Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Development of Electrostatic Separation Models for the Mineral Sands Industry

    By Morrison R. D, Kojovic T

    Industry-sponsored research at the Julius Kruttschnitt Mineral Research Centre has produced models of high tension roll and electrostatic plate separators operating in mineral sands dry plants. The

    Jan 1, 1991

  • AUSIMM
    General Management and Risk Management

    The current talk of risk management as a separate discipline and management function is like earlier imposition of Quality Control (QC) as an overlay on shoddy production management. Risk management i

    Jan 1, 2007

  • AUSIMM
    Energy Conservation in a Copper Refining Tank House

    Copper refining electrolytes are maintained in the range 60-65¦C to ensure an efficient operation. The heat energy required to meet these temperatures has been traditionally derived from the electrica

    Jan 1, 1985

  • AUSIMM
    Spend a Little to Make a Lot

    With the continued drop in export coal prices (as measured in US$) delivered to the Pacific Rim market, and a fixed annual 12 per cent increase in overburden, Usibelli Coal Mine Inc was faced with t

    Jan 1, 1995

  • AUSIMM
    The Application of the Cavity Measurement System at Olympic Dam Operations

    The Olympic Dam mining operation is some 520 kilometres NNW of Adelaide on the Roxby Downs Pastoral lease. The deposit containing copper, uranium, gold and silver was discovered in 1975 by Western

    Jan 1, 1995

  • AUSIMM
    Dry Screening of Iron Ore at the Operations of Hamersley Iron Pty Limited

    By Artone E

    screening equipment installed in e Hamersley Iron operation is described, and tails of operating parameters and screening - Iia in use are given. Tests were carried out on full-size reens in the op

    Jan 1, 1984

  • AUSIMM
    Implications of High Productivity Long Wall Systems

    The areas of impact when employing high productivity long wall systems are reviewed and the financial implications of the most significant areas highlighted. A distinction has been made between av

    Jan 1, 1988

  • AUSIMM
    Design of Mine Winding Systems

    By Deutsch G. P

    The output of an underground mine often depends entirely on the mine winding system. -Decisions made--at the design stage affect the economy and operation'of the mine'.througb -its entir

    Jan 1, 1973

  • AUSIMM
    A Chemical Characterisation of Pyritic Black Shales in an Iron Ore Mine

    By S Freij, P W, R Gunawan, D Zhang, B Feng

    The Mt Whaleback iron ore mine is located adjacent to Newman, approximately 1200 km north of Perth, in the Pilbara District of Western Australia. Approximately 15 per cent of the waste materials are i

    Jan 1, 2005

  • AUSIMM
    Integrated Resource Asset Management - A Holistic Approach to Information Technology in Mining Operations

    Over the last ten years geological and mining software products have evolved greatly. Software companies developing such products have focussed almost exclusively on the development of technical aspec

    Jan 1, 1999

  • AUSIMM
    Pulp Chemistry, Surface Chemistry, and Flotation

    The bulk and surface chemistry of metal ion hydrolysis and precipitation and the redox chemistry of metal ions, sulphur, and other species is central to an under- standing of flotation. The paper c

    Jan 1, 1984

  • AUSIMM
    Two- and Three-Dimensional Numerical Analysis of the Interaction Between Open Pit Slope Stability and Remnant Underground Voids

    By M E. Pierce

    Recent advances in comminution and heap leach technology have resulted in the development of many large-scale, low-grade open pit mines that coincide with areas of historical underground workings. Two

    Jan 1, 2003

  • AUSIMM
    Small Scale VAT Leaching

    Major exploration companies can have a problem with what to do with small precious metal ore bodies located through exploration programmes. Low tonnage, but high grade, ore bodies too small to justify

    Jan 1, 1990

  • AUSIMM
    A Real-Time GPS kinematic-Positioning System for Automatic Mining Vehicle Guidance

    By Kubik K

    Recent significant advances in the Global Positioning System (GPS) have contributed to making real-time kinematic/dynamic process for decimetre to centimetre-level positioning more reliable and read

    Jan 1, 1997

  • AUSIMM
    Characterisation of Iron Ore from the Jilling Area of Eastern India with a View to Beneficiation

    By A S. Venkatesh, A Das

    The Precambrian iron ore of Singhbhum-North Orissa region of eastern India occurs as part of the horseshoe-shaped broad synclinorium known as the Iron Ore Group (IOG) of rocks, which hosts the most im

    Jan 1, 2007

  • AUSIMM
    Chloridisation of Zinc Ferrite in a HCI/H2O Atmosphere

    By Van Weert G

    Ferrous chloride solution pyrohydrolysis is a successful IICI regeneration process which is carried out in either a spray roaster or a fluid bed. Pyrohydrolysis is not restricted to ferrous chloride

    Jan 1, 1993

  • AUSIMM
    Sampling Coarse Gold-Bearing Mineralisation ù Developing Effective Protocols and a Case Study From the Nalunaq Deposit, Southern Greenland

    By J S. Petersen

    The occurrence of coarse gold particles leading to grade complexity and sampling challenges is a common feature of many gold deposits. Poorly designed sampling protocols applied to these deposit types

    Jan 1, 2005

  • AUSIMM
    Improvements in the Feed Preparation Section of the Whyalla Pellet Plant

    By Fitzpatrick JM

    The feed preparation section of the Whyalla iron ore pellet plant includes a screening and crushing plant followed by dry grinding mills. Improvements in the efficiency of the vibrating screen and

    Jan 1, 1978

  • AUSIMM
    Development and Application of the SHOTPlan TM Blast Sequence Design Software

    By Evans R, McCallum P

    Modem blast initiation systems allow users many options for connection and application in the field, and have resulted in more innovative and complex uses of sequencing to influence blast outcomes.

    Jan 1, 1995

  • AUSIMM
    Cooling Underground Workings North Broken Hill Limited-Case Study

    The subject of heat sources in deep hard rock mines, the limitation of forced ventilation to cope with these heat loads and the sizing of refrigeration plants to boost the cooling effect of the ven

    Jan 1, 1982