Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Exploration Implications from Variations in Whole-rock and Mineral Chemistry around the Volcanic-hosted Massive Sulfide Deposits of the Que-Hellyer Volcanics, Tasmania, AustraliaBy S M Richardson, A W McNeill, J B. Gemmell
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Hellyer, Fossey, Que River and Mount Charter volcanic-hosted massive sulfide (VHMS) dep
Mar 18, 2015
-
The Technical Library at RisdonSome form of technical library is a necessity for every metallurgical plant, but its form and scope will vary with the conditions of each case. In its simplest form, it may consist of one or two minin
Jan 1, 1934
-
Broken Hill Ore Chute DesignTHE Broken Hill mining field, approximately 31 miles in length, is at present being exploited by seven companies, viz. : North Broken Hill Limited, Junction North Broken Hill No Liability, Broken Hill
Jan 1, 1925
-
Isotopic Constraints on Mineral Diagenesis and Pore Water Evolution in Latrobe Group Sandstones: implications for Basin Hydrology, Oil-Filed Distribution, and Reservoir QualityBy Andrew A. A, Hamilton P. J
Constraints on pore water evolution in the aquifers of a sedimentary basin may be realised through stable isotope analyses of present day waters, and their comparison with water compositions calcula
Jan 1, 1992
-
Constitutional Features of the Mount Isa Sulphide Ores and Their InterpretationSome 800 analyses for Cu, Zn, Pb, Ag, Fe, S, CaO, MgO, C02, Si02 and Al203 were used to examine the elemental constitution of the Mount Isa ores, and, for comparison, those of the Northern Leases area
Jan 1, 1963
-
The Flotation Capacity Project to Increase the Recovery in the Mount Isa Mines Copper ConcentratorBy D R. Carr
The installation of the Flotation Capacity Project flow sheet in the copper concentrator at Mount Isa Mines Limited has recently been completed. The project involved increasing the flotation capacity
Jan 1, 2003
-
Surveying the 1,480 Ft Level Drive, Broken Hill South Limited, Broken HillThe 8 ft by 91/2 ft drive which joined No. 7 Shaft with Browne Shaft on the 1,480 ft level was extended from both ends and met at a point approximately 12,000 ft from No. 7 (2,000 ft from Browne).The
Jan 1, 1965
-
CSIRO Research for the Iron Ore IndustryAustralia's iron ore industry is entering a challenging period with the development of new orebodies, the introduction of new products and the push for further downstream processing. In additio
Jan 1, 1999
-
Adding Value Through Health and Safety PlanningSolid Energy New Zealand Limited has grown significantly since becoming a State Owned Enterprise in 1987. Exports, profit, turnover, output per employee are all trending upwards. The company has iden
Jan 1, 1997
-
The Uses of Electricity in Mining with Special Reference to the Electrical Operations at Mount MorganThat electricity is an important and valuable agent, the limit of whose capacity for utilisation is as yet unknown, is a truism; although enormous advances have been made, the possible developments ar
-
Underground DamsThe limit of pressure to which an underground dam may with safety be subjected, is a question that-as far as the writer knows has not received the same attention from authorities on engineering constr
Jan 1, 1901
-
Landslide Stabilisation at the Clyde Power Project: A Major Geotechnical UndertakingConstruction work on one of the world's largest landslide stabilisation projects is drawing to a close in Central Otago. Begun in mid 1990, major stabilisation work has been carried out on seven
Jan 1, 1992
-
Advances in Continuous Miner AutomationThis paper describes new research and development currently being undertaken by the CSIRO Mining Technology Group to advance the automation capability of continuous mining equipment in underground coa
Dec 6, 2010
-
A Detailed Assessment of Concentrator Performance at Broken Hill South LimitedBy S B. Stewart, C J. Restarick
Over a four-hour period of steady plant operation samples were taken at regular intervals frum points within the grinding and flotation circuits. Size fractions of each composite sample were analysed
Jan 1, 1971
-
Geochemistry of Wallrock Alteration at the Golden Cross Deposit, New ZealandBy J L. Mauk
Golden Cross is a volcanic-hosted, low-sulfidation, epithermal Au-Ag deposit in the Hauraki Goldfield. Irrespective of the rock type (andesite versus dacite), hydrothermally altered wallrocks are enri
Jan 1, 2000
-
Fundamental Study of Acid Drainage Control using FlyashJapan is the largest coal importer in the world, importing from Australia, China, Indonesia, Canada, Vietnam, etc. In Indonesia, most of the produced coal is extracted from open cut mines. More open c
Dec 6, 2010
-
Research Procedure in an Investigation into the Basic Causes of High Tailing Loss at Mt. MorganThe concentration of Mt. Morgan sulphide ore has always been attended by serious loss of gold. Until recently, with a simple selective flotation flowsheet, even the lowest grade of ore milled-about 2
Jan 1, 1939
-
Factors Determining Lead Yields During Electrolysis of PbS Dissolved in Molten ChloridesA study of the electrolysis of PbS in molten PbCl2 showed cathode efficiencies which increased with current density at fixed sulphide concentrations, and decreased with increasing sulphide concentrati
Jan 1, 1973
-
The History of Ore Treatment Processes in Broken HillWHEN mining and treatment first started at Broken Hill only oxidised ores were available. These ores were rich in silver and lead-the silver mainly existing as chloride and the lead as carbonate.Treat
Jan 1, 1928
-
Offences Under the Crown Minerals Act 1991The Resource Management Act 1991 (RMA) and the Crown Minerals Act 1991 (CMA) both came into force on 1 October 1991. The purpose behind RMA was to integrate the existing laws dealing with town and co
Jan 1, 1994