several safety topics that we at Nobel feel are going to be particularly critical to all of us who are involved in the manufacturing, transportation, storage and use of c

    Jan 1, 1992

  • ISEE
    Controlling Air Blast with Drone 3D Profiling

    By Tyler Rockley, Cara Rosen

    Blasting at a granite quarry in eastern Maryland produces elevated air blast readings that can fall into the cautionary zone for the state of Maryland environmental regulations on a semi-regular basis

    Feb 1, 2020

  • ISEE
    A Practical Approach for Blasters to Determin The Optimal Bench Blasting Conditions

    By Gungor Tuncer, Ali Kahriman, Abdulkadir Karadogan

    In the bench blasting, the realisation of an economic, and safe blasting is only possible with a reliable blasting design on condition that considering all sequential activities such as drillingblasti

    Jan 1, 2004

  • ISEE
    Integrating Rock Impedance and Blast Design: A Mode-Based Approach to Fragmentation Efficiency and Nox control

    By Francisca Tapia, Jorge Blázquez, Paulo Couceiro, Patricio Vergara, Luis Manriquez, Luis Martínez, Juan Navarro

    Efficient energy transmission is critical for effective rock fragmentation in open-pit blasting. However, in zones with highly fractured or soft rock, mismatches in acoustic impedance between the expl

    Jan 26, 2026

  • ISEE
    Design Software for Electronic Detonators

    By Kia Riihioja, Mike Higgins

    A major difference between electronic and pyrotechnic detonators is that, in almost all but the simplest of blast layouts, computer software is required to plan a blast using electronic detonators. Wh

    Jan 1, 2004

  • ISEE
    Application of GEM (Geologic Element Motion) to Heave Modeling of Cast Blasting, Mineral and Iron Ore Blasting

    By Stewart A. Silling, D. Lynn Gordon, C. Mick Lownds, Dale S. Preece, Ali Bhuiyan, Patrick R. Bowden

    Blast heave modeling and prediction utilizing the new discrete element model, GEM, that treats rock as elements with alternating arcs and line. Explosive loading of GEM elements is accomplished by uti

    Feb 1, 2020

  • ISEE
    Airblast Reduction from Effective Blasthole Stemming

    By Duane Skidmore, Francis Otuonye, Calvin J. Konya

    Proper stemming not only affects the rock breakage process, but also controls the unwanted side effects of blasting such as airblast, ground vibration, and flyrock. Little research has been conducted

    Jan 1, 1982