Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Use of Non-destructive Testing to Identify Defective Rock Bolts – A Case StudyBy B Jones, M Chappell
Permanent rock bolts used to support rock tunnels are required to perform for the design life of the structure as a minimum. Quality of installation is critical to the performance over the life of the
Sep 17, 2014
-
Virtual Reality Scientific Visualisation – A Solution for Big Data Analysis of the Block Cave Mining SystemBy J Tibbett, A Colebourn, B Hebblewhite, F Suorineni
The concept of Big Data refers to data sets that are so large, variable and/or complex that traditional data processing applications struggle to integrate the data for effective investigation, analysi
Nov 4, 2015
-
Fast, Safe and Fully Mechanised Installation of High-Tensile Chain-Link Mesh for Underground SupportBy V Louchnikov
Ever increasing depth of mineral extraction presents a challenging environment for hard rock underground mines. High in situ stresses and associated seismicity with potential rock burst hazards are th
Mar 21, 2011
-
Iron Ore Mine Reconciliation ù A Case Study From Sishen Iron Ore Mine, South AfricaBy R Moller
Reconciliation at large iron ore operations is a complex and time- consuming process. Often the volume of data and the large range of different stakeholders makes the process almost impossible. Up unt
Jan 1, 2005
-
A New Mine Project - The 3000 and 3500 Copper Orebodies at Mount IsaThe large, high grade 3000 and 3500 copper orebodies at Mount Isa lie greater than 1200 m below the surface, and partly beneath the silver-lead-zinc mining operations at the Isa Mine.Since discovery o
Jan 1, 1993
-
Modelling Geometallurgical Variability - A Case Study in Managing RiskBy S Khosrowshahi, A Weeks, W J. Shaw
"To provide an indication of expected performance of the mine and mill, feasibility studies should include an assessment of the expected day-to-day variability in process plant feed. Attempts to do th
Sep 29, 2013
-
Using technology to support best practice for tailings storage facilities (TSF) management, governance and disclosureBy H Arvidson, A Walker, N Pollock
Following the recent tailings tragedy in Brumadinho, the Investor Mining and Tailings Safety Initiative was formed representing institutional investors in the mining industry. This Initiative, led by
Jul 1, 2021
-
Everyone Has a Plan Until They Get Punched in the Mouth – Creating Trust, Commitment and Results in Tough TimesBy P Moynagh
"A plan is critical but on its own it is a bit one dimensional, the three dimensions critical to success over the long-term, through changing economic, geological and management conditions are:the qua
Nov 15, 2016
-
Quantitative Risk Assessment Tools to Assist with Waste Management and Placement GuidelinesBy S Lehane, S Pearce
The characterisation and assessment of waste rock has been the subject of considerable research, and many guidance documents have been published both internationally and within Australia. While these
Jul 27, 2015
-
Automated joint mapping using the concentric shells algorithmBy P Valenzuela
Joint mapping is a fundamental input for rock mass characterisation and slope stability analysis. The usual way to do it is using a compass in the field or digitising structures on a screen, with a so
Sep 20, 2017
-
Implementation of a management operating system at the Telfer Underground Gold MineBy M Franklin, C Puglisi, S Fitch
Implementation of a well planned and executed Management Operating System (MOS) can result in widespread improvements to operational performance but its success relies heavily on the investment by and
Mar 15, 2021
-
Managing the Closure and Reopening of the South Ramp at Telfer Gold Mine During Sublevel Cave Breakthrough into the Open PitThe Newcrest Mining Limited Telfer Gold Mine consists of an underground sublevel cave (SLC) operation located 734 m directly below active open pit operations. Open pit and underground current producti
Nov 25, 2010
-
Characterisation of respirable dust generated from full scale laboratory concrete cutting tests with conical picks at three stages of wearBy S Slouka
Airborne rock dust poses serious long-term health complications to workers in the underground mining and civil environment where rock excavation is utilised. During drilling, airborne rock particles a
Oct 12, 2022
-
Lease Linkup, North KalgurliThe original leases making up today's North Kalgurli Mines were developed by independent companies on an ad hoc basis. The major disadvantage which now arises is the varying levels of mining hori
Jan 1, 1985
-
Drilling of Shallow Marine Sulfide-Sulfate Mineralisation in the South-Eastern Tyrrhenian Sea, ItalyBy R Sharpe, M D. Hannington, K Perrin, K Simpson, S Petersen, H Gibson, N Augustin, K Lackschewitz, T Monecke
Semi-massive to massive sulfides were drilled in a shallow-water (630 m) hydrothermal system in an island arc volcanic setting at the Palinuro volcanic complex in the Tyrrhenian Sea,Italy. Overall 12.
Jan 1, 2008
-
Monitoring Degradation of Coke within the Blast Furnace via Tuyere Coke SampleBHP Steel International's Newcastle blast. furnaces have operated since their caimissioning on cake based on local low rank coals. In the early 1960's Newcastle coke was believed to be t
Jan 1, 1987
-
Pit Backfilling - Managing Chemically Reactive Mine Wastes and Achieving Rehabilitation ObjectivesBy A A. Puhalovich
The placement of chemically reactive mine wastes in mined out pits (æpit backfillingÆ) is increasingly seen by industry as best practice to manage long-term environmental risks. This is primarily beca
Jul 10, 2012
-
Real-time fluorine mineral sensor – taking research to prototypeBy J Moffatt, T Payten, N Spooner, L Teixeira, L A. Balzan, G Wilkie, G Tsiminis
Fluorine is a penalty element due to its reactive nature. In acidic environments many fluorine minerals dissolve to form hydrofluoric acid (HF), changing processing conditions. When smelted HF can be
Aug 24, 2022
-
A new approach to logging and modelling faults at the Dugald River Pb-Zn-Ag deposit, North West QueenslandBy K George
The Dugald River lead-zinc-silver deposit is located approximately 60 km north-west of Cloncurry and 87 km north-east of Mount Isa. The development project is expected to turn operational in 2018. The
Sep 20, 2017
-
Mine to Mill Reconciliations at Paddington Gold MinePaddington processing plant is located approximately 30 km north of Kalgoorlie on the Menzies Highway and is owned by Placer Dome Asia Pacific. First mining was from the Paddington Pit, but in subsequ
Jan 1, 2003