Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Candego Property of East Macdonald Mines Ltd.

    By L. Wolofsky

    "The Candego property is in Boisbuisson and Christie Townships, Quebec, about 13 miles south of Marsoui, a village on the north coast of the Gaspe peninsula, 80 miles east of the railhead at Matane. I

    Jan 1, 1949

  • CIM
    Improving Flotation Circuit Performance with a Large Mechanical Flotation Cell

    By R. Grau

    "After commissioning and start-up of the first 500m3 TankCell® flotation cell in 2014, the over 300m3 mechanical flotation cells have earned their place in large-scale flotation operations. These 500

    Jan 1, 2019

  • CIM
    Bubble Surface Area Flux and Performance in Laboratory Flotation Testing

    By J. Álvarez, J. Mesías, C. O. Gómez

    "Operations routinely run flotation tests in laboratory mechanical cells to determine adjustments to plant operation based on feed flotation response or the effect of new reagents and dosages. The met

    Jan 1, 2016

  • CIM
    Hard Rock Tabular Excavations: Historic Rock Engineering Solutions and Future Challenges

    By D. F. Malan

    "This document highlights some of the topical problems associated with the design and support of deep tabular excavations in hard rock. The displacement discontinuity boundary element method has been

    Jan 1, 2015

  • CIM
    Reaction Kinetics of Iron Oxides in Ok Tedi Magnetite Skarn Ore

    By Mary Kama, Kaul Gena

    "Magnetic skarn ore (MSO) is one of the major copper bearing ore extracted by the Ok Tedi Copper Mine in Papua New Guinea. Copper minerals are recovered by flotation while the iron not associated with

    Jan 1, 2016

  • CIM
    Mixed Integer Programming Models for Intermediate Open Pit Scheduling with Variable Slopes

    By Hooman Askari-Nasab

    Open pit mine plans define the complex strategy of displacement of ore and waste over the mine life. The objective of the mine plan is to maximize the future cash flows within the technical and physic

    Oct 1, 2009

  • CIM
    The potential application of natural minerals in ceramic and metal-matrix composites

    By G. J. Kipouros, P. W. Kingston, W. F. Caley

    "Current practice in advanced materials processing has involved the dispersion of a second-phase, commonly SiC, glass, or other non-metallic fibres/whiskers/particulates to enhance physical characteri

    Jan 1, 1993

  • CIM
    Concentrate Drying at Falconbridge Nickel Mines Ltd.

    By P. Maltby

    "Smelter Feed Preparation Falconbridge Nickel Mines Limited, Sudbury Operations, operate 4 mills and a smelter to produce Bessemer Ni-Cu matte for refining in Norway. Approximately 1400 tons of Ni-Cu

    Jan 1, 1972

  • CIM
    Geology of the QR gold deposit, Quesnel River area, British Columbia

    By P. E. Fox, R. S. Cameron

    "The QR gold deposit lies in the Cariboo plateau region of central British Columbia. The deposit was discovered in 1977 and since then a mineable reserve of 1.3 million tonnes grading 4.7 g/t Au has'

    Jan 1, 1995

  • CIM
    Two-Stage Treatment of High Arsenic Synthetic Mine Water at Cold Temperature

    By A. L. Mackie

    Arsenic is a highly toxic element and a known human carcinogen. It is often a contaminant in mine water discharges, particularly from gold mining and roasting operations, and has been found at concent

    Aug 1, 2013

  • CIM
    A laboratory evaluation of the 25 mm Garford bulb anchor for cable bolt reinforcement

    By A. J. Hyett, N. Hedrick, J. Blackall

    The Garford bulb anchor is a modified cable geometry developed and patented by Garford Ply Ltd. of Australia, and which has recently become widely available in Canada. It is produced by deforming the

    Jan 1, 1995

  • CIM
    Integrating Radar Proximity Sensing and Camera Vision to Improve Mining Equipment Safety with Minimal Distraction

    By Nima Nabavi

    Shovels and excavators have significant blind spots due to their large sizes, increasing the chances of collision with other surrounding equipment such as haul trucks, loaders, and dozers. While a cam

    Oct 1, 2009

  • CIM
    The Development of an Aquatic Ecosystem in Trojan Pond, Highland Valley Copper

    By Bob A. Hamaguchi

    The Trojan Tailings Pond at Highland Valley Copper developed in only 15 years from a biologically inactive water body into a productive lake with a well established aquatic ecosystem. This process wa

    May 1, 2001

  • CIM
    Rock Stress Measurement Technique by Using High Stiffness Hydraulic Fracturing System

    By K. Ogawa, T. Yokoyama

    Hydraulic fracturing technique, an applied technique to cause tensile fractures to rock by injecting water pressure to a certain closed section of the borehole, is a measurement method of in-situ rock

    Jan 1, 2015

  • CIM
    Twin Mining?s Diamond Discoveries in Canada?s Arctic

    By Hermann A. Derbuch

    Twin Mining made a conscious decision when it changed from gold mine explorer and developer to become a diamond explorer in Canada?s Arctic. It was a decision of survival in an environment that saw ju

    May 1, 2001

  • CIM
    Ohmic Resistance Control For Copper Tarnishing Process

    By D. M. Bastidas

    The reduction of copper sulfide and copper oxides originated during artificial tarnishing of copper was studied using potentiodynamic potential/current density experiments. Six copper surface treatmen

    Jan 1, 2007

  • CIM
    Spectroelectrochemistry of Enargite II: Reactivity in Acidic Solutions

    By H. Huang, R. N. Gow

    Acidic treatment of enargite (Cu3AsS4) dissolves both arsenic and copper from the mineral and then attempts to separate them in the leach solution. The reactivity of enargite was examined in acidic to

    Jan 1, 2014

  • CIM
    Computer Simulation of the Early Stages of Blown in a Peirce - Smith Converter

    By G. Plascencia, C. López, J. González, D. Jaramillo, M. A. Barrón

    Air jet and molten matte interaction within a Peirce - Smith converter is analyzed during the first stages of blowing using Computational Fluid Dynamics (CFD), by means of the Large Eddy Simulation an

    Jan 1, 2007

  • CIM
    High-Effective Process for the Preparation of A-Al203 Using Secondary Aluminum Dross as Raw Material

    By Qing-hua Tian, Xue-yi Guo, Fei Li

    A novel process for the preparation of a-Al2O3 from secondary aluminum dross was studied. Factors including alkali dross ratio, salt dross ratio, smelting temperature, smelting time, leaching temperat

    Jan 1, 2011

  • CIM
    Haul Roads for Surface Mines in Canada

    By Dwayne D. Tannant

    This paper presents a summary of results from a questionnaire sent to surface mines in western Canada seeking information on haul road design, construction, and maintenance. There has been a marked in

    May 1, 2001