Load Test On A Model Pile Driven Into Sand ? SummaryBy A. Mazzucato
This paper presents the experimental results of driving and load tests on an instrumented pile driven into a test pit filled with fine homogeneous sand.
Jan 1, 2010
-
Gallery Towers, Melbourne: Successful Approach To Difficult Piling Contract ManagementBy Mario Aiezza
This paper outlines the results of a relationship developed during the design and construction of the foundations for the Gallery Towers project in Melbourne. Both the builder and the piling contracto
Jan 1, 2002
-
Defective Piles In Clay - SynopsisBy S. Narasimha Rao
Bored cast in situ piles are highly susceptible to construction defects like necking, discontinuity in concreting, poor compaction of concrete, improper end bearing condition due to inadequate cleanin
Jan 1, 1996
-
Advances In Seismic Design Considering Soil- Structure InteractionBy Y. C. Han
The advances in seismic design considering soil-structure interaction or soil-pile-structure interaction are described using a substructure approach. The nonlinearity of soil is considered approximate
Jan 1, 2010
-
Enhancements To The FHWA Deep Foundation Load Test DatabaseBy Carl D. Ealy
Work is being done to web enable the FHWA Deep foundation Load Test Database. Originally designed to function in the client server environment via modem, access to the database both for data maintenan
Jan 1, 2002
-
Practical Experiences On Pile Dynamic Measurement In Shanghai - SynopsisBy J. Pei
The studies of dynamic measurements using stress wave theory has commenced in China. This paper introduces some practical experiences using "CASE method" in Shanghai showing applications of dynamic me
Jan 1, 2010
-
Design Development & Installation Of Glass Fibre Reinforced Polymer (GRP) "Soft Eyes" In Diaphragm Wall Reinforcement Cages.By Paul M. Wiltcher
This paper discusses how benefits in engineering design can be achieved from combining existing GRP concrete design guidelines with carbon steel design codes primarily made possible due to the increas
Jan 1, 2006
-
Deep and Extra Deep Diaphragm Walls in Shanghai – Increasing Demand for Infrastructure in Megacities Drives the Requirement of Increasing Depth for Diaphragm WallsBy Wu Jie Mei, Li Yao Liang, Franz-Werner Gerressen, Arthur Bi
Diaphragm walls (D-walls) are known as underground structural elements commonly used for retention systems and permanent foundation elements. In addition, they are also quite often used as deep ground
Jan 1, 2018
-
Double Rotary CFA Piles: Performance In Cohesive SoilsBy Michel Bustamante
The occasional substandard performances of continuous flight auger in particular soil conditions have prompted the drilling rig manufacturer to improve the standard CFA in order to reduce its negative
Jan 1, 2002
-
Evaluating Axial Elastic Pile Response From Cone Penetration Tests (The 2009 Michael W. O?Neill Lecture)By Paul W. Mayne
Axial pile performance can be rationally evaluated within an elastic continuum framework using field results from seismic piezocone tests (SCPTu). Adopting a versatile Randolph-type elastic pile model
Jan 1, 2009
-
Davison Freeway Reconstruction Utilizes Design/Build Retaining WallsBy Thomas C. Anderson
Thirty-four retaining walls are part of the $46 million upgrade of a 1942 depressed highway in Highland Park, Michigan near Detroit. This project will close a missing link between two newer roadways,
Jan 1, 1999
-
Installation And Performance Of Interlocking Drilled Shaft And Tieback Shoring System - SummaryBy Alec C. Bloem
A 55' deep excavation encompassing almost a city block in London, Ontario required a lateral earth retention system to provide both temporary excavation support and a permanent groundwater cut-of
Jan 1, 1991
-
Bore Pile Stabilization Issues in Offshore Marine WorksBy Nuno Cruz, Saúl Rodríguez
"When executing offshore bored piles there are several specific factors and problems to consider in order to guarantee excavation stability. One of the methods employed to carry out this type of work
Jan 1, 2017
-
Advances in Desaturation of Sandy Soil to Mitigate the Liquefaction HazardBy Dhanaji S. Chavan, Thallak G. Sitharam
"It is well known that sites comprising of saturated loose sand undergoes large deformations, due to liquefaction, during seismic shaking. To cope with this, different mitigation techniques such as vi
Jan 1, 2017
-
Analysis Of Piled Raft Foundation ? SynopsisBy Gandhi
Piled raft foundation under uniformly distributed vertical loads has been analyzed using Finite Element Method. The soil is considered to be linear elastic, isotropic, homogeneous. The raft,pile and t
Jan 1, 1996
-
Brightman Street Bridge Replacement ProjectBy Arturo Ressi di Cervia
Construction of the drilled shafts for the Brightman Street Bridge Replacement Project were not only challenging due to working over the water but were also challenged by changed soil conditions, conc
Jan 1, 2003
-
Evaluation Of Achievable Column Diameter In Jet GroutingBy Chu E. Ho
Key variables that govern the jet cutting process are examined based on fundamental theories of jet hydrodynamics and soil mechanics. Under normal conditions of jet grouting operations, lift speed and
Jan 1, 2006
-
Excerpts From Drilled Shafts: Construction Procedures And Design Methods - General ApproachBy L. C. Reese
? Good construction and inspection presumed. ? Capacity-computation factors are independent of construction method. ? To account for variable or uncertain site conditions, anticipated construc
Jan 1, 1988
-
Non-Linear Analysis Of Large Pile Groups For The New Wembley StadiumBy S. Hardy
The paper describes state of the art non-linear analyses of the pile groups that were employed during the raising of the 133m high triumphal arch which forms the centre piece of the new Wembley stadiu
Jan 1, 2006
-
Research on the Influencing Factors of Driving Super Long Piles in Bohai GulfBy Liu Run, Jia Zhao-lin, Yan Shu-wang
"Piles with diameter larger than 2m in engineering can be defined as large diameter pile, and piles used for oil platform foundation in Bohai Gulf, are usually over 100m long and 2m in diameter. Such
Jan 1, 2014