Difficulties In Caisson ConstructionBy Ronnie W. Sisk
1. Troubles start early - Inadequate Geotechnical Data A. Owners think they are saving money by allowing limited soil borings at their site. This places a high gamble on the bidders and the Lump Sum
Jan 1, 1988
-
Innovations In Diaphragm-Wall Construction PlantBy Maurice Guillaud
The most striking innovations on diaphragm-wall construction plant are those associated with continuous real-time trajectory monitoring of the excavating tool (either a grab or a hydro-cutter). Th
Jan 1, 2002
-
Prevention Of Landslides With Rows Of Pressed-in Pipe Piles On Steep SlopeBy Takefumi Takuma, Masashi Nagano, Koji Kajino
As part of the construction of a multi-span pre-stressed concrete girder bridge for Japan’s new high speed rail line, landslide preventive piles were installed on the flank of a steep slope. The rotar
-
Implementation Of Alternative Deep Foundation SystemsBy Ray Zelinski
Caltrans sponsored a research project in 1992 which incorporated proprietary and generic pile types. The piles were subjected to axial tensile/compressive loads in deep, soft soils. Descriptions of va
Jan 1, 1993
-
D?Appolonia - Recommended Specifications For The Design Of Foundations, Retaining Walls And Substructures - Final Report Prepared For National Cooperative Highway Research Program Transportation Research Board National Research Council - 4.5 Drvn Pls4.5.1 General The provisions of the article shall apply to the design of axially and laterally loaded driven piles in soil or extending through soil to rock. 4.5.1.1 APPLICATION (Revised Article
Jan 1, 1989
-
Designed, Load Tested, Installed, And Integrity Tested ACIP Piles At Lovers' Key Site In Southwest FloridaBy Gregory A. Stephan
A case history of design, prediction, instrumented static load tests on probe piles, installation monitoring, and integrity testing of production piles is presented. Based upon project-specific subsoi
Jan 1, 1999
-
2013 OPA Winner: Wolf Creek Dam RehabilitationBy Fabio Santillan, Michael F. Zoccola
"Wolf Creek Dam and Lake Cum berland in Russell County Kentucky is operated by the United States Army Corps of Engineers (USAGE) Nashville District It is a combination 3,940 ft long (1,200 m) non-zone
Jan 1, 2013
-
The Practical Application Of Pile Reuse At Bow Bells House, City Of LondonBy Justin Phillips
The redevelopment of Bow Bells House in London has thrown up a number of challenges that will increasingly be faced by developers of congested sites. In the context of pile reuse this paper examin
Jan 1, 2008
-
A Geotechnical Instrumentation Case StudyBy Mehih Demirkan, Kevin Tehansky
Located about an hour drive south from Washington, D.C., the Maryland Transportation Authority (MDTA) contracted with Skanska-Corman-McLean (SCM) to deliver a new Governor Harry W. Nice Memorial/Senat
Apr 1, 2023
-
Assessment of Analysis Techniques for Multi-Plate Anchors in SandBy James P. Hambleton, Anastasia Nally
This work focuses on the numerical simulation of multi-plate anchor systems (e.g., helical anchors) in sand subjected to vertical loading. In assessing the stiffness and capacity of these multi-plate
Jan 1, 2019
-
Case History: Comparison of CSL Results to Physical ObservationsBy David S. Graham, Paul J. Axtell
Crosshole Sonic Logging (CSL) non-destructive integrity testing identified anomalous readings near the base of a 6.5-foot diameter drilled shaft rock socket. The anomaly was confirmed to be a defect b
Jan 1, 2019
-
Practice Of Large Diameter Stepped Section Bored Pile Foundation Of A Deep Water BridgeBy Cen Guoji
The foundation of bored pouring concrete pile have been adopted in the bridge engineering of China since early in the sixties. They demonstrated tremendous technical advantage and achieved notable eco
Jan 1, 1991
-
Construction Of Foundations For Zuari, Mandovi Railway Bridges In Goa ? SynopsisBy N. V. Nayak
Konkan Railway Project is one of the most ambitious railway construction projects in India, involving construction of a 760.km long, Broad Gauge (1676 mm), single track railway line, connecting Roha i
Jan 1, 1996
-
Design, Prediction And Performance Of Tied Back Shotcrete Walls Supporting Masonry Hospital StructuresBy Frank Borda
Two recent projects were completed in Ontario, Canada for major hospital additions that involved excavation support of heritage masonry structures. Conventional continuous caisson wall schemes were re
Jan 1, 2004
-
Drilled Displacement Rigid Inclusions Support Port-Based Cement FacilityBy Morgan NeSmith
The Port of Palm Beach is a full-service landlord port in Riviera Beach, Florida. The port and its tenants process more than $14 billion in commodities. About 80% of these are exports, which makes the
Apr 1, 2023
-
Mixing Proportion Design and Construction Management for Application of Cement Deep Mixing Method to Construction Project on Controlled Final Landfill Site in JapanBy Yoshinori Kurumada, Masaya Watanabe, Kenji Sasa
"The Port of Yokohama is strengthening its international competitiveness as a strategic container port in order to respond appropriately to global exchange and shipping demands. Thus, the Minami Honmo
Jan 1, 2015
-
Evaluation Of Ultimate Resistance Of Steel-Concrete Composite Drilled Shafts Through Static Loading TestsBy Moonkyung Chung
Static pile load tests were performed in order to evaluate bearing capacities and mechanical behaviors of three different pile types: (1) steel-concrete composite drilled shaft with rebar reinforcemen
Jan 1, 2010
-
Wick Drain Guide Specification (Method)"1.0 DESCRIPTIONThis work consists of furnishing all necessary labor, equipment, and materials to install prefabricated vertical (wick) drains in the ground in accordance with the Plans and as specifi
Jan 1, 2014
-
A New Type Of Wave Equation Analysis ProgramBy Don C. Warrington
This paper describes a new wave equation analysis program called ZWAVE, which is a program specifically for external combustion hammers. The program is de-scribed in detail, the discussion dealing wit
Jan 1, 1988
-
Design Of Well Cap, Pier And Well Steiming At The Junction Using Strut-And-Tie Model - SynopsisPier, well cap and steining junction is a complicated 3-d re-ion. The prevalent design procedure for the pier, well cap and steining in isolated manner is not rational. In absence of an integrated app