Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    The Use of Explosives to Backfill and Reclaim Former Quarry Sites

    By Conny Postupack, Jim Petrunyak, John Hope

    The authors discuss the concepts, engineering considerations, and cost relationships involved in the use of drilling and blasting to accomplish backfilling and reclamation with minimum use of mechanic

    Jan 1, 1989

  • ISEE
    Comparison of Highwall Control Methods at Bayswater Colliery

    By Tapan Goswami, Michael Croucher

    At Bayswater Colliery various methods of controlling highwall stabii were investigated. The use of presplitting was trialled and its effectiveness measured. The presplit hole spacing and explosive cha

    Jan 1, 1999

  • ISEE
    Reduction of Air Blast and Flyrock

    By Don Rapp, Rufus Flinchum

    Air blast and flyrock are two of the most critical concerns facing the blaster of today. This paper will provide the blaster with proven procedures for recognizing open face and bench surface problems

    Jan 1, 1993

  • ISEE
    Working With Explosives Suppliers to Optimize Pit Productivity and Costs

    By Thomas J. Snyder

    Modern quarry management should be alert to every opportunity to improve productivity and reduce operating costs. In this paper, the author outlines areas in which explosives suppliers should be encou

    Jan 1, 1988

  • ISEE
    Improving the Amount of Material Cast at Highvale Mine Using Electronic Detonators

    By Robert Slivinski, Kyle Hobbs, Michael Stern, John Willox, Brad Jewson

    Prairie Mines & Royalty Ltd. produces over 12 million tonnes annually of thermal coal for TransAlta’s Sundance and Keephills power stations from the Highvale Mine. This opencast mine is next to a lake

    Jan 1, 2008

  • ISEE
    Blast Fragmentation Size Analysis Techniques and Application Experience

    By Malcolm Scoble, Yves Lizotte, Ajit Singh

    Fragmentation size assessment faces difficult problems, traditionally involving tedious and time consuming procedures. Early work had been directed towards developing empirical methods of predicting r

    Jan 1, 1990

  • ISEE
    Blasting and Excavating on Precarious Rock Slopes

    There is an intuitive tendency to equate rock strength with rock stability, yet the two must be evaluated separately. A slope in strong hard rock is not necessarily stable, nor is a slope in weathered

    Jan 1, 1996

  • ISEE
    Black Thunder Coal Mine and Los Alamos National Laboratory Experimental Study of Seismic Energy Generated by Large Scale Mine Blasting

    By Robert L. Martin, Brian W. Stump, David P. Anderson, David Gross

    In an attempt to better understand the impact that large mining shots will have on verifying compliance with the international, worldwide, Comprehensive Test Ban Treaty (CTBT, no nuclear explosion tes

    Jan 1, 1997

  • ISEE
    Influence of the Geomechanical Characteristics of the Rocks and of the Type of Explosive on the Absorption of the Energy Induced in the Rock by the Explosives

    By F M. Dantini, P Berry

    An experimental investigation on the trend of cratering induced by explosives placed on rock masses was carried out. By using various types of explosives and rocks having different geomechanical param

    Jan 1, 1981

  • ISEE
    Blasting and Monitoring Practices for the MSDGC Deep Tunnel Project

    By Kevin Cole, Dennis A. Clark, F William Laslow

    Since 1976, the Metropolitan Sanitary District of Greater Chicago, (MSDGC), has commissioned the excavation of a tunnel system in the Chicago area, hundreds of feet below the surface in solid limeston

    Jan 1, 1982

  • ISEE
    The Origins and Effects of Inter-deck Pressure in Decked Blasts

    By J. A. Rodgers, K. C. Whitaker

    The time domain during which an explosive detonates and causes rock to fragment and displace is on the order of tens of milliseconds. Because of this, the dynamic processes that occur during this time

    Jan 1, 2000

  • ISEE
    Pre-Bench Blasting Design Based on Risk Analysis on a Quarry

    By Gungor Tuncer, Ali Kahriman, Umit Ozer, Abdul Karadogan, Mehmet Aksoy, Ertugrul Kaya, Deniz Adiguzel

    This research was performed on the quarry that will be opened to produce aggregates and rock filling material at Catalagzi region at Zonguldak providence. Excavations will be done by drilling and blas

    Jan 1, 2009

  • ISEE
    New Dimensions for Drilling and Blasting In Surface Mining of Precious Metals

    By Tom Short, Paul Kunze

    In this paper, the authors describe major changes in drilling and blasting methods instituted at the Zortman And Landusky Mining Company Properties to maintain the viability of these north central Mon

    Jan 1, 1986

  • ISEE
    250 Pound Down-Hole Drilling in Hard Rock

    By R L. Calhoun

    A paper on High Pressure Air must start with the industry accepted definition of High Pressure Air and, for the reader who is unfamiliar with High Pressure Air systems, include basic information on wh

    Jan 1, 1976

  • ISEE
    Field Investigations into Blast Design Parameters of Highly Jointed Rockmass of Overburden: A Case Study of Large Opencast Coalmine (India)

    By V R. Sastry, D P. Singh, N R. Thote

    Rock parameters which are uncontrollable impose restrictions on the procurement of desirable fragmentation. Blast design parameters which are controllable prove to be important tool in blasting operat

    Jan 1, 1995

  • ISEE
    Detecting Cross-Hole Wave Interactions and Charge Malfunctions in Underground Shots

    By Michael S. Wieland

    This report discusses measurement techniques utilized in and trend results obtained from research on delay blasting malfunctions in underground coal shots at the U.S. Bureau of Mines. Charge malfuncti

    Jan 1, 1995

  • ISEE
    Predicting the Envelope of Damage Resulting from the Detonation of a Confined Charge

    By Jason M. Ryan, T Michael LeBlanc, John H. Heilig

    "Drill trajectory deviation is a recurring problem in vertical retreat stoping operations. As a result of thisdeviation, 60 kilogram (165 millimetre diameter) and 103 kilogram (203 millimetre diameter

    Jan 1, 1996

  • ISEE
    MINIMIZING RISK IN URBAN QUARRIES (Two Case Studies)

    By James Goldberg, Sally Zadra, Wiliam Reisz

    Early recognition and risk assessment is critical to sustaining a safe and productive blasting operation. While every blasting environment holds inherent risk, highwall blasting in highly congested ar

    Jan 1, 2008

  • ISEE
    Blast Control Using Accurate Detonators

    By P D. Katsabanis, K Steeves, D Dombrowski

    Accurate electronic detonators with firing time accuracy within 100 microseconds of the nominal have been used to control blast results in terms of fragmentation, vibrations and wall control. Axisymme

    Jan 1, 1995

  • ISEE
    Investigation to Determine the Origin of Air Overpressure from Quarry Blasting

    By R. Franfield, W. J. Birch, L. Bermingham

    Previous researchers have put forward two different theories as to the origin of air overpressure from quarry blasting. In 1980, Siskind et al postulated that the initial face movement gave rise to th

    Jan 1, 2013