Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Project DevelopmentBy Randy McMeekin, Chris Twigge-Molecey, J. Peter Blake
The business objectives of a metallurgical project determine targets and constraints, such as the range of products, production capacities, in-service dates, and capital and operating cost parameters.
Jan 1, 2015
-
CIMVal 2003 (Canada) - CIM Standards and Guidelines for Valuation of Mineral Properties (2003)"These standards were developed by the CIM for use with the value or worth of a Mineral Property as opposed to “evaluation” where the key objective is an economic assessment or determination of the ec
Jan 1, 2003
-
The Failure To Define of the Mining Industry Accounting ObjectivesBy MacDonald W. L. F. C. A.
IN accordance with the usual approach to a participation in a panel discussion, this paper is, in some respects, intentionally controversial. I would suggest, how-ever that there is more than a grain
Jan 1, 1962
-
Building on Canadian Capabilities for Space Resource MissionsBy John Ratti
Building on Canadian Capabilities for Space Resource Missions: Space resource science and technology mission building blocks Canadian historical perspective Status and future pursuits It takes
May 1, 2013
-
Application of Huate® New Style Forced-Oil Cooling Vertical Ring Whims in BeneficiationBy Baochun Wang, Hongli Jia, Zhaolian Wang, Fengliang Liu
"Promote and apply a new beneficiation technology and equipment effectively processing the refractory and medium-fine grained weak-magnetic minerals. HUATE® Forced-oil Cooling Vertical Ring WHIMS adop
Jan 1, 2016
-
Pull Tests as a Measure of Roof Bolt Efficiency and of Roof Bolt DesignBy T S. Cochrane
A variety of practical tests have been tried in the mining industry to determine the support properties of mine roof bolts. Such tests include torsion wrench readings, hammer blow tests and the use of
Jan 1, 1963
-
Financial Risk Analysis of a Carbon Fines Capture MethodologyBy M. Somppi, D. Weirmeir, Z. Yamak
"Milling operations commonly employ activated carbon to capture complexed gold from lixiviants in leaching processes. As the carbon moves through pipes, pumps, vessels, kilns and other processes in th
Jan 1, 2019
-
Kitsault (Lime Creek) molybdenum mine, northwestern British ColumbiaBy C. J. Hodgson
"IntroductionThe Kitsault molybdenum mine is located 600 m above sea level on Lime Creek at the head of the inlet of Alice Arm, 140 km northeast of Prince Rupert, British Columbia (Fig. 1). The area o
Jan 1, 1995
-
Sulphur potential of the Wabamun Group, AlbertaBy Victor F. Hollister
Elemental sulphur occurs as aformational sedimentary deposit in Upper Devonian Wabamun evaporites near Coronation, Alberta. The deposit developed in a stratigraphic jacies-change lrap; it is assumed t
Jan 1, 1984
-
Profitable Production: Nevada's First Paste Backfill PlantAbout Barrick Paste Backfill at Barrick Goldstrike Rodeo Paste Plant Cyclone Lab Testing Challenges and Lessons Learned Future Barrick Projects
May 1, 2013
-
A Holistic Approach To Evaluating Battery Electric Vehicles For Underground MinesBy Nicholas Bonderoff, Amily Xu
The evaluation of battery electric vehicles (BEVs) in underground mines involves comprehensive business case analysis beyond just the capital and operating costs of the equipment itself. BEVs demonstr
Jan 1, 2023
-
Potassium--Argon Dates of Diabase Dyke Systems, District of Mackenzie, N.W.T.By R A. Burwash
In the Yellowknife geologic province, 2,600-million-year-old granites are cut by three sets of diabase or gabbro dyke : (1) large dykes striking 70°E to E-W, (2) rare dykes striking N-S to 30°E and (3
Jan 1, 1963
-
Advocate Mines Limited asbestos depositBy M. J. Collins
The Advocate Mines Limited asbestos property is 6 km north of Baie Ve rte on the northeast coast of Newfoundland. Mining began in the early 1960s and was concluded in 1981. The chrysotile asbestos dep
Jan 1, 1984
-
Rail-Veyor® An Energy Efficient Alternative to Material HaulageBy Patrick Fantin
Mining ? The Past Safety Not a priority; Health Not a priority; Energy Manual Labour; Horsepower? Literally. Financially Robust For the Owner?s; Mining ? The Future Safety Ze
May 1, 2013
-
Designing And Implementing A Maintenance Program With Sap In The Paranapanema GroupBy J. R. Pacheco
Paranapanema group has decided to implement the business system SAP R/3 in all companies of the group in order to replace all current applications. This project has taken nine months to be completed.
Jan 1, 2007
-
The Electric Mining Shovel - Designed for DiggingBy K. D. Bulin
"An interesting brief history review of shovels as the primary excavating tool will permit the reader to see that immeasurable development and resources have preceded the shovel excavators which today
Jan 1, 1973
-
Translation of Environmental Leadership Objectives Into Routine Project Execution for the Uranium Mining Industry.By Jeremy Breker
Cameco aligns its social and environmental responsibilities with its vision, mission and values. Environmental Leadership is established as a corporate objective that emphasizes the triple-bottom-line
Aug 1, 2010
-
Key Factors Affecting Nickel Recovery during the Segregation of Laterite OresBy Eric J. Grimsey, Don C. Ibana, David E. Grimsey
The segregation process as applied to nickel laterite ores involves the formation of gaseous nickel and iron chlorides which are subsequently reduced to form ferronickel on the surface of a solid carb
Jan 1, 2017
-
Vapour phase titanium productionBy D. G. Tisdale, W. Curlook, J. M. Toguri
"In this study, the vapour phase reduction of titanium tetrachloride conforms to the traditional Kroll chemistry, but employs argon as an inert carrier gas and requires a higher reaction temperature o
Jan 1, 1997
-
AC drive application issuesBy A. C. Stevenson
"There are many critical application issues that affect all AC drives, but there are several that are absolutely mandatory for pulse width modulated (PWM) AC drives. If these rules are not followed, t
Jan 1, 2000